# 002005273656
Unscheduled inspection
Start date: 2020-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101291698
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101209930
Unscheduled inspection
Start date: 2021-10-12, end date: 2021-10-22, duration: 9
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/210 dated 30.04.2021 issued by SK INTEG LLC, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 30.04.2021 No. 29-17-29/210, issued by SK INTEG LLC.
# 662100420747
Unscheduled inspection
Start date: 2021-08-18, end date: 2021-08-30, duration: 9
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/292 dated 06/08/2021 issued by SK INTEG LLC. The purpose of this inspection is to carry out regional state construction supervision.
The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 06/08/2021 No. 29-17-29/292, issued by SK INTEG LLC.
# 662100387185
Unscheduled inspection
Start date: 2021-08-05, end date: 2021-08-13, duration: 7
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/290 dated 06/03/2021 issued by SK INTEG LLC. The purpose of this inspection is to carry out regional state construction supervision.
The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 06/03/2021 No. 29-17-29/290, issued by SK INTEG LLC.
# 662100213831
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100213782
Unscheduled inspection
Start date: 2021-06-01, end date: 2021-06-10, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100000641
Unscheduled inspection
Start date: 2021-02-09, end date: 2021-02-28, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100034841
Unscheduled inspection
Start date: 2021-02-26, end date: 2021-03-26, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-19-22/265.2 dated December 09, 2020, issued by SK INTEG LLC. The purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 09.12.2020 No. 29-19-22/265.2, issued by SK INTEG LLC.
# 002005273656
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-22, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by SK INTEG LLC of the points of the previously issued instruction on the elimination of identified violations dated 23112020 RP3323898o, the deadline for which expired on the basis of the request of SK INTEG LLC dated 04122020 2621 bx 33022090 dated 07122020 to conduct an audit in order to recognize the regulations as fulfilled.
# 002005226527
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-11-23, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued regulations on the elimination of identified violations from 18022020 RP332202o from 23062020 RP3321764o from 18022020 RP332201o
# 662004390275
Unscheduled inspection
Start date: 2020-04-13, end date: 2020-04-17, duration: 5
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations of the task implementation of regional state construction supervision Subject to the implementation of a previously issued instruction on the elimination of identified violations of mandatory requirements
# 742004259271
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004194011
Unscheduled inspection
Start date: 2020-01-15, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661904061447
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707737 P dated October 25, 2019 Task to carry out state construction supervision Subject to the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707737 P dated October 25, 2019
# 661903941344
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-12-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to verify the fulfillment of the previously issued regulation 291507304P dated 25102019the task is to carry out state construction supervision. The purpose is to verify the compliance of the work and applicable building materials at the capital construction facility Reservoirs of the Municipal Unitary Enterprise Vodokanal of the Verkhnyaya Pyshma city district in the amount of 3 pieces located at the address Sverdlovsk region Verkhnyaya Pyshma ul. Baltymskaya d 2a the results of such work with building codes and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities
# 661903948051
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-12-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated September 13, 2019 291307332 P The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated September 13, 2019 291307332 P
# 661903889240
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707534p dated September 06, 2019. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707534p dated September 06, 2019.
# 741903824932
Unscheduled inspection
Start date: 2019-10-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903363918
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707437 P dated July 19, 2019 Task to carry out state construction supervision Subject to the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707437 P dated July 19, 2019
# 661903694207
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-22, duration: —
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: Purpose compliance with labor legislation citizen's appeal for non-payment of amounts due Task Supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms Subject compliance with mandatory requirements and or requirements established by municipal legal acts
# 661902880596
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707202p2 dated May 17, 2019. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707202p2 dated May 17, 2019.
# 741902855528
Unscheduled inspection
Start date: 2019-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902799863
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-07-10, duration: —
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: In order to protect the rights and interests of employees in connection with the consideration of an application from 23052019 667300719 on violations of labor legislation, the objectives of this audit are supervision and control over compliance with labor legislation and other normative legal acts containing labor law norms. The purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 661902751805
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902715716
Unscheduled inspection
Start date: 2019-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902485860
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902456313
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-01-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707791P dated 30112018 The task is to carry out state construction supervision The subject is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707791P dated 30112018
# 661902435924
Unscheduled inspection
Start date: 2019-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661802211059
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707568p2 dated October 09, 2018 task implementation of regional state construction supervision the subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707568p2 dated October 09, 2018
# 721802333879
Unscheduled inspection
Start date: 2018-12-11, end date: 2019-01-15, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations in accordance with the order dated 26112018 147618l based on the notice dated 04122018 on the elimination of violations during the construction of reconstruction of capital construction facilities Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of a multi-storey capital construction facility residential building in Tyumen located at the address Russian Federation Tyumen region Tyumen Lesoparkovaya street d9
# 661802129634
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801681840
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707540 dated August 13, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707540 dated August 13, 2018.
# 721802041469
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801967318
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of paragraphs 313/10 of the previously issued order to eliminate the identified violation of mandatory requirements dated August 13, 2018 291707540 The objectives of this audit are the implementation of regional state construction supervision 7 The subject of this audit is the implementation of paragraphs 31 310 of the previously issued order to eliminate the identified violation of mandatory requirements dated August 13, 2018 291707540
# 721801975740
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations as prescribed by 17072018 77318l Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of a multi-storey residential building in Tyumen located at the address Russian Federation Tyumen region Tyumen city Lesoparkovaya street d9
# 661800615680
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-31, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707334 p dated June 08, 2018 task implementation of regional state construction supervision subject to the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707334 p dated June 08, 2018
# 661800582308
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707302p dated June 04, 2018. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291707302p dated June 04, 2018.
