# 002005283308
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the implementation of the measures provided for in paragraphs 30122019 09376, previously issued to the person being checked, on the elimination of identified violations of mandatory requirements in connection with the application received from 11122020 1503120PR bx 36147339 from 11122020. The purpose of this inspection is to establish the fact of elimination of previously identified violations of the regulation from 17112020 09376. The subject of this inspection is to verify compliance with the regulation of the state construction agency supervision from 17112020 09376
# 002005243836
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration: —
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005264388
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005283308
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the implementation of the measures provided for in paragraphs 30122019 09376, previously issued to the person being checked, on the elimination of identified violations of mandatory requirements in connection with the application received from 11122020 1503120PR bx 36147339 from 11122020. The purpose of this inspection is to establish the fact of elimination of previously identified violations of the regulation from 17112020 09376. The subject of this inspection is to verify compliance with the regulation of the state construction agency supervision from 17112020 09376
# 002005246163
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-11, duration: 9
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the implementation of the measures provided for in paragraphs previously issued to the person being checked of the instruction dated 27/122019 09605 on the elimination of identified violations of mandatory requirements in connection with the received petition 2821PR dated 09112020 bx 36142021 dated 13112020 on the elimination of violations during the reconstruction of the capital construction facility Joint Stock Company Krasnoyarsk Machine-Building Plant Krasnoyarsk Krasnoyarsk Territory reconstruction and technical re-equipment of the mechanical assembly and The purpose of this inspection is to establish the fact of elimination of previously identified violations of the regulation dated 27/122019 09605the purpose of this inspection is to verify the actual implementation of the regulation of the State construction Supervision authority dated 27/122019 09605
# 002005243836
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-11, duration: 9
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the implementation of the measures provided for in paragraphs previously issued to the person being checked of the instruction from 30062020 091572 on the elimination of identified violations of mandatory requirements in connection with the received petition 2821PR from 09112020 bx 36142021 from 13112020 on the elimination of violations during the reconstruction of the capital construction facility Joint Stock Company Krasnoyarsk Machine-Building Plant Krasnoyarsk Krasnoyarsk Territory reconstruction and technical re-equipment of the mechanical assembly and The purpose of this inspection is to establish the fact of elimination of previously identified violations of the regulation of 30062020 091572the purpose of this inspection is to verify the actual implementation of the regulation of the State construction supervision authority of 30062020 091572
# 002005264388
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: that this inspection is carried out in order to verify the fulfillment of the measures provided for in paragraphs previously issued to the person being verified by the instruction from 21022020 090573 on the elimination of violations of mandatory requirements in connection with the received certificate 29793GD from 26112020 bx 36144488 from 27112020 on the elimination of violations during the reconstruction of the capital construction facility "Joint Stock Company Krasnoyarsk Machine-Building Plant" Krasnoyarsk Krasnoyarsk Territory reconstruction and technical re-equipment mechanical assembly and hull production Stage 4"located at Krasnoyarsk, Gazeta Krasnoyarsk Ave., the purpose of this inspection is to establish the fact of the elimination of earlier violations of the regulation dated 21022020 090573the purpose of this inspection is to verify the actual fulfillment of the regulations of the State construction supervision authority dated 21022020 090573
# 242004316465
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt of the appeal of the Tchaikovsky Foundation dated 14022020
# 242004386157
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004330382
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 001904141199
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration: 5
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of an instruction previously issued to the person being checked dated 15102019 094682 on the elimination of previously identified violations, the deadline for which expires. The purpose of the audit is to establish the fact of elimination of previously identified violations specified in the instruction dated 15102019 094682. The subject of this audit is the fulfillment of the instruction of the state construction supervision authority dated 15102019 094682
# 241904106297
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: To review the documents of a legal entity in accordance with the list provided for by this order
# 241903834257
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-11-01, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Krasnoyarskomu krayu
Purpose of inspection: in order to verify the fulfillment of the prescription dated 29102018 21807 issued by Tatyana Bolshakova, an expert expert at the Department of Supervision of Working Conditions of the Rospotrebnadzor Office for the Krasnoyarsk Territory, with a deadline of 04102019, the objectives of this audit are to carry out state control over supervision of compliance with the requirements of the legislation of the Russian Federation in the field of sanitary and epidemiological welfare of the population, prevention of harmful effects of environmental factors on humans, prevention of infectious and mass non-communicable diseases poisoning of the population The subject of this check is to verify the fulfillment of the prescription dated 29102018 21807 issued by an official of the Department of Rospotrebnadzor in the Krasnoyarsk Territory
# 001902497195
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated 08022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019" the objectives of this inspection are to prevent the detection of and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts compliance with Federal laws and other regulatory legal acts of the Russian Federation and also regulatory and technical documents in the field of industrial safety during the operation of hazardous production facilities
# 241802127575
Unscheduled inspection
Start date: 2018-11-21, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241802040784
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 11102018 3844OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01112018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241802070489
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241802080019
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-11-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 09102018 4040TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15112018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241801761004
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-18, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 27082018 3083TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04102018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241801913008
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-24, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction No. 3603EN dated 10092018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10102018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241801928900
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 27082018 3083SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 15102018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800858857
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241801620326
Unscheduled inspection
Start date: 2018-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800596658
Unscheduled inspection
Start date: 2018-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800593706
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19042018 1040OZHS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 26072018 bx 176 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires on 08/29/2018, respectively.
# 241800229063
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 28082015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits
# 241800244583
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 07122017 5113OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800207000
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-04-05, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 08022018 156DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22032018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241800095533
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-30, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentation
# 241800058214
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800018362
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-14, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of an order previously issued to the person being audited dated 12122017 51801DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 31.012018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 24180803037302
Unscheduled inspection
Start date: 2018-01-10, end date: 2018-01-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this check is carried out in order to verify the fulfillment of the previously issued instruction from 04122017 5038NSS
# 24180803015302
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802900904
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 30062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits
# 24170802876559
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-11, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 18092017 3654DPO previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27112017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802877089
Unscheduled inspection
Start date: 2017-11-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802771457
Unscheduled inspection
Start date: 2017-11-02, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170802841872
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-12-04, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: the instruction issued to the person being checked dated 14092017 3714NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20112017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time period established by the regulation 7 The subject of this audit is to comply with the instructions of the body carrying out regional state construction supervision
# 24170802563377
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28082017 3446OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28092017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State Construction Supervision Inspection time is 10 working days
# 24170801917034
Unscheduled inspection
Start date: 2017-09-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170801912723
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to inspection in accordance with the approved program from 06072017 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701867804
Unscheduled inspection
Start date: 2017-08-18, end date: 2017-08-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: the instruction issued to the person being checked dated 04072017 2734OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17082017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the body carrying out regional state construction supervision
# 24170701867821
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-09-07, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction No. 30062017 2336OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 24082017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701804872
Unscheduled inspection
Start date: 2017-08-25, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701843253
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24032015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility
# 24170701723072
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701660220
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-07-04, duration: —
Authority: Eniseiskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of the information indicated in the GRG's appeal on the fact of carrying out work with soil layer disturbance in the village of Rbazaiha in the Ulbazayskaya 52 area
# 24170701645911
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-30, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24032015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701714983
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-07-06, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction from 19052017 1641OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22062017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision
# 24170701564363
Unscheduled inspection
Start date: 2017-05-12, end date: 2017-05-25, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 03022017 149OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11052017 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701564333
Unscheduled inspection
Start date: 2017-05-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701658740
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-14, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction from 19052017 1704EN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 30052017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision
# 24170701549644
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 08102012 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701541174
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 28082015 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701536629
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 28082015 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701533411
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701524460
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction No. 10022017 202 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27042017the objectives of this audit are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out the regional State construction supervision
# 24170701530038
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-05-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 27022017 213SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 25042017 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701500233
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24032015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701521643
Unscheduled inspection
Start date: 2017-04-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701414494
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-03-23, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction from 10022017 203OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 09032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is to comply with the instructions of the body carrying out the regional State construction supervision
# 24170701350126
Unscheduled inspection
Start date: 2017-02-09, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701347362
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-03, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: These inspections are carried out in order to verify the fulfillment of the instructions previously issued to the person being checked in accordance with the annex to this order on the elimination of identified violations at the capital construction facility, the deadline for which expires in accordance with the annex to this order, the tasks of these inspections are to establish the fact of elimination of previously identified violations, verification of actually performed works in accordance with prescribed measures within the prescribed period, The subject of these inspections is implementation of legal regulations of the body carrying out regional state construction supervision
# 24170701350138
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701347264
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentationcheck compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 24170701346818
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentationcheck compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 24170701342231
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701350499
Unscheduled inspection
Start date: 2017-02-21, end date: —, duration: —
Authority: —
Purpose of inspection: