Found 6 inspections:

# 161802139728
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 09112018 8507 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 02112018 1219109601 to 19112018 The objectives of this audit are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, and compliance with the instructions of state control bodies, supervision bodies, municipal control bodies.


# 161802034211
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 161800679716
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 14062017 case 121120170062, the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility by the developer, customer, or person carrying out construction on the basis of a contract with the developer or customer. 7 The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170701400057
Unscheduled inspection
Start date: 2017-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701298089
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: To establish that this inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an inspection report completed by reconstruction In accordance with the notice received by the Inspection dated 28/122016 11985 on the completion of construction and reconstruction at the capital construction facility, the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The real purpose of the check is to select the required compliance with mandatory requirements


# 16160601788967
Unscheduled inspection
Start date: 2016-08-16, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.