# 001800513396
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the audit program 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is to verify compliance with mandatory requirements in the field of urban development compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 00170802927924
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 17052017 Sv2024rP62 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisanii ot 17052017 Sv2024rP7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora ot 17052017 Sv2024rP
# 00170802927904
Unscheduled inspection
Start date: 2017-11-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00150601370783
Unscheduled inspection
Start date: 2015-11-18, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00150601370543
Unscheduled inspection
Start date: 2015-10-20, end date: 2015-10-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation
# 00150601367482
Unscheduled inspection
Start date: 2015-07-13, end date: 2015-07-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation
# 662101297776
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101277882
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101277973
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101340872
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101080662
Unscheduled inspection
Start date: 2021-10-04, end date: 2021-10-29, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel - realizacii programmy provedeniya proverok № 29-15-17/313-20 ot 2021-07-12 Izmenenie № 1; Zadachi - osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora; Predmet - proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva: Podzemnyi kollektor hozyaistvenno-bytovoi kanalizacii 2000h1500 mm ot t. 1 do t. 15, raspolozhennogo po adresu: g. Ekaterinburg, rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichiya razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662100591524
Unscheduled inspection
Start date: 2021-09-07, end date: 2021-09-20, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100352721
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100332006
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662100398178
Unscheduled inspection
Start date: 2021-07-30, end date: 2021-08-26, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel - realizacii programmy provedeniya proverok № 29-15-17/313-20 ot 12.07.2021 (Izmenenie № 1); Zadachi - osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora; Predmet - proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva: Podzemnyi kollektor hozyaistvenno-bytovoi kanalizacii 2000h1500 mm ot t. 1 do t. 15, raspolozhennogo po adresu: g. Ekaterinburg, rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichiya razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662100264990
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-18, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100207018
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-06-10, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva,vh. № 18009 ot 29.04.2021 v sootvetstvii s podpunktom «a» punkta 2 chasti 5 stati 54 Gradostroitelnogo kodeksa Rossiiskoi Federacii, s celyu proverki ispolneniya trebovanii predpisaniya ot 17.02.2021 № 29-14-29/2, predpisaniya ot 09.04.2021 № 29-17-29/168, vydannyh OOO Stroitelno-montazhnoe predpriyatie «GorRemStroi», zadachei nastoyaschei proverki yavlyaetsya: osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora.
# 662100211999
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100146746
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel - realizacii programmy provedeniya proverok № 29-15-17/313-20 ot 2020-10-21; Zadachi - osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora; Predmet - proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva: Podzemnyi kollektor hozyaistvenno-bytovoi kanalizacii 2000h1500 mm ot t. 1 do t. 15, raspolozhennogo po adresu: g. Ekaterinburg, v granicah ulic Krestinskogo – Akademika SHvarca – Belinskogo, rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichiya razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662100137407
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 30
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel - realizacii programmy provedeniya proverok № 29-16-15/67-20 ot 2020-03-27; Zadachi - osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora; Predmet - proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva: Trehsekcionnyi zhiloi dom peremennoi etazhnosti so vstroennymi i pristroennymi pomescheniyami administrativnogo naznacheniya (№ 1 po PZU), vspomogatelnymi pomescheniyami s musorokameroi i dvornickoi (№ 2 po PZU) i vstroenno-pristroennym podzemnym parkingom (№ 3 po PZU), raspolozhennogo po adresu: g. Ekaterinburg, ul. Blyuhera, rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichiya razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662100088203
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100037712
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-30, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu realizacii programmy proverok № 29-16-01/65-19 ot 10.03.2020, zadachei nastoyaschei proverki yavlyaetsya: osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora. Predmetom nastoyaschei proverki yavlyaetsya: proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva «3 sekcii mnogosekcionnogo zhilogo doma peremennoi etazhnosti so vstroeno-pristroennymi pomescheniyami magazinov i DDU na 40 mest (№№ 1, 2, 7 po PZU), zdanie nadzemnoi avtostoyanki № 2 (№ 9 po PZU), transformatornaya podstanciya № 2 (№ 11 po PZU) - 2 etap stroitelstva», raspolozhennogo po adresu: Sverdlovskaya oblast,
g. Ekaterinburg, SNT "Politehnikum", a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii
s chastyami 3.8 i 3.9 stati 49 Gradostroitelnogo kodeksa Rossiiskoi Federacii) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa Rossiiskoi Federacii), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti
ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichie razresheniya na stroitelstvo; vypolnenie trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662100075546
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100018496
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-03-22, duration: 32
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel - realizacii programmy provedeniya proverok № 29-16-22/25-21 ot 2021-02-11; Zadachi - osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora; Predmet - proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva: ZHilaya sekciya so vstroennymi nezhilymi pomescheniyami obschestvennogo i administrativnogo naznacheniya (№ 1.1 po PZU); dve mnogoetazhnye sekcii zhilogo doma (№№ 1.2, 1.3 po PZU); podzemnaya avtostoyanka, pristroennaya k zhilym domam (№ 2 po PZU) – 1 etap stroitelstva; Dve mnogoetazhnye sekcii zhilogo doma (№№ 1.4, 1.5 po PZU) – 2 etap stroitelstva, raspolozhennogo po adresu: g. Ekaterinburg, rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichiya razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662105314689
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel - realizacii programmy provedeniya proverok № 29-17-15/123-20 ot 2020-10-15; Zadachi - osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora; Predmet - proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva: 2 etap stroitelstva - zdanie sportivnogo kluba (№ 2 po PZU) s nadzemnym peshehodnym perehodom (№ 2.1 po PZU), raspolozhennogo po adresu: g. Ekaterinburg, rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichiya razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662005225544
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662005218775
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-11-30, duration: 13
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy proverok 29170146819 ot 30122019 zadachei nastoyaschei proverki yavlyaetsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva «Zdanie mnogofunkcionalnogo TRC s avtovokzalom so vstroennymi avtostoyankami TRC i avtovokzala 1 po PZU zdanie CTP 2 po PZU 11 etap stroitelstva» raspolozhennogo po adresu g Ekaterinburg ul SHvarca Belinskogo a takzhe rezultatov takih rabot ukazannym v punkte 1 chasti 5 stati 49 Gradostroitelnogo kodeksa Rossiiskoi Federacii trebovaniyam proektnoi dokumentacii vklyuchaya proektnuyu dokumentaciyu v kotoroi uchteny izmeneniya vnesennye v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa Rossiiskoi Federacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 662004497007
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004471442
Unscheduled inspection
Start date: 2020-08-11, end date: 2020-08-25, duration: 11
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel realizacii programmy provedeniya proverok 29170146819 ot 20191230 Zadachi osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva Zdanie mnogofunkcionalnogo TRC s avtovokzalom so vstroennymi avtostoyankami TRC i avtovokzala 1 po PZU zdanie CTP 2 po PZU 11 etap stroitelstva raspolozhennogo po adresu g Ekaterinburg ul SHvarca Belinskogo rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 662004442432
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-29, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel realizacii programmy provedeniya proverok 2916011719 kor1 ot 20191001 Zadachi osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva Trehsekcionnyi zhiloi dom 2 peremennoi etazhnosti so vstroennopristroennymi nezhilymi pomescheniyami 2 2A 2B 2V po PZU podzemnaya avtostoyanka 21 po PZU so vstroennoi transformatornoi podstanciei 11 po PZU i vstroennym v nazemnyi obem rampy avtostoyanki pomescheniem musorokamery 13 po PZU 2 etap stroitelstva zhilogo kompleksa raspolozhennogo po adresu Sverdlovskaya oblast g Ekaterinburg v raione ulicy SHerbakova rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 662004430167
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004424594
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-07-06, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel realizacii programmy provedeniya proverok 2916016519 ot 20200310 Zadachi osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva 3 sekcii mnogosekcionnogo zhilogo doma peremennoi etazhnosti so vstroenopristroennymi pomescheniyami magazinov i DDU na 40 mest 1 2 7 po PZU zdanie nadzemnoi avtostoyanki 2 9 po PZU transformatornaya podstanciya 2 11 po PZU 2 etap stroitelstva raspolozhennogo po adresu Sverdlovskaya oblast g Ekaterinburg SNT Politehnikum rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 662004407427
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-05, duration: 9
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel realizacii programmy provedeniya proverok 29170146819 ot 20191230 Zadachi osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva Zdanie mnogofunkcionalnogo TRC s avtovokzalom so vstroennymi avtostoyankami TRC i avtovokzala 1 po PZU zdanie CTP 2 po PZU 11 etap stroitelstva raspolozhennogo po adresu g Ekaterinburg ul SHvarca Belinskogo rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 662004417240
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-19, duration: 17
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel realizacii programmy provedeniya proverok 2916156720 ot 20200327 Zadachi osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva Trehsekcionnyi zhiloi dom peremennoi etazhnosti so vstroennymi i pristroennymi pomescheniyami administrativnogo naznacheniya 1 po PZU vspomogatelnymi pomescheniyami s musorokameroi i dvornickoi 2 po PZU i vstroennopristroennym podzemnym parkingom 3 po PZU raspolozhennogo po adresu g Ekaterinburg ul Blyuhera rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa Rossiiskoi Federacii proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 662004341422
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004322871
