# 001902614527
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160601662270
Unscheduled inspection
Start date: 2016-06-06, end date: 2016-07-04, duration: —
Authority: Privolzhskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of the fulfillment of the previously issued regulation 17m dated 26022016
# 162005213422
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162005213401
Unscheduled inspection
Start date: 2020-11-10, end date: 2020-11-10, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: To determine the compliance of the eliminated violations with the requirements of the project documentation, as well as for the purpose of drawing up an act on the elimination of violations on the basis of the notice received by the Inspectorate from 29102020 12038 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which were ordered to be eliminated within the time period established by the regulation from 20072020 1412015201 to 30112020, the prevention and detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the site on the basis of an agreement with the developer or the customer for violations of compliance of the works performed during the construction of the capital construction facility with the requirements of the project documentation, compliance with the instructions of the state control bodies, supervision bodies of municipal control
# 162004448097
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-20, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 27052020 1412009501, the deadline for which has expired 30062020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 162004448079
Unscheduled inspection
Start date: 2020-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004445684
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-20, duration: 11
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 23042020 case 131120150024 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004411412
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 23042020 case 131120150024 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004411402
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 20122019 1412031701, the deadline for which has expired 25052020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 161904132134
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notice dated 17122019 13172 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 14112019 1412027101 to 20122019 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 161904130356
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notice dated 16122019 13095 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 14112019 1412027301 to 20122019 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 161904104100
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161904097454
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903999439
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19112019 case 132320130105the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts
# 161903912298
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 12072019 case 132320130105the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161903904288
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903890298
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903890336
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the fact of execution of the order, the deadline for which has expired, and drawing up an act based on the results of the inspection, prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, compliance with the instructions of state control bodies, supervision bodies, municipal control bodies
# 161903874204
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 19092019 1312048301, the deadline for which expired on 15102019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.
# 161903805819
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 01102019 9461 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 19092019 1312048301 to 11102019G tasks This audit is aimed at preventing as well as detecting and suppressing violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is compliance with the instructions of state control bodies, supervision bodies, municipal control bodies
# 161903400908
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-09-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 06092019 case 132320130103the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, carried out during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts
# 161902882273
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 12072019 case 132320130105the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities. legal acts
# 161902882353
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 12072019 case 132320130103the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities. legal acts
# 001902614527
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-11, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination by a legal entity of previously identified violations of the mandatory requirements specified in paragraphs 1 to 6 of the regulation dated 06022019 g 432128014
# 161902602038
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902472469
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902462164
Unscheduled inspection
Start date: 2019-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902459975
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-06, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination by a legal entity of previously identified violations of the mandatory requirements specified in subclause 110 of Regulation No. 432128238 dated 04102018
# 161802090344
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 16042013 case 132320130105 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 161802090402
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800558392
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800350276
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-29, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 161800092872
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-02-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 14022018 1037 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 24042013 1319001201 to 24062013 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 161800092925
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-02-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 14022018 1037 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 24042013 1319001301 to 24062013 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 16170802994136
Unscheduled inspection
Start date: 2017-12-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170802993168
Unscheduled inspection
Start date: 2017-12-20, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170802785842
Unscheduled inspection
Start date: 2017-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170802692622
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with case 131120150061 with the verification program dated 11092016
# 16170802513589
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701776786
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. In accordance with the inspection program dated 16042013 case 132320130106the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 16170701776231
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701671495
Unscheduled inspection
Start date: 2017-06-14, end date: 2017-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction from 03032017 1319006601, the deadline for which expired on 27052017, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulatory documents. legal acts and project documentationthe subject of this audit is to comply with the Inspection regulations
# 16170701500966
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 27032017 2207 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 08072016 1319030101 to 31032017G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of the capital construction facility. The subject of this audit is to comply with the requirements of the Inspection
# 16170701501063
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701405572
Unscheduled inspection
Start date: 2017-02-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701301825
Unscheduled inspection
Start date: 2017-01-18, end date: 2017-01-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of the fulfillment of the instruction dated 05/122016 1319067201, the deadline for which expired on 30122016, and to draw up an act based on the results of the inspection. The subject is the fulfillment of the Inspection instructions.
# 16170701322253
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: The inspection is carried out in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. The purpose of the inspection is to prevent, identify and prevent violations committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer of violations of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation Subject to verification of compliance with mandatory requirements or requirements established by municipal legal acts
# 16160701142026
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16160701033459
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 12102016 9036 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 23092016 1319049001 to 21102016 tasks prevention and also, the identification and suppression of violations committed by the person carrying out construction on the basis of a contract with the developer or the customer of the compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, is subject to the requirements of the Inspection
# 16160701033401
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 12102016 9037 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 23092016 1319048901 to 21102016 tasks prevention and also, the identification and suppression of violations committed by the person carrying out construction on the basis of a contract with the developer or customer of the compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, is subject to the requirements of the Inspection
# 16160700804396
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used based on the notice received by the Inspectorate from 08092016 7826 on the completion dates of work that are subject to verification at the capital construction facility tasks of construction prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, subject to compliance with mandatory requirements or requirements established by municipal legal acts
# 16160700637918
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 08092016 7821 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 12082016 1319039501 to 09092016 tasks prevention and also, the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, is subject to compliance with mandatory requirements or requirements established by municipal legal acts.
# 16160700635936
Unscheduled inspection
Start date: 2016-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160700068662
Unscheduled inspection
Start date: 2016-08-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 00160601662270
Unscheduled inspection
Start date: 2016-06-06, end date: 2016-07-04, duration: —
Authority: Privolzhskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of the fulfillment of the previously issued regulation 17m dated 26022016