# 721801938176
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-09-14, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 06082018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of the section of the heating main 5 along Energetikov Street from the heat chamber 5K9 to the chamber 5C2 with a diameter of 2Du800 L = 139 m in two-tube calculation" located at the address Tyumen region, Tyumen, Energetikov Street tp1