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004232288
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations of the task implementation of regional state construction supervision Subject to the implementation of a previously issued instruction on the elimination of identified violations of mandatory requirements
# 661903983415
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel kontrol ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607770P ot 13 sentyabrya 2019 goda Zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmet vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607770P ot 13 sentyabrya 2019 goda
# 661903954992
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902943135
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-09-13, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel realizaciya programmy provedeniya proverok 2916016519 ot 06032019 Zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmet sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva «3 sekcii mnogosekcionnogo zhilogo doma peremennoi etazhnosti so vstroenopristroennymi pomescheniyami magazinov i DDU na 40 mest 1 2 7 po PZU zdanie nadzemnoi avtostoyanki 2 9 po PZU transformatornaya podstanciya 2 11 po PZU 2 etap stroitelstva» raspolozhennogo po adresu g Ekaterinburg SNT Politehnikum rezultatov takih rabot proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 661902912732
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-23, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291307122 P ot 14 iyunya 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291307122 P ot 14 iyunya 2019 goda
# 661902745755
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902743962
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902621470
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 06 marta 2019 goda 2916016519 zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva «3 sekcii mnogosekcionnogo zhilogo doma peremennoi etazhnosti so vstroenopristroennymi pomescheniyami magazinov i DDU na 40 mest 1 2 7 po PZU zdanie nadzemnoi avtostoyanki 2 9 po PZU transformatornaya podstanciya 2 11 po PZU 2 etap stroitelstva» raspolozhennogo po adresu Sverdlovskaya oblast g Ekaterinburg SNT Politehnikum rezultatov takih rabot proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001802183441
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the audit program 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is to verify compliance with mandatory requirements in the field of urban development compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 661800576982
Unscheduled inspection
Start date: 2018-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001800513396
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the audit program 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is to verify compliance with mandatory requirements in the field of urban development compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 001800341784
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the audit program 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is to verify compliance with mandatory requirements in the field of urban development compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 001800341800
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 19122017 Sv6406rP i ot 19122017 Sv6405rP 62 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisanii ot 19122017 Sv6406rP i ot 19122017 Sv6405rP 7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora ot 19122017 Sv6406rP i ot 19122017 Sv6405rP
# 00170802927924
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 17052017 Sv2024rP62 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisanii ot 17052017 Sv2024rP7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora ot 17052017 Sv2024rP
# 00170802927904
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the verification program62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is to verify compliance with mandatory requirements in the field of urban development compliance with the performance of works and the construction materials used in during the construction reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 66170802757958
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-10, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705s7597 p ot 05 sentyabrya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705s7597 p ot 05 sentyabrya 2017 goda
# 66170802801883
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291402537 ot 06 oktyabrya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291402537 ot 06 oktyabrya 2017 goda
# 66170802097763
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802572824
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66170701900125
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-09-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705435 p1 ot 30 iyunya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705435 p1 ot 30 iyunya 2017 goda
# 66170701596788
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: S celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302132 ot 07 aprelya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 66170701435166
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 29140221 ot 31 yanvarya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 29140221 ot 31 yanvarya 2017 goda
# 66170701469241
Unscheduled inspection
Start date: 2017-03-22, end date: 2017-04-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva «Zdanie torgovogo centra so vstroennoi otkrytoi avtoparkovkoi 1 2 po PZU sooruzhenie dizelgeneratornoi ustanovki 3 po PZU ochistnye sooruzheniya 4 po PZU» raspolozhennogo po adresu g Ekaterinburg prkt Kosmonavtov per Melkovskii dom 1 rezultatov takih rabot trebovaniyam tehnicheskih reglamentov sanitarnoepidemiologicheskim pravilam i normativam pravilam bezopasnosti i gosudarstvennym standartam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii s celyu realizacii programmy provedeniya proverok ot 18 yanvarya 2017 goda 29170134516 zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 66170701414200
