# 262105299782
Unscheduled inspection
Start date: 2021-01-15, end date: 2021-02-11, duration: —
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 11/24/2020 No. 24/09-2020 stage No. 2
the objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person engaged in construction.
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks;
- compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping the capital construction facility with metering devices for energy resources used;
- compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 262005265244
Unscheduled inspection
Start date: 2020-12-08, end date: 2021-01-13, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The objectives of the verification of the inspection programs from 21102020 26042020 Stage 1 verification tasks the objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentation subject of verification compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, drawing up acts of inspection of works of structures sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts