# 662100354893
Unscheduled inspection
Start date: 2021-07-26, end date: 2021-08-06, duration: 6
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100261931
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-28, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662004377043
Unscheduled inspection
Start date: 2020-03-27, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004402462
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to monitor compliance with labor legislation and other acts containing labor law norms in relation to employees of Victoria Stroy LLC in accordance with the instructions of Deputy Chairman of the Government of the Russian Federation Golikova TA dated 27122019 TGP12 instructions from the head of the Federal Service for Labor and Employment Rostrud Ivankov MU dated 24012020 3P on unscheduled inspections of compliance with labor legislation and other requirements regulatory legal acts containing norms of labor law Tasks of verification supervision of compliance with labor legislation and other regulatory legal acts containing norms of labor law Subject of verification compliance with mandatory requirements and or requirements established by municipal legal acts carrying out measures to prevent harm to the life and health of citizens
# 662004343014
Unscheduled inspection
Start date: 2020-03-12, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004193817
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-28, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose control of the execution of the previously issued instruction on the elimination of identified violations 291607846P2 dated 26092018 issued by Victoria Stroy LLC Tasks implementation of regional state construction supervision Subject to the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 661904003591
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is carried out in order to control the execution of a previously issued order to eliminate an identified violation of mandatory requirements 291307362P dated October 18, 2019, the objectives of this inspection are to carry out regional state construction supervision 7 The subject of this inspection is the fulfillment of a previously issued order to eliminate an identified violation of mandatory requirements 291307362P dated October 18, 2019
# 661902827383
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-10, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Control of the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291607211P2 dated April 01, 2019 The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291607211P2 dated April 01, 2019
# 661902594771
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is carried out in order to control the execution of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160762P dated February 21, 2019, the objectives of this inspection are the implementation of regional state construction supervision 7 The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160762P dated February 21, 2019
# 661902551418
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902529223
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-11, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: In order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607795P2 dated November 06, 2018, the objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607795P2 dated November 06, 2018
# 661802147449
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Control over the execution of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607734P2 dated October 17, 2018 The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607734P2 dated October 17, 2018
# 661802185838
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this audit is carried out in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607824P dated October 31, 2018, the objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607824P dated October 31, 2018
# 661802050596
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160113718 dated April 27, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work and applicable building materials during the construction of a capital construction facility "Multi-storey single-section residential building with built-in office space on the 1st floor 12 on ROM" located at Sverdlovsk the region of Yekaterinburg in the quarter of Pedagogical Gagarina Vishneva Mira Librarian streets d 481 the results of such work meet the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 articles 52 of the Urban Planning Code of the Russian Federation
# 661801922157
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800821860
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607510 dated July 27, 2018. The objectives of this audit are the implementation of regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 2291607510 dated July 27, 2018.
# 661800647021
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-10, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607231P2 dated May 23, 2018. The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607231P2 dated May 23, 2018
# 661800533693
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607229P2 dated April 28, 2018. The objectives of this audit are the implementation of regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607229P2 dated April 28, 2018.
# 661800584257
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is carried out in order to control the execution of a previously issued instruction on the elimination of an identified violation of mandatory requirements 291307101P dated June 08, 2018, the objectives of this inspection are the implementation of regional state construction supervision 7 The subject of this inspection is the fulfillment of an earlier issued instruction on the elimination of an identified violation of mandatory requirements 291307101P dated June 08, 2018
# 661800417530
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is carried out in order to control the execution of a previously issued order to eliminate an identified violation of mandatory requirements dated March 28, 2018 29130757P the objectives of this audit are to carry out regional state construction supervision 7 The subject of this audit is the fulfillment of a previously issued order to eliminate an identified violation of mandatory requirements dated March 28, 2018 29130757P
# 661800392084
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-01, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to control the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291407163 P1 dated April 17, 2018. The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291407163 P1 dated April 17, 2018
# 661800257428
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160737P2 dated February 19, 2018. The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160737P2 dated February 19, 2018
# 661800191465
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to control the execution of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160794P1 dated February 26, 2018, the objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160794P1 dated February 26, 2018, the inspection period is 10 working days By the audit will begin on March 19, 2018 and the audit will be completed no later than March 30, 2018
# 661800221266
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-04-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is carried out on the basis of an appeal from 07032018 29010152391 the objectives of this inspection are the implementation of regional state construction supervision 7 The subject of this inspection is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Multi-storey residential building 1 on ROM" located at the address Sverdlovsk region, Yekaterinburg, Transitional House 6 the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800071215
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to control the execution of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605980P2 dated December 15, 2017 The objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605980P2 dated December 15, 2017
# 661800007680
Unscheduled inspection
Start date: 2018-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800018830
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160130916 1 dated September 16, 2016. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "11-sectional residential building of variable storeys with built-in premises 31 according to ROM" located at the address Sverdlovsk region Yekaterinburg Chkalovsky RN corridor of high voltage lines extension of Novosibirsk Street the projected section of the Yekaterinburg ring road Residential area Solnechny 3rd quarter Residential block 31 results of such work to the requirements of technical regulations sanitary and epidemiological rules and regulations safety rules and state standards of design documentation including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used as well as the availability of permits for the construction and fulfillment of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170802991825
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is carried out in order to monitor the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291302672 dated October 27, 2017. The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291302672 dated October 27, 2017
# 66170802569196
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: control over the execution of the previously issued order on the elimination of identified violations of mandatory requirements 291605527P2 dated July 28, 2017. The objectives of this audit are the implementation of regional state construction supervision
# 66170701845912
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to control the execution of the previously issued order to eliminate the identified violation of mandatory requirements 291605458P2 dated July 05, 2017. The objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is the fulfillment of the previously issued order to eliminate the identified violation of mandatory requirements 291605458P2 dated July 05, 2017
# 66170701774640
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: control over the execution of the previously issued order on the elimination of identified violations of mandatory requirements 291605304P2 dated June 02, 2017. The objectives of this audit are the implementation of regional state construction supervision
# 66170701725076
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-07-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to control the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291302172 dated April 21, 2017. The objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291302172 dated April 21, 2017
# 66170701605128
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 30120445913 dated February 10, 2017. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of work and applicable building materials during the construction of a capital construction facility "4-sectional multi-storey residential building with built-in non-residential premises on the 1st floor in sections 1A 1B 1B and premises preschool educational institution in section 1G of the roof gas boiler house in section 1B 1 of the GP" located at the address Yekaterinburg Oktyabrsky district Bakhchivandzhi str. 15 the results of such work meet the requirements of technical regulations fire safety requirements safety rules and state standards of design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701613903
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the previously issued order on the elimination of identified violations of mandatory requirements 291605189 dated March 24, 2017
# 66170701500663
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-04-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: control over the execution of the previously issued order on the elimination of identified violations of mandatory requirements 29160522 P2 dated February 14, 2017
# 66170701385160
Unscheduled inspection
Start date: 2017-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160701182360
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: fulfillment of a previously issued instruction on the elimination of identified violations of mandatory requirements
# 66160701082348
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-12-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to control the execution of a previously issued instruction on the elimination of an identified violation of mandatory requirements 291302546 dated September 30, 2016. The subject of this inspection is the fulfillment of an earlier issued instruction on the elimination of an identified violation of mandatory requirements 291302546 dated September 30, 2016. the task of this inspection is the implementation of state construction supervision
# 66160701030355
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Control over the execution of a previously issued instruction on the elimination of identified violations of mandatory requirements
# 66160701014328
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-11-10, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6The subject of this audit is the fulfillment of the previously issued order on the elimination of the identified violation of mandatory requirements 291302478 dated September 02, 2016. The task of this audit is to carry out state construction supervision
# 66160700560121
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-10-03, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the fulfillment of the previously issued order on the elimination of the identified violation of mandatory requirements 291302474 dated September 02, 2016, the task of this audit is to carry out state construction supervision
# 66160700155231
Unscheduled inspection
Start date: 2016-09-07, end date: —, duration: —
Authority: —
Purpose of inspection: