Found 51 inspection:

# 142101213244
Unscheduled inspection
Start date: 2021-10-13, end date: —, duration:
Authority:
Purpose of inspection:


# 142101290806
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-15, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on November 06, 2020, compliance with the construction of the capital construction facility by the developer, technical customer, person carrying out construction, mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction, reconstruction of the capital construction facility prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 142100351580
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-08-06, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: verification of the facts of non-placement of information, incomplete placement of information or placement of false information in the state information system of housing and communal services, set out in the joint appeal of the Ministry of Labor and Social Protection of the Russian Federation and the Ministry of Construction and Housing and Communal Services of the Russian Federation No. A1-10418 dated 03.12.2020, Order of the Ministry of Construction of the Russian Federation No. 193/pr from 30.03.2021, prevention, detection and suppression of violations of mandatory requirements of housing legislation, compliance with mandatory requirements compliance with requirements for the placement of information in the State information system of housing and communal services


# 142100384636
Unscheduled inspection
Start date: 2021-07-29, end date: 2021-08-06, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on November 06, 2020, compliance with the construction of the capital construction facility by the developer, technical customer, person carrying out construction, mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction, reconstruction of the capital construction facility prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 142100221681
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-06-01, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: check in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha (Yakutia), 28 January, 2021, compliance during the construction of the object of capital construction, developer, technical, customer, person engaged in the construction, mandatory requirements in the field of construction and construction materials used (products), the established order of construction, reconstruction of capital construction object, prevention, detection and suppression approved developer, technical coordinator and the person performing the construction on the basis of an agreement with the developer or the customer (hereinafter the contractor), violations of the legislation on town-planning activities, including project documentation., compliance with mandatory requirements and (or) the requirements established by municipal legal acts; the conformity of the information contained in the notice of initiation of certain types of entrepreneurial activities, the mandatory requirements; compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status, special permission (license) to carry out certain types of activities or authorization (approval) to exercise other legal actions, if the conducting unscheduled inspections of the legal entity, individual entrepreneur provided the rules for the provision of legal status, a special permit (license), authorization (approval) the mandatory requirements, as well as data about the specified legal entities and individual entrepreneurs, contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other Federal information resources; implementation of the requirements of the state control (supervision) bodies and municipal control; events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm


# 142005271622
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-25, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on March 11, 2019, compliance with the mandatory requirements in the field of construction and applied building materials products of the established procedure for construction reconstruction of the capital construction facility by the developer, the technical customer, the person carrying out the construction


# 142005255124
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 142004478774
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-21, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including among the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 142004409154
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-06-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation1 by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 Verification of the completed construction of the object 1 Compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results such works meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 142004298393
Unscheduled inspection
Start date: 2020-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 141903990735
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-11-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, in accordance with the program of inspections 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation The requirements of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 141903454050
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, in accordance with the program of inspections 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation The requirements of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 141903454031
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 141902860592
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902892893
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, in accordance with the program of inspections 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation The requirements of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902726775
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902726769
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer and the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this audit is according to the verification program1 compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902730549
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-05-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation on the prescription and on notification of the elimination of the prescription with a request for an extension of the elimination period


# 141902719453
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Development Code of the Russian Federation to the inspection program


# 141902736030
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902736012
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer and the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this audit is according to the verification program1 compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902726662
Unscheduled inspection
Start date: 2019-03-14, end date: —, duration:
Authority:
Purpose of inspection:


# 141902566725
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-03-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is according to the program of inspections 1 compliance of the work and the construction materials used in the construction process of the reconstruction of the capital facility construction as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902726666
Unscheduled inspection
Start date: 2019-03-04, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902557518
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-04-01, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: verification of the execution of a previously issued regulation of the supervisory authority


# 141902537885
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is according to the program of inspections 1 compliance of the work and the construction materials used in the construction process of the reconstruction of the capital facility construction as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902448262
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141802393803
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the audit is carried out in order to verify compliance by persons engaged in attracting citizens' funds for the construction of an apartment building with the mandatory requirements established by the legislation on participation in shared-equity construction on the basis of an appeal dated 13122018 bx 18037 from a participant in the shared-equity construction of the object "Apartment building 1 stage 1 as part of the construction "Apartment building 1 in block 9 a of gYakutsk 1 and 2 stages" The objectives of this audit are to prevent, identify and suppress violations of the requirements established by the legislation on participation in shared-equity construction committed by developers by persons engaged in attracting citizens' funds for the construction of apartment buildings and or other real estate objects


# 141802185096
Unscheduled inspection
Start date: 2018-12-06, end date: 2018-12-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 141802301261
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the actual elimination of violations prescribed for elimination by regulation 040894118 of October 19, 20181 compliance of work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141802155452
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the Verification Program 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141801798007
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 141801941471
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 141800587312
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-08-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the Verification Program 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800587619
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 141800567701
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is to verify the completed construction of the object 1 Compliance of the work and the construction materials used during the construction of the capital object construction as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800487441
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the Verification Program 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800487398
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the actual elimination of violations prescribed for elimination by regulation 040829818 of May 08, 2018 1 compliance with the execution of works and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800424977
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention identification and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by Parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation As prescribed


# 141800469319
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-06-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is According to the verification program 1 compliance of the work and the construction materials used during the construction of the reconstruction of the capital facility construction as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800255368
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-06, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the actual elimination of violations prescribed for elimination by regulation 0408113317 of September 25, 20171 compliance of work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800325596
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is According to the verification program1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170802627556
Unscheduled inspection
Start date: 2017-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 14170802508360
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 14170802197816
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is to verify the actual elimination of the identified violations prescribed for elimination by regulation 040875517 of July 28, 20171 compliance with the performance of works and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170701892284
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-08-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer and the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this audit is according to the verification program1 compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170701892264
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-08-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer and the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this audit is according to the verification program1 compliance with the performance of works and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170701801881
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is according to the verification program compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701801858
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is according to the verification program compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701609786
Unscheduled inspection
Start date: 2017-05-17, end date: 2017-06-05, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or by a technical customer on the basis of an agreement between an individual or a legal entity on the verification program


# 14170701411249
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or by a technical customer on the basis of an agreement between an individual or a legal entity on the verification program


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.