Found 38 inspections:

# 742005214115
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 742004354834
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of the work on the installation of the underground part of the heating main in impassable reinforced concrete trays with the laying of supply and return pipelines in the area from UP 1490 to U 990 for the installation of drainage wells and a thermal chamber TK 2 and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources.2 Availability of a construction permit.3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation.


# 742004305906
Unscheduled inspection
Start date: 2020-02-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741904082687
Unscheduled inspection
Start date: 2019-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 741903965894
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work: painting of an above-ground gas distribution pipeline during the work, conducting leak tests of high and low pressure gas pipelines during the work, restoring landscaping of the construction site after completion of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of this Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply and equipment of the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903896631
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-11-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of underground PE sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling installation during work and construction materials used during construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements of the capital construction facility metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903810665
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 741903631612
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-09-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Execution of the regulation from 23082019 with a deadline until 23092019 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903572620
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902939965
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the work performed, the installation of a section of a high-pressure gas pipeline to the PHB during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902978339
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of PHB in the process of work, PHB strapping, lightning protection of electricity supply during work, painting of an above-ground gas distribution pipeline during work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902819626
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 741902887623
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during the work installation of an underground PE distribution gas pipeline during the work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741902763195
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-06-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of axes during excavation work on trench construction and on filling the sandy base for underground laying of heating mains pipelines in the area from PK 1 to UP 9 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 Urban Planning Code Russian Federation


# 741902764166
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work execution organization of the construction site breakdown of the gas pipeline route installation of aboveground sections of a low-pressure gas pipeline drilling of pits for supports installation of concrete foundations of supports installation of supports installation during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741902819595
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-06-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Execution of the regulation dated 13062019 with a deadline of 15072019 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801918203
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741801119725
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration:
Authority:
Purpose of inspection:


# 741801523702
Unscheduled inspection
Start date: 2018-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 741800637680
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of a low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800528619
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of a high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800471652
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the gas pipeline installation works on supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 741800368090
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of gas pipeline supports and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of art. 52 of the Urban Planning Code of the Russian Federation


# 741800410451
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-25, duration:
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: Verification of the information contained in the submitted applications and documents of the licensee's license applicant to the licensing requirements specified in paragraph 4 of the Decree of the Government of the Russian Federation dated December 30, 2011 1225 "On licensing activities for installation, maintenance and repair of fire safety equipment for buildings and structures"


# 741800085026
Unscheduled inspection
Start date: 2018-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 741800004319
Unscheduled inspection
Start date: 2018-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802920722
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the welding work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802815883
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completed construction object2the receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802815828
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completed construction object2the receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802825211
Unscheduled inspection
Start date: 2017-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802707436
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the low-pressure gas pipeline of the GRP installation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802707364
Unscheduled inspection
Start date: 2017-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802707331
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a high-pressure gas pipeline, the installation of a GRPSH and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3the fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802655803
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of compliance with the requirements of the regulation of 18092017 on the elimination of violations during construction 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation


# 74170802655782
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of compliance with the requirements of the regulation of 18092017 on the elimination of violations during construction 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation


# 74170802280640
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the foundation pillars of the low-pressure gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802002918
Unscheduled inspection
Start date: 2017-09-12, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802002456
Unscheduled inspection
Start date: 2017-09-12, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.