Found 26 inspections:

# 00170802816304
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-01, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the technical condition and safe operation of thermal power plants and heating networks


# 742101418914
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration:
Authority:
Purpose of inspection:


# 742101325286
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 742100753796
Unscheduled inspection
Start date: 2021-09-21, end date: 2021-09-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the monolithic grillwork of the attached part, the installation of basement structures and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742005180571
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741903080729
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902720389
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902477009
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 2nd to the 5th floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802149385
Unscheduled inspection
Start date: 2018-12-06, end date: 2018-12-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the basement structures in axes 58 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 00170802816304
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-01, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the technical condition and safe operation of thermal power plants and heating networks


# 74170701810998
Unscheduled inspection
Start date: 2017-07-21, end date: 2017-08-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on landscaping of the house territory with the installation of small architectural forms after the actual completion of work, compliance with measures to ensure access for low-mobility groups of the population, facade work, installation of pits at the entrance to the basement, installation of porches after the actual completion of work, compliance with fire and sanitary epidemiological measures and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation2 Verification of the completed construction of the facility 3 Availability of a construction permit 4 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701737623
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-06-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works after the actual completion of work, landscaping of the adjacent territory before the laying of asphalt concrete, the device of the power supply system for low-current switchboard systems after the actual completion of work, compliance with fire and sanitary epidemiological measures after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Meeting the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701623355
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof waterproofing work after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701651940
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701478073
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal cold and hot water supply systems for heating and sanitation of boiler room entry points after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701397619
Unscheduled inspection
Start date: 2017-02-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160701261442
Unscheduled inspection
Start date: 2016-12-28, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701243084
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701114859
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the capital construction facility 2 Receipt of a construction permit 3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701096066
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-11-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the foundation plate for the extension in axes 1216AN and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701149067
Unscheduled inspection
Start date: 2016-11-30, end date: 2016-12-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 810 floors of the structures of the technical floor of the parapet with the filling of window openings of 610 floors before the slopes and installation of window sills and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of permits for building3 Meeting the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701120007
Unscheduled inspection
Start date: 2016-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701041809
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700974068
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of a pile field attached to a residential building, the installation of a grillage for a residential area in axes 112AN and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700068707
Unscheduled inspection
Start date: 2016-09-01, end date: 2016-09-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of HR 23 Art 52 of the Urban Planning Code of the Russian Federation


# 74160700062474
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the object2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation