Found 1 inspection:

# 00160601506575
Unscheduled inspection
Start date: 2016-03-09, end date: 2016-03-15, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements for the preparation of the land plot and the performance of excavation works for the installation of foundations of structures of underground and aboveground parts of engineering support networks, including internal and external networks of engineering systems and equipment on the basis of the order of the West Ural Department of Rostechnadzor dated 22122015 16prk and a notice from Novy EkoGorod LLC on the beginning of construction reconstruction and overhaul of the capital construction facility construction from 18122015


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.