# 661800561715
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-08-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated June 04, 2018 291707302p The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated June 04, 2018 291707302p
# 661800509031
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291705252 dated May 04, 2018 the task is to carry out regional state construction supervision the subject is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291705252 dated May 04, 2018
# 721800501829
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification dated 04062018 3 on the completion dates of works subject to inspection during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of a multi-storey residential capital construction facility a house in Tyumen located at the address Russian Federation Tyumen region Tyumen city Lesoparkovaya street d9
# 661800261059
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-04, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29170757 p dated February 13, 2018 tasks to carry out regional state construction supervision subject to the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29170757 p dated February 13, 2018
# 661800235943
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-04, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707125 dated March 14, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707125 dated March 14, 2018.
# 661800338541
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to review the received application from 23042018 incoming 29016396571. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and applicable building materials during the reconstruction of the capital construction facility "Reconstruction of the Olympic Reserve School building at 43 Verkhnyaya Pyshma St. Petrova under the building of elementary school 25 for 600 places" located at 43 Petrova St., Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of technical regulations, sanitary and epidemiological rules and regulations, safety rules and state standards for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 and 3 Article 52 of the Urban Planning Code of the Russian Federation
# 721800242730
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 661800094476
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-03-20, duration: —
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: in connection with the consideration of the application, supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms, compliance with mandatory requirements or requirements established by municipal legal acts
# 72170803029236
Unscheduled inspection
Start date: 2017-12-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802567514
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802783343
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-03, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the execution of the previously issued order to eliminate the identified violation of mandatory requirements 291705R2636 P dated September 22, 2017. The subject of this inspection is the fulfillment of the previously issued order to eliminate the identified violation of mandatory requirements 291705R2636 P dated September 22, 2017. The purpose of this inspection is to carry out state construction supervision
# 66170802166432
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701888368
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of this audit is the fulfillment of the previously issued instruction on the elimination of violations during the construction of a capital construction facility dated July 26, 2017 291302440 the purpose of this audit is to carry out state construction supervision
# 66170701798679
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the implementation of paragraphs 312 of the previously issued order to eliminate the identified violation of mandatory requirements 291705R2360 P2 dated June 02, 2017. The subject of this inspection is the implementation of paragraphs 312 of the previously issued order to eliminate the identified violation of mandatory requirements 291705R2360 P2 dated June 02, 2017. The purpose of this inspection is to carry out state construction supervision
# 66170701787221
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Building of a specialized fire rescue unit for protection from emergencies and large wildfires with a parking garage for fire trucks on the ground floor with an underground single-level parking lot 5 on ROM" located at 47a Radishchev Street, Yekaterinburg, Leninsky district, the results of such work with the requirements of technical regulations, sanitary and epidemiological rules and regulations, safety rules and state standards for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701722073
Unscheduled inspection
Start date: 2017-06-21, end date: 2017-06-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: In order to monitor the implementation of the previously issued order to eliminate identified violations of mandatory requirements 29190597 dated May 10, 2017, the objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate identified violations of mandatory requirements 29190597 dated May 10, 2017
# 66170701556214
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701543246
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the execution of the previously issued order to eliminate the identified violation of mandatory requirements 291705X2143 P2 dated March 13, 2017. The subject of this inspection is the fulfillment of the previously issued order to eliminate the identified violation of mandatory requirements 291705X2143 P2 dated March 13, 2017. The purpose of this inspection is to carry out state construction supervision
# 66170701482174
Unscheduled inspection
Start date: 2017-03-28, end date: 2017-04-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: verification of compliance of the work and applicable building materials during the construction of the capital construction facility "Building of a specialized fire rescue unit for protection from emergencies and large wildfires with a parking garage for fire trucks on the ground floor with an underground single-level parking lot 5 on ROM" located at 47a Radishchev Street, Yekaterinburg, Leninsky district, the results of such work with the requirements of technical regulations and sanitary and epidemiological rules safety regulations and state standards for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701369093
Unscheduled inspection
Start date: 2017-02-09, end date: 2017-03-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291704c7824 p2 dated December 21, 2016. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291704c7824 p2 dated December 21, 2016.
# 66170701347900
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-10, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the execution of the previously issued order to eliminate the identified violation of mandatory requirements 291704P2845 P2 dated December 27, 2016. The subject of this inspection is the fulfillment of the previously issued order to eliminate the identified violation of mandatory requirements 291704P2845 P2 dated December 27, 2016. The purpose of this inspection is to carry out state construction supervision
# 66170701295580
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66160701248942
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The Urban Planning Code of the Russian Federation Federal Law No. 294 FZ of December 26, 2008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Implementation of State Supervision and Municipal Control" Decree of the Government of the Russian Federation No. 01022006 54 "On State Construction Supervision in the Russian Federation" Rostechnadzor Order No. 26122006 1129 "On Approval and Implementation of the Procedure for Conducting inspections during the implementation of state construction supervision and the issuance of conclusions on the compliance of constructed reconstructed renovated capital construction facilities with the requirements of technical regulations, norms and rules of other regulatory legal acts of the project documentation" Resolution of the Government of the Sverdlovsk Region dated 27052015 431PP "On Approval of the Regulations on the Structure of the maximum staffing limit and the Monthly Salary Fund of the Department of State Housing and Construction Supervision of the Sverdlovsk Region regions"
# 66160700393303
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-10-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of this audit is the fulfillment of the previously issued order to eliminate the identified violation of mandatory requirements 292204x7500 p dated August 05, 2016. The purpose of this audit is to carry out state construction supervision. This audit is conducted to monitor the fulfillment of the previously issued order to eliminate the identified violation of mandatory requirements 292204x7500 p dated August 05, 2016