# 002004376684
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004209086
Unscheduled inspection
Start date: 2020-01-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001904131562
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-11-29, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the instruction from 05072019 4320710919 points 1 2 3 4 5 6 7 8 9 10 11 12 13 14 previously issued by Nizhnekamsk Garment Factory JSC based on the results of an inspection of compliance with industrial safety requirements at the hazardous production facility "Mechanization Site" reg a43033480003 The tasks of this inspection are to verify the elimination of JSC "Nizhnekamsk Garment Factory" violations of mandatory industrial safety requirements identified by the Volga Department of Rostechnadzor The subject of this audit is the fulfillment of the order of the Volga Department of Rostechnadzor dated 05072019 4320710919
# 001904116234
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-16, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the execution of the order dated 17052019 43203307419 previously issued to individual entrepreneur Naumov VA based on the results of verification of compliance with industrial safety requirements at hazardous production facilities in accordance with Table 1
# 001902616048
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-24, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Rostechnadzor Order dated 01022019 44 On Conducting Inspections of Compliance with Mandatory Requirements by Electric Power Industry Entities Heat Supply Organizations Heating Grid Organizations and Consumers of Electric Energy in 2019 issued in accordance with the instruction of the Government of the Russian Federation dated 18012019 DKP9254 Prevention detection and suppression of violations of mandatory safety Requirements established by federal laws and other Regulatory acts of the Russian Federation in the field of electric power and heat supply Compliance with mandatory requirements requirements and or requirements established by municipal legal acts
# 162101380293
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction of a capital construction facility of building materials, the results of such works with the requirements of design documentation; prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of an agreement with the developer or the customer; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162004483746
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004440015
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-06-30, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of execution of the order dated 19112019 1412028001, the deadline for which expired 19062020 and drawing up an act based on the results of the inspection, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations of other works performed during the construction of the capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 162004440007
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-06-30, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine whether the completed works used in the construction of an object of capital construction of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 03032020 case 141120140017 The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 162004395120
Unscheduled inspection
Start date: 2020-04-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 002004376684
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-03, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the facts set out in the provided information from the Ministry of Emergency Situations of the Russian Federation Department of Supervision and Preventive Work in the Nizhnekamsk municipal district of the Republic of Tatarstan vh 10032020 29010724 on the location of gas equipment of the shopping center "Bars2" at the address Republic of Tatarstan Nizhnekamsk Mendeleev str. d 33a
# 162004302560
Unscheduled inspection
Start date: 2020-02-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004209086
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-01-15, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of the order dated 09102019 43203613722719 paragraphs 2 previously issued by Nizhnekamsk Garment Factory JSC based on the results of checking compliance with industrial safety requirements at hazardous production facilities Verification of the elimination of Nizhnekamsk Garment Factory JSC violations of mandatory industrial safety requirements identified by the Volga Department of Rostechnadzor Fulfillment of the order of the Volga Department of Rostechnadzor dated 09102019 43203613722719 paragraphs 2
# 162004187502
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161904126203
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 15102019 case 141120140017 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 001904131562
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-11-29, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the instruction from 05072019 4320710919 points 1 2 3 4 5 6 7 8 9 10 11 12 13 14 previously issued by Nizhnekamsk Garment Factory JSC based on the results of an inspection of compliance with industrial safety requirements at the hazardous production facility "Mechanization Site" reg a43033480003 The tasks of this inspection are to verify the elimination of JSC "Nizhnekamsk Garment Factory" violations of mandatory industrial safety requirements identified by the Volga Department of Rostechnadzor The subject of this audit is the fulfillment of the order of the Volga Department of Rostechnadzor dated 05072019 4320710919
# 161903935056
Unscheduled inspection
Start date: 2019-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903934916
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Compliance with the instructions of the state control bodies supervision of municipal control bodies
# 001903811853
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-09, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of JSC Nizhnekamsk Garment Factory of violations of mandatory industrial safety requirements identified by the Volga Department of Rostechnadzor Compliance with the order of the Volga Department of Rostechnadzor dated 25042019 432030160719 points 1 17
# 001904116234
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-16, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the execution of the order dated 17052019 43203307419 previously issued to individual entrepreneur Naumov VA based on the results of verification of compliance with industrial safety requirements at hazardous production facilities in accordance with Table 1
# 161903840347
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161903575668
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-09-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161903057641
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161902942507
Unscheduled inspection
Start date: 2019-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902942036
Unscheduled inspection
Start date: 2019-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902944001
Unscheduled inspection
Start date: 2019-08-13, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902942171
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation
