# 242101450766
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 273 dated 12/07/2021) on the completion of the construction of the capital construction facility;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.
7. The subject of this audit is compliance with:
7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation);
7.2. Building permit requirements;
7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 242101310441
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242101085591
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242101290569
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242101120479
Unscheduled inspection
Start date: 2021-10-08, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1619-ONS-2 dated 07/23/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/07/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242101280289
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 1770-ONS-2 dated 08/25/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/28/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242101079637
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242100322657
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:
This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program dated 02/25/2021 for inspections during the construction of the capital construction facility.;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.
7. The subject of this audit is:
7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources;
7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
7.3. Verification of the construction permit.
# 242100300086
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242100310029
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1083-ONS-2 dated 05/31/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/22/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242100193059
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program dated 02/25/2021 for inspections during the construction of the capital construction facility.;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.
7. The subject of this audit is:
7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources;
7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
7.3. Verification of the construction permit.
# 242100167809
Unscheduled inspection
Start date: 2021-05-07, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:
This inspection is carried out in order to verify the fulfillment of the instruction No. 403-ONS-2 dated 03/16/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/06/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242100168091
Unscheduled inspection
Start date: 2021-05-07, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:
This inspection is carried out in order to verify the fulfillment of the instruction No. 393-ONS-2 dated 03/16/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/06/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242100035370
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 25 dated 02/19/2021) on the start of construction of the capital construction facility;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.
# 242100036240
Unscheduled inspection
Start date: 2021-03-03, end date: 2021-03-31, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 11.11.2019 inspections during the construction of the capital construction facility; the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, in particular including the project documentation.7. The subject of this audit is:7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Checking the availability of a building permit
# 242005282619
Unscheduled inspection
Start date: 2020-12-23, end date: 2021-01-27, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 267 dated 15122020 on the completion of the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this inspection is71 Verification of compliance with the work performed and the construction materials used materials during the construction of a capital construction facility as well as the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model They are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, all acts prescriptions notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision72 Compliance with the requirements set out in Parts 2 are subject to verification. 3 and 31 of Articles 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit
# 242005242152
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 11/12/2019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit
# 242005243091
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 11/12/2019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit
# 242005202856
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242005213655
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19062020 1048-2 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28102020 bx 71 on the elimination of violations. The purpose of this inspection is to establish the fact of the elimination of previously identified violations.7 The subject of this inspection is the fulfillment of the lawful instruction of the body carrying out regional state construction supervision, the deadline for which is expired 28082020
# 242005213653
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19062020 1048-2 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28102020 bx 71 on the elimination of violations. The purpose of this inspection is to establish the fact of the elimination of previously identified violations.7 The subject of this inspection is the fulfillment of the lawful instruction of the body carrying out regional state construction supervision, the deadline for which is expired 28082020
# 242005213495
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19062020 1048-2 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28102020 bx 71 on the elimination of violations. The purpose of this inspection is to establish the fact of the elimination of previously identified violations.7 The subject of this inspection is the fulfillment of the lawful instruction of the body carrying out regional state construction supervision, the deadline for which is expired 28082020
# 242005212657
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 03092020 1901-2 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28102020 bx 72 on the elimination of violations. The purpose of this inspection is to establish the fact of elimination of previously identified violations.7 The subject of this inspection is the fulfillment of a lawful instruction of the body carrying out regional state construction supervision, the deadline for which is expired 22102020
# 242004479177
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-09-02, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 109 dated 30072020 on the completion of the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this inspection is71 Checking the compliance of the work and the applied construction materials during the construction of a capital construction facility as well as the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model They are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, all acts prescriptions notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision72 Compliance with the requirements set out in Parts 2 are subject to verification. 3 and 31 of Articles 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit
# 242004461018
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 14/122018 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7. The purpose of this audit is to check the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation73 Checking the availability of a building permit
# 242004450331
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-08-05, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: the implementation of regional state construction supervision during the construction of the specified capital construction facility on the basis of notification 88 received from 02072020 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including project documentation7 The subject of this audit is71 Checking the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation. the Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, all acts regulations notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code are subject to verification Of the Russian Federation73 Checking the availability of a building permit
# 242004451334
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-31, duration: 2
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: conducting an inspection
# 242004420538
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242004420536
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 14/122018 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit
# 242004419678
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 15052018 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit
# 242004408854
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-09, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Appoint Andrey Pavlovich Belov, State Inspector of the Construction Supervision Department of the second territorial zone, Dmitry Viktorovich Leichner, State Inspector of the Construction Supervision Department of the second territorial zone, Andrey Pavlovich Punda, State Inspector of the Construction Supervision Department of the second territorial zone, Lyudmila V. Tveritneva
# 242004372814
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 11112019 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation
# 242004372804
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to inspection in accordance with the approved program dated 14/122018 for inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation
# 242004294824
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15052018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation
# 242004335853
Unscheduled inspection
Start date: 2020-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004335707
