Found 4 inspections:

# 77190803467162
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This audit is conducted in order to carry out control measures in connection with the verification of the fulfillment of an order based on the expiration of the deadline for the fulfillment by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements dated 24042019 315219 The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of legislation on urban development by the person being audited. The subject of this audit is The purpose is to check the elimination of violations specified in the order issued by Mosgosstroynadzor 315219 dated 24042019


# 77190803397443
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: this audit is conducted in order to carry out control measures in connection with the implementation of the inspection program based on the approved inspection program dated 22102018 2The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited personthe subject of this audit is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as verification of the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor 142619 dated 22022019


# 77190803340182
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This inspection is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation based on the approved inspection program dated 22102018 2The objectives of this inspection are to prevent identify and suppress violations of technical regulations and design documentationthe subject of this inspection is the availability of a construction permit and the conformity of work performed and construction materials used during the construction and reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 77180803250003
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.