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705s73 p ot 13 yanvarya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705s73 p ot 13 yanvarya 2017 goda
# 66170701299368
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160701236770
Unscheduled inspection
Start date: 2016-12-14, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66160701120773
Unscheduled inspection
Start date: 2016-11-16, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66160701098750
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160700983668
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok 301204128143 ot 01082016 zadachei kotoroi yavlyaetsya osuschestvlenie gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri rekonstrukcii obekta kapitalnogo stroitelstva «Suschestvuyuschee zdanie torgovorazvlekatelnogo centra «Grinvich1» so stroitelstvom pristraivaemogo zdaniya torgovovystavochnogo razvlekatelnogo centra «Grinvich5» s podzemnoi avtostoyankoi na 2m i 3m podzemnyh etazhah i vstroennoi transformatornoi podstanciei 5 po GP 2 puskovoi kompleks» raspolozhennogo po adresu g Ekaterinburg Leninskii raion kvartal ulic 8 Marta Radischeva Vainera ul 8 Marta 46 ul Kuibysheva 55a rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroite6lstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 66160701030333
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-11-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva «Zdanie torgovogo centra so vstroennoi otkrytoi avtoparkovkoi 1 2 po PZU sooruzhenie dizelgeneratornoi ustanovki 3 po PZU ochistnye sooruzheniya 4 po PZU» raspolozhennogo po adresu g Ekaterinburg prospekt Kosmonavtov per Melkovskii dom 1 rezultatov takih rabot stroitelnym normam i pravilam sanitarnoepidemiologicheskim pravilam i normativam pravilam bezopasnosti i gosudarstvennym standartam a takzhe trebovaniyam drugih normativnyh pravovyh aktov Rossiiskoi Federacii i normativnyh pravovyh aktov federalnyh organov ispolnitelnoi vlasti podlezhaschih obyazatelnomu ispolneniyu pri stroitelstve obektov kapitalnogo stroitelstva
# 66160601773851
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291402168 ot 15 aprelya 2016 goda Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291402168 ot 15 aprelya 2016 goda zadachei nastoyaschei proverki yavlyaetsya osuschestvlenie gosudarstvennogo stroitelnogo nadzora
# 66160700854254
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-10-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva vh 29018238316 ot 14092016 v sootvetstvii s polozheniyami podpunkta «a» punkta 2 chasti 5 stati 54 Gradostroitelnogo kodeksa Rossiiskoi Federacii Predmet proverki sootvetstvie vypolnyaemyh rabot primenyaemyh stroitelnyh materialov i rezultatov takih rabot stroitelnym normam i pravilam sanitarnoepidemiologicheskim pravilam i normativam trebovaniyam pozharnoi bezopasnosti inym pravilam bezopasnosti i gosudarstvennym standartam a takzhe trebovaniyam drugih normativnyh pravovyh aktov Rossiiskoi Federacii i normativnyh pravovyh aktov federalnyh organov ispolnitelnoi vlasti podlezhaschih obyazatelnomu ispolneniyu pri stroitelstve obektov kapitalnogo stroitelstva «Zdanie dlya razmescheniya mnogofunkcionalnogo torgovogo kompleksa dlya optovoroznichnoi torgovli 1 po PZU RP sovmeschennaya s TP 2 po PZU dizelgenerator 3 po PZU pristroennyi ITP 4 po PZU ochistnye sooruzheniya 8 po PZU pozharnye rezervuary 9 po PZU» raspolozhennogo po adresu g Ekaterinburg Kirovskii raion 67 kvartal Sanatornogo lesnogo parka
# 66160601717576
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160601779373
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291704R6294 ot 26 maya 2016 goda Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291704R6294 ot 26 maya 2016 goda zadachei nastoyaschei proverki yavlyaetsya osuschestvlenie gosudarstvennogo stroitelnogo nadzora
# 66160601773812
Unscheduled inspection
Start date: 2016-08-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160601779464
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: realizaciya programmy provedeniya proverok 301204128143 ot 29072016 zadachami kotoroi yavlyaetsya osuschestvlenie gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri stroitelstve obekta kapitalnogo stroitelstva «Suschestvuyuschee zdanie torgovorazvlekatelnogo centra Grinvich1 so stroitelstvom pristraivaemogo zdaniya torgovovystavochnogo razvlekatelnogo centra Grinvich5 s podzemnoi avtostoyankoi na 2m i 3m podzemnyh etazhah i vstroennoi transformatornoi podstanciei 5 po GP 2 puskovoi kompleks» raspolozhennogo po adresu g Ekaterinburg Leninskii raion kvartal ulic 8 Marta Radischeva Vainera ul 8 Marta 46 ul Kuibysheva 55a rezultatov takih rabot stroitelnym normam i pravilam pravilam bezopasnosti i gosudarstvennym standartam a takzhe trebovaniyam drugih normativnyh pravovyh aktov Rossiiskoi Federacii i normativnyh pravovyh aktov federalnyh organov ispolnitelnoi vlasti podlezhaschih obyazatelnomu ispolneniyu pri stroitelstve obektov kapitalnogo stroitelstva
# 00150601370783
Unscheduled inspection
Start date: 2015-11-18, end date: 2015-11-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation
# 00150601370692
Unscheduled inspection
Start date: 2015-11-02, end date: 2015-11-10, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation
# 00150601370543
Unscheduled inspection
Start date: 2015-10-20, end date: 2015-10-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation
# 00150601370020
Unscheduled inspection
Start date: 2015-09-25, end date: 2015-10-05, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation
# 00150601367482
Unscheduled inspection
Start date: 2015-07-13, end date: 2015-07-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation