# 772101440728
Unscheduled inspection
Start date: 2021-12-09, end date: 2021-12-16, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101386868
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-10, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101282517
Unscheduled inspection
Start date: 2021-11-08, end date: 2021-11-16, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101061846
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-29, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100898605
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-10-05, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100479408
Unscheduled inspection
Start date: 2021-08-18, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100409396
Unscheduled inspection
Start date: 2021-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100362073
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100199513
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-31, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100182479
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100235282
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-05-27, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100113260
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-26, duration: 6
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to monitor the implementation of Regulation No. 215-G dated August 24, 2020./3.3-20/ X-111.
The objectives of this audit are:
to monitor the measures taken
by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development activities during the construction and reconstruction of a capital construction facility.;
taking measures to eliminate violations of mandatory requirements
(if they are identified) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts.
The subject of the audit is compliance with the instructions of the state control (supervision) body.
# 772100111784
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-12, duration: 6
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the implementation of regulations No. 212-G dated August 24, 2020./3.3-20/ X-13, dated January 20, 2021, No. 5-G/3.3-20/ X-13.
The objectives of this audit are:
to monitor the measures taken
by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development activities during the construction and reconstruction of a capital construction facility.;
taking measures to eliminate violations of mandatory requirements
(if they are identified) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts.
The subject of the audit is compliance with the instructions of the state control (supervision) body.
# 772100034112
Unscheduled inspection
Start date: 2021-03-03, end date: 2021-03-31, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100036840
Unscheduled inspection
Start date: 2021-02-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004484433
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 372004483936
Unscheduled inspection
Start date: 2020-08-12, end date: 2020-08-13, duration: 2
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works and applied building materials with the requirements of the design documentation and the inspection program Prevention detection and suppression of violations of the legislation on urban development and project documentation committed by the developer or the person carrying out construction Compliance with mandatory requirements of project documentation and technical regulations
# 772004460576
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004446410
Unscheduled inspection
Start date: 2020-06-30, end date: 2020-07-28, duration: 1
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The audit is carried out with the aim of implementing federal state supervision over employers' compliance with labor legislation and regulatory legal acts that implement activities in the field of construction, state regulatory requirements for labor protection and the proper execution of employment contracts with employees or the conclusion of civil law contracts. Instruction from Deputy Chairman of the Government of the Russian Federation Golikova TAOT27122019GTGP1211486 Instruction from Head of the Federal Service for Labor and Employment Ivankov MUOT240120203THE tasks of the audit are supervision and control over compliance with legislation and other regulatory legal acts The subject of this audit is the observance of mandatory requirements and requirements established by municipal legal acts, and the compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements, and the compliance of information contained in the application and documents of a legal entity or sole proprietor on the granting of a legal status, special authorization, and approval with mandatory requirements, as well as data on specified legal entities and individual entrepreneurs. entrepreneurs listed in the unified State Register of Sole Proprietors and other federal information resources compliance with the instructions of state control bodies, supervision bodies of municipal control, carrying out measures to prevent harm to the life and health of citizens, animals, plants, objects of cultural heritage of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents of special historical significance, scientific and cultural significance included in the national library Fund, to prevent the occurrence of emergencies of natural and man-made nature, to ensure the safety of the state, and to eliminate the consequences of causing such damage. harm
# 772004437933
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 372004417680
Unscheduled inspection
Start date: 2020-05-28, end date: 2020-05-29, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works and applied building materials with the requirements of the design documentation and the inspection program Prevention detection and suppression of violations of the legislation on urban development and project documentation committed by the developer or the person carrying out construction Compliance with mandatory requirements and or requirements established by municipal legal acts
# 772004296767
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004351744
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:
# 772004267666
Unscheduled inspection
Start date: 2020-02-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 372004305393
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-02-25, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: assessment of the compliance of the completed works installation of the supply and exhaust ventilation system internal engineering networks and the construction materials used with the requirements of the design documentation in accordance with the program of inspections for compliance with sanitary and fire safety requirements
# 772004148295
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004237246
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 372004224385
Unscheduled inspection
Start date: 2020-01-21, end date: 2020-01-22, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works and applied building materials with the requirements of the design documentation and the inspection program Prevention detection and suppression of violations of the legislation on urban development and project documentation committed by the developer or the person carrying out construction Compliance with mandatory requirements and or requirements established by municipal legal acts
# 771904051805
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904099711
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904117244
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903933127
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903904442
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903858893
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903631542
Unscheduled inspection
Start date: 2019-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803487703
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803487710
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803477216
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-08-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803435969
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803446982
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803397197
Unscheduled inspection
Start date: 2019-05-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803365085
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-03-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation prevention detection and suppression of violations of technical regulations and project documentation committed by the person being checked compliance of work performed and construction materials used during construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation including energy efficiency requirements and equipment requirements of the capital construction facility accounting for the energy resources used verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803327622
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803320887
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor prevention detection and suppression of violations of technical regulations and project documentation committed by the person being checked
# 77180803289872
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803278366
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803259309
Unscheduled inspection
Start date: 2018-10-23, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803244917
Unscheduled inspection
Start date: 2018-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803227168
Unscheduled inspection
Start date: 2018-09-13, end date: 2018-09-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803202465
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-09-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803191065
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803180994
Unscheduled inspection
Start date: 2018-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803191060
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803175692
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803161055
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803155031
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-06-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803147653
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803139606
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803147676
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803147312
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-05-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803097562
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803088538
Unscheduled inspection
Start date: 2018-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701884105
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701637136
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701393276
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701261023
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used