# 001904113359
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-09, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of measures to monitor the implementation of the order dated 24042019 4320263005919 previously issued to the Limited Liability Company "Teploservice" based on the results of verification of compliance with energy security requirements, the objectives of this audit are to verify the elimination by the Limited Liability Company "Teploservice" of the identified violations specified in the paragraphs of the order dated 24042019 4320263005919
# 161902888270
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902878200
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-05, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to comply with the order of Rostechnadzor dated March 15, 2017 85 "On inspections of organizations operating tower cranes" on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019"the objectives of this audit are to prevent the identification and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts, the subject of this audit is compliance by a legal entity in the course of carrying out activities with mandatory requirements industrial safety in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting tower cranes used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials used as well as requirements for machinery and equipment and related requirements for these products operation and disposal processes
# 161902816977
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902715685
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902857867
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-18, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Rostechnadzor Order dated 01022019 44 On Conducting Inspections of Compliance with Mandatory Requirements by Electric Power Industry Entities Heat Supply Organizations Heating Grid Organizations and Consumers of Electric Energy in 2019 issued in accordance with the instruction of the Government of the Russian Federation dated 18012019 DKP9254 Prevention detection and suppression of violations of mandatory safety Requirements established by federal laws and other Regulatory acts of the Russian Federation in the field of electric power and heat supply Compliance with mandatory requirements requirements and or requirements established by municipal legal acts
# 001902616048
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-24, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Rostechnadzor Order dated 01022019 44 On Conducting Inspections of Compliance with Mandatory Requirements by Electric Power Industry Entities Heat Supply Organizations Heating Grid Organizations and Consumers of Electric Energy in 2019 issued in accordance with the instruction of the Government of the Russian Federation dated 18012019 DKP9254 Prevention detection and suppression of violations of mandatory safety Requirements established by federal laws and other Regulatory acts of the Russian Federation in the field of electric power and heat supply Compliance with mandatory requirements requirements and or requirements established by municipal legal acts
# 161902592077
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 161902461948
Unscheduled inspection
Start date: 2019-01-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161802069143
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: this audit is carried out in order to protect the rights and interests of employees in accordance with Article 360 of the Labor Code of the Russian Federation motivated submission of GIT in RT dated 23102018 16380018 PV
# 161802179248
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-11-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 161802071481
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 161801791150
Unscheduled inspection
Start date: 2018-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800669657
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-08-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 161800439015
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 28112017 case 141120140017, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts
# 161800254295
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 161800087527
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-02-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 161800005343
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-01-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 16170802936862
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of a notice received by the Inspection dated 27112017 9695 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time period established by the regulation from 03032017 1419004601 to 30112017 Compliance with the instructions of the state control bodies supervision of municipal control bodies
# 16170802936911
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 16170701628527
Unscheduled inspection
Start date: 2017-05-24, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701401516
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701312678
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Legal grounds for conducting an inspection part 5 paragraph 3a of Article 54 of the Urban Planning Code of the Russian Federation Law On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of Control Supervision and Municipal Control dated 26122008 294FZ This inspection is carried out in order to determine whether the work performed, the construction materials used during the construction of a capital construction facility, as well as the results of such work, meet the requirements of technical regulations of project documentation including the requirements of energy efficiency, the objectives of the audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation The subject of the audit is compliance with mandatory requirements during the construction of the capital construction facility according to the inspection program dated 05112014 of the Order of the First Deputy Head of the Ministry of Internal Affairs of the Republic of Tatarstan dated 17012017 14170017
# 16160701115086
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the purpose of determining the fact of execution of the order dated 09082016 1419030201, the deadline for which expired 10112016 and drawing up an act based on the results of the audit
# 16160701114105
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 16160701082358
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160700773738
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as for the purpose of drawing up an act on the elimination of violations, the tasks of the check are to prevent, identify and suppress violations of compliance committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer performed during the construction of a capital construction facility compliance with the requirements of technical regulations, other regulatory legal acts and project documentation when eliminating previously identified violations, the subject of verification is compliance with mandatory requirements
# 16160700836552
Unscheduled inspection
Start date: 2016-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160700795964
Unscheduled inspection
Start date: 2016-09-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16160601713383
Unscheduled inspection
Start date: 2016-08-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160601771308
Unscheduled inspection
Start date: 2016-08-08, end date: 2016-08-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the performed works applied in the process of construction of a capital construction facility with building materials prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts