Found 26 inspections:

# 562101202545
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 562101147136
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in connection with the receipt of a notice of completion of the capital construction facility; - the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation). The subject of this review is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; 2) building permit requirements; 3) the requirements established by parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 562101279984
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562100349871
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration:
Authority:
Purpose of inspection:


# 562100333373
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562100333310
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 562100333242
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program; - the objectives of this audit are: to identify and prevent violations of the legislation on urban planning activities committed by the builder, and to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources. The subject of regional state construction supervision in respect of capital construction facilities specified in Part 1 of Article 54 of the Urban Development Code of the Russian Federation is the inspection: - compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for used energy resources;


# 562105326185
Unscheduled inspection
Start date: 2021-01-28, end date: 2021-02-04, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program; - the objectives of this audit are: to identify and prevent violations of the legislation on urban planning activities committed by the builder, and to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources. The subject of regional state construction supervision in respect of capital construction facilities specified in Part 1 of Article 54 of the Urban Development Code of the Russian Federation is the inspection: - compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for used energy resources;


# 562005257748
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-18, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: The objectives of this audit are to identify and prevent violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, legislation on urban development, Part 2, Article 51, Part 2, Article 3, 31, 6, and Article 52 of the Urban Planning Code of the Russian Federation. The subject of this audit is compliance with the requirements of mandatory urban planning legislation is the compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code The Russian Federation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources


# 562005257700
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-18, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the inspection program approved by 26052020 the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources legislation on urban development h 2 art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to ensure compliance with the requirements of mandatory urban planning legislation, compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 The Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources


# 562004471644
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-07, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the inspection program approved by 06072020 the objectives of this inspection are to identify and prevent violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources legislation on urban development h 2 art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to ensure compliance with the requirements of mandatory urban planning legislation, compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 The Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, paragraphs 1-3 of the inspection program from 06072020


# 562004450685
Unscheduled inspection
Start date: 2020-07-08, end date: 2020-07-24, duration: 13
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms Identifier of the state function 10001244260


# 562004471570
Unscheduled inspection
Start date: 2020-07-31, end date: 2020-08-07, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the inspection program approved by 180-52020 the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used legislation on urban development h 2 art 51 h 2 3 31 6 Art 52 Urban Planning Code of the Russian Federation 7 The subject of this audit is compliance with the requirements of mandatory urban planning legislation, compliance of the work performed and the building materials used during the construction and reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, paragraphs 1-3 of the inspection program from 06072020


# 562004418679
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: compliance with the requirements of mandatory urban planning legislation compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, paragraphs 1 to 3 of the inspection program from 180-52020 to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for the energy resources used in clause 13 of the inspection program from 180-52020.


# 562004418664
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: compliance with the requirements of mandatory urban planning legislation compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, paragraphs 1 to 3 of the inspection program from 1604 to 2020 to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources p 13 of the inspection program from 16042020


# 562004405338
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-05-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of completion of construction dated 240-42020. The objectives of this inspection are to identify and prevent violations of urban planning legislation and project documentation committed by the developer, including the requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work performed and the construction materials used in during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation code 22019 of NPO SOYUZ LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, meeting the requirements of Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, eliminating violations identified during construction control and State construction supervision registration and submission of executive documentation


# 562004292877
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-10, duration:
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: about


# 562004300117
Unscheduled inspection
Start date: 2020-02-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562004193923
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of completion of construction dated 09.012020 bx 06. The objectives of this inspection are to identify and prevent violations of urban planning legislation and project documentation committed by the developer, including the requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of completed works and applied construction materials during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation code 22019 of NPO SOYUZ LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, meeting the requirements of Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, eliminating violations identified during the construction process control and state construction supervision registration and submission of executive documentation


# 561904063720
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the notice of completion of construction bx 2887 dated 02122019 received from Specialized Developer Zhilstroicity LLC dated 02122019. The objectives of this audit are to identify and prevent violations of the legislation on urban development activities committed by the developer. work performed in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used. compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and with the requirements for equipping the capital construction facility with metering devices for energy resources used


# 561903918282
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the notice of completion of construction BX 2543 dated 28102019 received from Specialized Developer Zhilstroicity LLC. detection and suppression of violations of legislation on urban development activities by the developer. performance of work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the work and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, meeting the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, ensuring accessibility for disabled people, social engineering and transport infrastructuresin relation to the facilities specified in part 11 of Article 54 of the Urban Planning Code of the Russian Federation, it is necessary to verify, as indicated in the construction permit, the compliance of the parameters of capital construction facilities with the maximum parameters of permitted construction reconstruction of capital construction facilities established by the rules of land use and development, documentation on the layout of the territory and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code Of the Russian Federation by other federal laws in the event that the construction or reconstruction of a capital construction facility does not require


# 561903881083
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 561903368520
Unscheduled inspection
Start date: 2019-09-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 561903042362
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the notification received from 23082019 on the fulfillment of violations in accordance with the issued instruction until 28082019the detection and suppression of violations of the requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used legislation on urban development h 2 art 51 h 2 3 31 6 Art 52 Urban Planning Code Russian Federation compliance of work performed and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation code 141800001, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used in the installation of a building's supporting frame, walls, partitions, staircases, platforms, provision of executive documentation, compliance with urban planning legislation h 2 art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation


# 561902900454
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 561902905952
Unscheduled inspection
Start date: 2019-08-02, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.