Found 3 inspections:

# 291800526443
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the implementation of the previously issued instruction of the Pechora Department of Rostechnadzor on the elimination of violations during the construction of the reconstruction of the capital construction facility from 25052018 250313N183855 P Verification of the elimination by a legal entity of the violations identified in the instruction of the Pechora Department of Rostechnadzor on the elimination of violations during the construction of the reconstruction of the capital construction facility from 25052018 250313N183855 P Fulfillment by a legal entity of the instruction of the Pechora Department of Rostechnadzor on the elimination of violations during the construction of the reconstruction of the facility capital construction from 25052018 250313H183855 P


# 83170701399924
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-17, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Installation of oil heaters on pipelines of the Toraveysky oil field" as well as the results of such work with the requirements of technical regulations, other normative acts and project documentation Verification of work in accordance with paragraph 1 of the Verification Program Verification of compliance by a legal entity with the requirements of legislation on urban development, environmental legislation, sanitary standards and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Installation of oil heaters on pipelines of the Toraveysky oil field" with metering devices for energy resources used, Compliance of the construction materials used during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements equipment of the capital construction facility "Installation of oil heaters on pipelines of the Toraveysky oil field"Compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation and compliance with the regulations issued during the implementation of federal state construction supervision and construction control


# 34170701424169
Unscheduled inspection
Start date: 2017-03-02, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.