# 282201485938
Unscheduled inspection
Start date: 2022-01-10, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 08/20/2021;
prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used;
verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used;
# 282201486069
Unscheduled inspection
Start date: 2022-01-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282101411849
Unscheduled inspection
Start date: 2021-12-03, end date: 2021-12-16, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 05/13/2021, prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101465963
Unscheduled inspection
Start date: 2021-12-22, end date: 2022-01-12, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used., prevention, identification and suppression of violations of compliance committed by the developer, technical customer, person carrying out construction performed during the construction of the facility capital construction, as well as the results of such work to the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used, verification of compliance of the work and construction materials used during the construction of the capital construction facility, as well as the results of such work to design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 282101430632
Unscheduled inspection
Start date: 2021-12-20, end date: 2021-12-30, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/23/2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101285928
Unscheduled inspection
Start date: 2021-11-09, end date: 2021-11-17, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 07/20/2021, prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282101244005
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282101243976
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282101243998
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282101344500
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100899320
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 08/20/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources, verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101241986
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 08/20/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources, verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100899300
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 08/20/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources, verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101237497
Unscheduled inspection
Start date: 2021-10-28, end date: 2021-11-12, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 12/18/2019, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101217813
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282100640465
Unscheduled inspection
Start date: 2021-09-09, end date: 2021-09-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 01/22/2020, verification of compliance of the work and construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100935086
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 05/13/2021., prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100614603
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100574391
Unscheduled inspection
Start date: 2021-09-02, end date: 2021-09-16, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 12/18/2019., prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used., verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100772291
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100510346
Unscheduled inspection
Start date: 2021-08-23, end date: 2021-09-03, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction of the facility., The objectives of this audit are: verification of the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, based on the notice of completion of the facility (vx. No. 1495 dated 08/17/2021);, The subject of this audit is: checking the compliance of the work and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.;
# 282100349262
Unscheduled inspection
Start date: 2021-07-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282100372085
Unscheduled inspection
Start date: 2021-07-23, end date: 2021-08-05, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 09.10.2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy checking the compliance of the work and the construction materials used in the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282100372089
Unscheduled inspection
Start date: 2021-07-23, end date: 2021-08-05, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/25/2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the works performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100372092
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100372090
Unscheduled inspection
Start date: 2021-07-23, end date: 2021-08-05, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 04/13/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the works performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100272676
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-06-25, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 07/20/2020, verification of compliance of the work and construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100272673
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-06-25, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/23/2020, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100272659
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-06-25, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/12/2019, verification of compliance of the work performed and the construction materials used in the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100306450
Unscheduled inspection
Start date: 2021-06-25, end date: 2021-07-02, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 01/22/2020, prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used., verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100300153
Unscheduled inspection
Start date: 2021-06-23, end date: 2021-07-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 12/18/2019, prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100305761
Unscheduled inspection
Start date: 2021-06-24, end date: 2021-07-02, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 06/01/2020, prevention, identification and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100294866
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-02, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 02/03/2021, prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100246693
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282100245538
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: conducting inspections approved on 04/13/2021.
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.;
Subject The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.;
# 282100245395
Unscheduled inspection
Start date: 2021-05-31, end date: 2021-06-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 04/13/2021, verification of compliance of the work and construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100245371
Unscheduled inspection
Start date: 2021-05-31, end date: 2021-06-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 09.10.2020, verification of compliance of the work and the construction materials used in the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100214070
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282100240588
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-05-28, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 04/02/2021, prevention, detection and suppression of violations committed by the developer, technical customer, person carrying out construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100161625
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-19, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 02/01/2021.
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used. The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.
# 282100161073
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 06/03/2019, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100133258
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/25/2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the works performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100154847
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/12/2019, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy used verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100132818
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this check is carried out in order to:
- execution of the inspection program approved on 06/03/2019
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.