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-03-26, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of an instruction previously issued to the person being checked dated 31.012020 3684-2 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12032020 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 242004235230
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-28, duration: 19
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 28022014 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation
# 242004225773
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-03-10, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Krasnoyarskomu krayu
Purpose of inspection: purpose control over the execution of the instruction issued by LLC PSK OMEGA on the elimination of the identified violation of the requirements of the land legislation of the Russian Federation dated 28062019 815, the deadline for elimination of which expired on December 27, 2019 tasks ensuring the elimination of LLC PSK OMEGA within the prescribed period of violation of the requirements of the land legislation of the Russian Federation expressed in the unauthorized occupation of part of the land plot, including the use of part of the land plot by a person having no rights provided for by the legislation of the Russian Federation to the specified land plot with a total area of 5692 sq. m. in order to place a checkpoint, parts of the construction site that are fenced with reinforced concrete slabs and metal profiles, namely, parts of the land plot of the unrestricted state ownership of the cadastral quarter 24500400149 with an area of 5692 sq. m. located on the southwestern side relative to the land plot located at the address kRasnoyarsk Partizan Zheleznyak Street with the cadastral No. 24500400149735 subject: a legal entity fulfills, within the prescribed period, the instructions of the federal body exercising state land supervision, including with respect to agricultural land or its territorial body, to eliminate violations of the requirements of the land legislation of the Russian Federation
# 242004120295
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004120280
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-01-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to inspection in accordance with the approved program dated 14/122018 for inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation
# 242004234665
Unscheduled inspection
Start date: 2020-01-31, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242004238626
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-02-14, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this audit is conducted for the purpose of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the identification during the analysis of the developer's quarterly reports on activities related to attracting funds from participants in shared-equity construction for the construction of apartment buildings and or other real estate objects of signs of violation of mandatory requirements motivated presentation based on the results preliminary inspection dated 27/12/2019 376 the objectives of this inspection are to prevent identify and suppress violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate
# 242004198040
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-30, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 26112019 3367C2 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 16012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 242004198026
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241903868962
Unscheduled inspection
Start date: 2019-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903919915
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241903891919
Unscheduled inspection
Start date: 2019-11-08, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241903947833
Unscheduled inspection
Start date: 2019-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903806701
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903594304
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-10-03, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 02072019 1981C1, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 19092019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 24190803468651
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803448394
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 15052018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 24190803437309
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 94 dated 07062019 on the completion of the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the building materials used during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and design documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification by all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation verification of a building permit
# 24190803412402
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-06-07, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 68 dated 29042019 on the completion of the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the construction materials used during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and design documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, are subject to verification by all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation verification of a building permit
# 24190803412526
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803405338
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated 14/122018 for inspections during the construction of the capital construction facility The objectives of the audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 24190803391396
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-25, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked order 194OZHS dated 27022019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11042019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 241902578561
Unscheduled inspection
Start date: 2019-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803364958
Unscheduled inspection
Start date: 2019-03-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803375583
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-04-01, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 194SENiEK dated 28022019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 24190803361305
Unscheduled inspection
Start date: 2019-03-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24190803361250
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 15052018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 241902467820
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241802180701
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-20, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 26102018 3883OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241802285936
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 301 dated 06/122018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping a capital construction facility with metering devices for used energy resources 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code Code of the Russian Federation 73 Checking the availability of a building permit
# 241802214939
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 19102018 3883TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 14122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241802178428
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-12-20, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission by Elena Anatolyevna Zhurbenko, Deputy Head of the Shared-equity Supervision Department, dated 13112018 165 on violations of mandatory disclosure requirements by the developer in the Unified Housing Information System. The objectives of this audit are to prevent identify and suppression of violations of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 241802028576
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241801695950
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241801623050
Unscheduled inspection
Start date: 2018-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800629360
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-30, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 13072018 2375OZHS on the elimination of identified violations at the specified capital construction facility, which expires on 16082018, previously issued to the person being checked. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800583488
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800529885
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being audited dated 23052018 1723OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241800486522
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 31052017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241800424922
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 11052018 1585TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 04062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800342211
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-24, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 17042018 840OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 10052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241800357495
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 67 dated 03052018 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with the all acts prescriptions notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision are subject to verification in accordance with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a building permit
# 241800361974
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-06-09, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 102 dated 04052018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit
# 241800417375
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 11052018 1585TN on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 25052018 bx 116 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.
# 241800377621
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-07, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 11042018 873OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 24052018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241800377246
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-07, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 02032018 509OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 24052018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800341658
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 17042018 840NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 24042018 bx 65 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of the lawful order of the body carrying out regional state construction supervision.
# 241800303020
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-05-18, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 08022018 88OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 03052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800216808
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 31052017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241800341636
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 17042018 840TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800209082
Unscheduled inspection
Start date: 2018-03-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800083402
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 5548OZHS dated 11.012018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01032018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 24180803055258
Unscheduled inspection
Start date: 2018-01-19, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800010866
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-08, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 24180803014826
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-01-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31052017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits
# 24170802947518
Unscheduled inspection
Start date: 2017-12-12, end date: 2018-01-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 325 dated 301/12017 on the completion of the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this inspection is71 Verification of the conformity of work performed and applied construction materials during the construction of a capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification by all acts regulations notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision72 Compliance with the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation73 Checking the availability of a building permit
# 24170802960996
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 24102017 4296NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12122017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802881978
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-11, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 27102017 4176EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27112017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802762346
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 02092016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility
# 24170802882452
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802761834
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170802836888
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-12-01, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction dated 29092017 3973TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17112017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802842098
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-12-04, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 24102017 4296EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20112017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802824331
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 29092017 3973TN on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 02112017 vx 117 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures.7 The subject of this inspection is The purpose of the inspection is to comply with the legal order of the body carrying out the regional state construction supervision, the deadline for which expires on the DATE respectively.
# 24170802771449
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-10-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31052017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility
# 24170802576790
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 17042015 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities including technical regulations and design documentation The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the availability of a construction permit, verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that
# 24170801946721
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 11072017 2952OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 14092017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out regional State construction supervision
# 24170802191712
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802619389
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170801914116
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 01082013 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility
# 24170701838274
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 01082013 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility
# 24170701831921
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17042015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility
# 24170701764562
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-20, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 31052017 1751OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06072017 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701655870
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 27042017 1096OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01062017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701613414
Unscheduled inspection
Start date: 2017-05-19, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701650182
Unscheduled inspection
Start date: 2017-05-30, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701546606
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701471039
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17042015 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verifying the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of a capital construction facility
# 24170701381736
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701404813
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-15, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 102OZHS dated 27.012017 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28022017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body implementing the regional State construction supervision
# 24170701390031
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 01082013 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, and to verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that provide impact on the safety of a capital construction facility
# 24170701389191
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24160700574301
Unscheduled inspection
Start date: 2016-08-17, end date: 2016-09-13, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Krasnoyarskomu krayu
Purpose of inspection: verification of regulation 4412c dated 07092015
# 24150601400648
Unscheduled inspection
Start date: 2015-10-21, end date: 2015-11-18, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Krasnoyarskomu krayu
Purpose of inspection: Compliance with consumer protection legislation