Found 21 inspection:

# 632201567177
Unscheduled inspection
Start date: 2022-01-26, end date: —, duration:
Authority:
Purpose of inspection:


# 632101359666
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100592821
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100534751
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: proverka predpisaniya №01-05-08/0578-1 ot 30.07.2021, izveschenie ob ustranenii narushenii ot 16.08.2021 vh.№ 4297


# 632100281986
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-02-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 631903898424
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631903897567
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631903995930
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 631903995919
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631903627555
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority:
Purpose of inspection:


# 631903609131
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 631903556015
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 631903556004
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 631902735890
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 631902735810
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 631902466706
Unscheduled inspection
Start date: 2019-02-06, end date: —, duration:
Authority:
Purpose of inspection:


# 631902466680
Unscheduled inspection
Start date: 2019-02-06, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 631902524926
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-03-06, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631902524881
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-03-06, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631801760485
Unscheduled inspection
Start date: 2018-10-10, end date: —, duration:
Authority:
Purpose of inspection:


# 631801760261
Unscheduled inspection
Start date: 2018-10-10, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.