Found 19 inspections:

# 262101416831
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This check is carried out for the purpose of: notification dated 11/19/2021 bx. No. 17982/01-04 LLC Specialized Developer GlavStroy on the completion dates of works that are subject to verification in accordance with the inspection program dated 09/23/2021 No. 21/18 2021 (2nd stage); The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction.; The subject of this review is: - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with the compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 262101205197
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 262100343175
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notices of completion of the first stage of work (Installation of foundations, installation of floors, etc. underground) inspection program No. 12/02-2021 dated January 14, 2021; the objectives of this inspection are to prevent, identify and suppress violations of the law on urban development, including technical regulations and project documentation, committed by the developer, technical customer, and the person carrying out construction; - compliance with the procedure for conducting construction control, general and (or) special logs of works, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with the compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262005176155
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-30, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Stavropolskom krae
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 262004367948
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of LLC Specialized Developer GlavStroy dated 12032020 g 29960105 on the completion of the II III IV stages of work Bricklaying of exterior and interior walls of partitions of the 1st 3rd 5th floors installation of floor slabs the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of work on structures, sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 261904048488
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of LLC Specialized Developer GlavStroy dated 27112019, 205550114 on the completion of the first stage of work Foundation installation installation of floors and underground the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, and the person carrying out construction, including technical regulations and project documentationthe subject of this audit is to comply with the procedure for conducting construction control, conducting general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261904048561
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of LLC Specialized Developer GlavStroy dated 27112019, 205540114 on the completion of the first stage of work Installation of foundations installation of floors and underground the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, and the person carrying out construction, including technical regulations and project documentation, compliance with the construction control procedure, general and or special logs of work on executive documentation, preparation of certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261904048523
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of LLC Specialized Developer GlavStroy dated 27112019 205530114 on the completion of the first stage of work Installation of foundations installation of floors of technical floors the tasks of this inspection are the prevention detection and suppression of violations of the legislation on urban development by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation, compliance with the procedure for conducting construction control, maintenance of general and or special journals works of executive documentation preparation of acts of inspection of structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902604873
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-25, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: for the purpose of notifying LLC Specialized Developer GlavStroy dated 22032019 45620114 about the start of construction of a capital construction facility, the objectives of this audit are to prevent, identify and suppress violations of urban planning legislation by the developer, technical customer, and the person carrying out construction, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 261802342673
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of Specialized Developer GlavStroy LLC dated 17122018 199100114 on the start of construction of a capital construction facility. The objectives of this audit are to prevent, identify and prevent violations of urban planning legislation by the developer, the technical customer, and the person carrying out the construction, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 261802056862
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-12-05, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of Specialized Developer GlavStroy LLC dated 31102018 171800114 on the start of construction of a capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts.


# 261800514211
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-26, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out with the purpose of notification dated 26062018 36 on completion of construction. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. The subject of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 261800402403
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-22, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is conducted for the purpose of notification of the start of construction dated 14052018 by GlavStroy LLC. The objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer, the technical customer, and the person carrying out the construction, including technical regulations and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170802905336
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-22, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out in order to notify GlavStroy LLC of the start of construction dated 14112017the objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer, the technical customer, and the person carrying out the construction, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170701752845
Unscheduled inspection
Start date: 2017-06-29, end date: 2017-07-26, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is conducted for the purpose of notifying the completion of construction final inspection dated 20062017 inspection program 12062016 dated 19042016the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170701738664
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-07-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out with the aim of notifying 110 of 09062017 GlavStroy LLC about the completion of construction final inspection The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, hereinafter referred to as the contractor. The purpose of this inspection is to comply with mandatory requirements and or requirements established by municipal legal acts


# 26170701581092
Unscheduled inspection
Start date: 2017-05-05, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 26170701413699
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-28, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out in order to notify GlavStroy LLC of the start of construction dated 10022017. The objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements and or the requirements established by municipal legal acts


# 26160701261081
Unscheduled inspection
Start date: 2016-12-23, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.