# 282100132743
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This audit is carried out in order to: implement the audit program approved on 12.11.2019.
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.
# 282100119075
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-21, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this check is carried out in order to:
- execution of the inspection program approved on 12/18/2019
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100115416
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-19, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: execution of the inspection program approved on 12/28/2020
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.
# 282100161994
Unscheduled inspection
Start date: 2021-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100027834
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282105345041
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282105345028
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-02-20, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: execution of the inspection program approved on 06/01/2020
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility accounting for the energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100005408
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-03-15, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the verification is carried out in order to:
- execution of the inspection program approved on 02/03/2020
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.
# 282100005396
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-03-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the verification is carried out in order to:
- execution of the inspection program approved on 12.11.2019
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used.
# 282100044528
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-03-15, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/23/2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282105314399
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-02-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This audit is carried out in order to: implement the audit program approved on 11/25/2020
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is: verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used.
# 282105348370
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-02-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 11/25/2020
# 282005274565
Unscheduled inspection
Start date: 2020-12-22, end date: 2021-01-26, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved by 10082020the tasks of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282005252167
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to fulfill the verification program, the tasks of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used by the subject of this verification is the verification of compliance of the work performed and the construction materials used in the construction of a capital construction facility as well as the results of such work with design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282005268105
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282005268065
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282005235111
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-12-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 12112019 The tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282005196339
Unscheduled inspection
Start date: 2020-10-23, end date: 2020-11-30, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used on the basis of a notice from the developer JSC "SZ "Amurstroy" on the completion of the construction of the capital construction facility vx 1807 dated 13102020 execution of the inspection program approved by 06052019, the tasks of this audit are the prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used
# 282005187831
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 12112019 The tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282005178409
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-11-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used on the basis of the notice of completion of the construction of the facility bx 1756 dated 05102020the tasks of this inspection are to prevent the identification and suppression of technical violations committed by the developer by the customer, the person carrying out the construction of violations of compliance of the works performed during the construction of the capital construction facility, as well as the results of such works, with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such works the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 282005176810
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-30, duration: 17
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved by 10082020the tasks of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282004522109
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-25, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to fulfill the verification program, the tasks of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used by the subject of this verification is the verification of compliance of the work performed and the construction materials used in the construction of a capital construction facility as well as the results of such work with design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282004480629
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-14, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 06052019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282004474191
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program approved by 30112018 The tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004474183
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004474175
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program approved by 12112019. The tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources The purpose of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used
# 282004474164
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004447861
Unscheduled inspection
Start date: 2020-07-08, end date: 2020-07-20, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved 11042019the tasks of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282004465073
Unscheduled inspection
Start date: 2020-07-24, end date: 2020-08-14, duration: 16
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved on 22012020the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance with the implementation of works and construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004464768
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004443285
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used on the basis of the notice of completion of the construction of the facility bx 1052 from 19062020the tasks of this inspection are to prevent the identification and suppression of technical violations committed by the developer the customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 282004443120
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 30112018 The tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282004443055
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004426967
Unscheduled inspection
Start date: 2020-06-05, end date: 2020-07-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 06052019the tasks of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282004436694
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004413246
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved on 03062019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282004413238
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 12112019 The tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282004413222
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 12112019 The tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282004413255
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 30112018 The tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282004407644
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-06-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used Task prevention detection and suppression of violations of compliance committed by the developer technical customer the person carrying out construction performed during the construction of the capital construction facility as well as the results of such violations the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used. The purpose is to check the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used
# 282004351255
Unscheduled inspection
Start date: 2020-04-13, end date: 2020-05-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v Amurskoi oblasti
Purpose of inspection: this audit is carried out with the aim of implementing federal state supervision over compliance by a legal entity or an individual entrepreneur with mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms in connection with the execution of the order of the head of the Federal Service for Labor and Employment of the Ministry of Justice Ivankov dated 07022020 g 29"0 conducting unscheduled on-site inspections of compliance by employers engaged in the construction of state-owned enterprises regulatory requirements for labor protection and proper registration of employment contracts with employees or the conclusion of civil law contracts actually regulating labor relations between an employee and an employer" issued on the basis of an order from Deputy Prime Minister of the Russian Federation TA Golikova dated 27/122019 TG 1211486the tasks of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms. observance and protection of labor rights and freedoms of citizens including the right to safe working conditions ensuring compliance by employers with labor legislation and other regulatory legal acts containing labor law norms The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 282004335093
Unscheduled inspection
Start date: 2020-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004362530
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: purpose verification on the basis of the received notification from the developer about the start of construction of vx 66 dated 15012020 of the execution of the inspection program approved on 22012020the tasks of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the facility The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with accounting devices for the energy resources used
# 282004362506
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used Task prevention detection and suppression of violations of compliance committed by the developer technical customer the person carrying out construction performed during the construction of the capital construction facility as well as the results of such violations the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used. The purpose is to check the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used
# 282004335354
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-04-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved from 03022020the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 282004335318
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-04-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved on 03062019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 282004270815
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-03-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance with the work and construction materials used during the construction of the capital construction facility and also, the results of such work meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004270755
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-03-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance with the work and construction materials used during the construction of the capital construction facility and also, the results of such work meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004270650
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-03-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of compliance with the work and construction materials used during the construction of the capital construction facility and also, the results of such work meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004198073
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-02-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used
# 282004202155
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-02-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved by 11042019the tasks of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281904127756
Unscheduled inspection
Start date: 2019-12-20, end date: 2020-01-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 06052019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281904065956
Unscheduled inspection
Start date: 2019-12-06, end date: 2020-01-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the objectives of this audit are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility and also, the results of such work meet the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility construction of metering devices for energy resources used
# 281904067067
Unscheduled inspection
Start date: 2019-12-13, end date: 2020-01-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 12112019 The tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281904067029
Unscheduled inspection
Start date: 2019-12-13, end date: 2020-01-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 12112019 The tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements of equipment of the capital construction facility with metering devices for the energy used The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281903992686
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281903898338
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 06052019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281903905612
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the verification task program is to prevent the identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used capital construction as well as the results of such works and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903851498
Unscheduled inspection
Start date: 2019-10-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281903851168
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the objectives of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out the construction during the construction of the capital construction facility as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used, the subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 281903851070
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: 6 To establish that this inspection is carried out in order to verify the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used. The objectives of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out the construction during the construction of a capital construction facility, as well as the results of such work, to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.7 The subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with design documentation, including the requirements energy efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used
# 281903297342
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281903296996
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903294118
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903296192
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903296235
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281903290803
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903713536
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved in 19042019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903397269
Unscheduled inspection
Start date: 2019-09-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281903685250
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: purpose verification of the execution of the inspection program approved by 30042019the tasks of this audit are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281903682373
Unscheduled inspection
Start date: 2019-09-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902934475
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: purpose verification based on the execution of the verification program approved by 06052019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used by the subject of this The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281902934534
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 06052019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281902857973
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902857827
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902858060
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902858017
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902857888
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902857633
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902853427
Unscheduled inspection
Start date: 2019-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902883258
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-08-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved by 02072019 task is to prevent the identification and suppression of violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used, Verification of compliance of the work and the construction materials used in the process the construction of the capital construction facility as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902813171
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose verification of the execution of the inspection program approved by 26062018the tasks of this audit are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281902767994
Unscheduled inspection
Start date: 2019-06-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902717146
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-06-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 06052019the tasks of this inspection are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify compliance the performance of works and construction materials used in the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281902716709
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902716759
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902716734
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit are the prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources7 The subject of this audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902716672
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902716527
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902658431
Unscheduled inspection
Start date: 2019-04-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902661746
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902678372
Unscheduled inspection
Start date: 2019-04-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902587268
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 7 The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281902587433
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902587038
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 7 The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281902587230
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902587321
