# 002005270314
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-16, duration: 3
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 1 The purpose of the audit is to control the execution of JSC 1015 USMR of the previously issued prescription from 06022020 530188vnP00552020 hereinafter the Prescription the deadline for which expires 2 The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of JSC 1015 USMR of the above-mentioned Prescription The subject of this audit is the fulfillment of the Prescription by a legal entity
# 001902811587
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 002005270314
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-16, duration: 3
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 1 The purpose of the audit is to control the execution of JSC 1015 USMR of the previously issued prescription from 06022020 530188vnP00552020 hereinafter the Prescription the deadline for which expires 2 The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of JSC 1015 USMR of the above-mentioned Prescription The subject of this audit is the fulfillment of the Prescription by a legal entity
# 772004452222
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004294006
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-02-17, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued order dated 06112019 542520prplP 0489 2019 on the elimination of violations during the reconstruction of a capital construction facility "Construction of a complex of buildings of the Department of Internal Affairs of Solnechnogorsk, Moscow region" located at the address Moscow region Solnechnogorsk district, Solnechnogorsk Northwestern microdistrict Krasnaya Street, the deadline for which has expired
# 002004247842
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-06, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to comply with the order of the head of the Federal Service for Environmental Technological and Nuclear Supervision AV Alyoshin dated 15012020 15 "On conducting inspections of compliance with mandatory requirements by subjects of the electric power industry, heat supply organizations, heating grid organizations and consumers of electric energy in 2020" on the basis of an instruction from the Government of the Russian Federation dated 30122019 DKP911542 The task of checking the implementation of federal energy supervision is to verify compliance by a legal entity in the process of carrying out mandatory requirements on the safe conduct of work at electric power facilities requirements for ensuring safety in the field of electric power
# 771904126843
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision
# 771903931959
Unscheduled inspection
Start date: 2019-11-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903621067
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for the energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803472821
Unscheduled inspection
Start date: 2019-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803461115
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803456331
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803440899
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001902811587
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 77190803413756
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803397569
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: this inspection is carried out in order to carry out control measures in connection with the implementation of the inspection program on the basis of the approved inspection program dated 04092015. The objectives of this inspection are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The subject of this inspection is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803391793
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803376051
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803340184
Unscheduled inspection
Start date: 2019-02-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803316680
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-02-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803306490
Unscheduled inspection
Start date: 2018-12-26, end date: 2018-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803298800
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803274049
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803221229
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803208644
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803184407
Unscheduled inspection
Start date: 2018-07-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803132812
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803127263
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-05-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803119781
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001800243584
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-17, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 25.012018 61G3327X62
# 77180803094156
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803085086
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170803061960
Unscheduled inspection
Start date: 2017-12-31, end date: 2018-01-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802906644
Unscheduled inspection
Start date: 2017-11-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802861325
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802760348
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801944860
Unscheduled inspection
Start date: 2017-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801918025
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-09-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701740201
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701747767
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-07-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701529352
Unscheduled inspection
Start date: 2017-04-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701554010
Unscheduled inspection
Start date: 2017-04-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701481412
Unscheduled inspection
Start date: 2017-03-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701371888
Unscheduled inspection
Start date: 2017-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701379216
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701419348
Unscheduled inspection
Start date: 2017-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701302511
Unscheduled inspection
Start date: 2017-01-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701317733
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701267174
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701132105
Unscheduled inspection
Start date: 2016-11-18, end date: 2016-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701056730
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700986282
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-11-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentation on the basis of the approved verification program, the tasks of this audit are to prevent, identify and suppress violations of technical regulations and design documentation6 committed by the person being audited, the subject of this audit is to verify the elimination of violations specified in the instruction issued by Mosgosstroynadzor 842816 of 09082016 compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701016620
Unscheduled inspection
Start date: 2016-10-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700151817
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program The tasks of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the audited person. The subject of this audit is to verify the elimination of violations specified in the instruction issued by Mosgosstroynadzor 785216 of 03082016 compliance of the work and construction materials used during the construction reconstruction of the capital construction facility and also, the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 77160700866674
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program prevention identification and suppression of violations of technical regulations and project documentation committed by the audited person verification of elimination of violations specified in the instruction issued by Mosgosstroynadzor 795616 of 28072016 compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160700864775
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160601776843
Unscheduled inspection
Start date: 2016-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601756977
Unscheduled inspection
Start date: 2016-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601731505
Unscheduled inspection
Start date: 2016-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601740691
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-07-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program, prevention of detection and suppression of violations of technical regulations and project documentation committed by the audited person, compliance of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for used energy resources