# 742004231019
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741904121195
Unscheduled inspection
Start date: 2019-12-24, end date: 2019-12-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the gas pipeline, internal electrical work, installation of a heating system, smoke extraction and supply ventilation, compliance with fire and sanitary epidemiological measures and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices used energy resource 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903982081
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on fire protection of metal structures installation of walls from panels installation of facade glazing construction of internal walls installation of internal water supply and sewerage networks internal electrical installation of power supply networks construction of external water supply and sewerage networks installation of boiler room and used building materials during construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources.2 Availability of a construction permit.3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation.


# 74170802937040
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of work on the installation of elevators, completion of finishing, landscaping, completion of facades, completion of internal engineering systems, completion of the implementation of sanitary and epidemiological and fire safety standards and building materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802872124
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the interior decoration of boiler rooms for the installation of internal engineering water supply and sanitation systems for supply and exhaust ventilation for the installation of electric power equipment and low-current AK OPS AGSP systems for compliance with fire and sanitary epidemiological measures and building materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802741145
Unscheduled inspection
Start date: 2017-10-25, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.