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 7 The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281902570993
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902570950
Unscheduled inspection
Start date: 2019-03-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902535282
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved on 04122018 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used construction materials in the process of construction of a capital construction facility as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281902452000
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281802213993
Unscheduled inspection
Start date: 2018-12-07, end date: 2019-01-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved on 04122018 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and the construction materials used in the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281802297334
Unscheduled inspection
Start date: 2018-12-17, end date: 2019-01-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used. The objectives of this inspection are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, the person carrying out construction, performed during construction the object of capital construction as well as the results of such work to the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used, the subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 281802088377
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281802095779
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-12-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: purpose verification based on the execution of the verification program approved by 15022018 The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281802093925
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-12-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 7 The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281802044762
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281802044737
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281801857581
Unscheduled inspection
Start date: 2018-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281801919849
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281801974033
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281801979957
Unscheduled inspection
Start date: 2018-10-19, end date: 2018-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: purpose verification of the execution of the inspection program approved by 26062018 The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for used energy resources 7 The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281801193479
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281801696437
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 7 Subject The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281801696407
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 7 Subject The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800896124
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-10-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program approved by 04082017. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800444237
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-07-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 04082017 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used by the subject of this The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800494551
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose verification of the fulfillment of regulation 9 p2 of 24052018 The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used
# 281800490576
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 7 Subject The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800490586
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 7 Subject The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800478162
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-07-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: purpose verification based on the execution of the verification program approved by 15022018 The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800474977
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved by 08022018 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used by the subject of this The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800393284
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program approved 17052018 The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used by the subject of this The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800301937
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-05-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 08022018 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used by the subject of this The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281800290114
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-05-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 11032016 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources The subject of this inspection is verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800244409
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the execution of the inspection program approved by 04082017 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used by the subject of this The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used
# 281800072577
Unscheduled inspection
Start date: 2018-02-15, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281800108274
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281800103144
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-03-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose verification on the basis of the received notification of the developer on the start of construction of vx 150 from 14022018 of the execution of the inspection program approved by 15022018 The objectives of this audit are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800102898
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-03-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose verification based on the received notification of the developer on the start of construction of vx 151 from 14022018 of the execution of the inspection program approved by 15022018 The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and 7 The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 281800108308
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work object with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the objectives of this audit are to prevent identify and suppress violations of compliance by the developer, the technical customer, the person carrying out the construction during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 281800048381
Unscheduled inspection
Start date: 2018-01-31, end date: 2018-02-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 11032016 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources The subject of this inspection is verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 28180803055279
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-02-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 04082017
# 28170802802584
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: notice of completion of construction dated 27102017
# 28170802881300
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: according to the inspection program approved from 11032016
# 28170802911077
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 28170802710033
Unscheduled inspection
Start date: 2017-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 28170802752858
Unscheduled inspection
Start date: 2017-10-20, end date: 2017-11-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 13062017
# 28170802752913
Unscheduled inspection
Start date: 2017-10-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 28170802718982
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-11-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of compliance with regulation 95 of 21072016
# 28170802618859
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-10-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 28170802397481
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 11032016
# 28170802396902
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 28112016
# 28170701894771
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: upon notification of completion of construction
# 28170701894763
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: checking on the notification of completion of construction
# 28170701904366
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-09-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: receiving notification of the start of construction
# 28170801946140
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program
# 28170801946108
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program
# 28170701901069
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-28, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Amurskoi oblasti
Purpose of inspection: The purpose is to conduct an on-site inspection of newly erected and under construction residential buildings The task is to comply with mandatory requirements for the implementation of legislation The subject of verification is to carry out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, to prevent the occurrence of emergency situations of natural and man-made character, to ensure the safety of the state, and to eliminate the consequences of causing such harm
# 28170701840738
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-08-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program verification of the execution of the prescription