# 00170701719129
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-20, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Chairman of the Government of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating Tower cranes from 2017 to 2019"The objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts.7 The subject of this audit is compliance with by a legal entity in the course of carrying out activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings, facilities, equipment and materials used, as well as requirements for machinery and equipment and related requirements for these products operation and disposal processes
# 00160601585488
Unscheduled inspection
Start date: 2016-04-19, end date: 2016-04-19, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of paragraphs 2 and 3 of the issued order dated March 23, 2016 PA721011
# 282201528672
Unscheduled inspection
Start date: 2022-01-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282101418311
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282101389647
Unscheduled inspection
Start date: 2021-11-26, end date: 2021-12-09, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction of the facility and resolution of the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, based on the notice of completion of the facility (vx. No. 2171 dated 11/23/2021)., prevention, identification and suppression of by the developer, the technical customer, the person carrying out the construction of violations of the compliance of the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, checking the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 282101350806
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-12-02, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction of the facility and resolution of the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources based on the notice of the developer JSC "SZ Blagoveshchenskstroy" on the completion of construction of the capital construction facility (vh. № 2095 dated 12.11.2021); - execution of the inspection program approved on 05/20/2021;, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 282101237742
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282101229385
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-12, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 06/09/2021., prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used;, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources;
# 282101225858
Unscheduled inspection
Start date: 2021-10-21, end date: 2021-11-03, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 05/20/2021., prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100812154
Unscheduled inspection
Start date: 2021-09-24, end date: 2021-10-07, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 01/22/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used
# 282100812153
Unscheduled inspection
Start date: 2021-09-24, end date: 2021-10-07, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the implementation of the inspection program approved on January 29, 2019, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100551739
Unscheduled inspection
Start date: 2021-09-01, end date: 2021-09-14, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 06/09/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100349240
Unscheduled inspection
Start date: 2021-07-19, end date: 2021-07-30, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the implementation of the inspection program approved on 05/20/2021, the prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources., verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100332051
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100332063
Unscheduled inspection
Start date: 2021-07-09, end date: 2021-07-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 17.09.2020., prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100332053
Unscheduled inspection
Start date: 2021-07-09, end date: 2021-07-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 01/29/2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the works performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources
# 282100273960
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-06-25, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the fulfillment of regulation No. 6 dated 30.04.2021, The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility monitoring of the conformity of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.;
# 282100239205
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100227098
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: - execution of the inspection program approved on 02/01/2021.
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100206927
Unscheduled inspection
Start date: 2021-05-14, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: execution of the inspection program approved on 16.10.2019
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and equipment requirements of the capital construction facility metering devices used energy resources.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100239561
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-05-27, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 10/16/2019, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources., verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100245369
Unscheduled inspection
Start date: 2021-05-31, end date: 2021-06-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 01/22/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100157432
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-05-07, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 01/29/2020., prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the works performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices used energy verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100157435
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-05-07, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the implementation of the inspection program approved on 09/17/2020, the prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources. verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources.
# 282100091350
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This check is carried out in order to:
- execution of the inspection program approved on 01/22/2021.
The objectives of this audit are:
prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is
to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100078321
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-09, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 02/01/2021.
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100002372
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-03-12, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: - execution of the inspection program approved on 16.10.2019
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and the requirements of the equipment of the capital construction facility accounting of used energy resources.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100005686
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-03-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the verification is carried out in order to:
- execution of the inspection program approved on 17.09.2020.
The objectives of this audit are:
prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and equipment requirements of the capital construction facility metering devices used energy resources.
The subject of this audit is
to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282005230327
Unscheduled inspection
Start date: 2020-11-18, end date: 2020-12-15, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the verification program The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282005235101
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-12-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit, approved by 17092020, are to prevent, identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the work performed and the construction methods used. materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources
# 282005235089
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-12-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The tasks of this audit, approved by 26092019, are to prevent, identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the work performed and the construction methods used. materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources
# 282005187817
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program approved on 29012020the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. inspections are checks of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping an investment facility with metering devices for energy resources used
# 282004497902
Unscheduled inspection
Start date: 2020-08-21, end date: 2020-09-17, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used based on the notice of completion of the facility, tasks are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, and the person carrying out the construction the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for the equipment of the facility capital construction with metering devices for used energy resources
# 282004474152
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program approved on 29012020the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this inspection It is a verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282004469261
Unscheduled inspection
Start date: 2020-07-28, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004459043
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-08-13, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 16102019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the requirements of the capital construction facility. the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004443134
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program approved by 26092019the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this inspection is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004443126
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004407539
Unscheduled inspection
Start date: 2020-05-07, end date: 2020-06-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 05/12/2019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004411855
Unscheduled inspection
Start date: 2020-05-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004411841
Unscheduled inspection
Start date: 2020-05-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004407669
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-06-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the verification program The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 282004411194
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-06-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the purpose of the verification program The objectives of this audit are to prevent identify and prevent violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004346881
Unscheduled inspection
Start date: 2020-03-13, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004259685
Unscheduled inspection
Start date: 2020-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004275677
Unscheduled inspection
Start date: 2020-02-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004275197
Unscheduled inspection
Start date: 2020-02-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004270604
Unscheduled inspection
Start date: 2020-02-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281904086660
Unscheduled inspection
Start date: 2019-12-11, end date: 2020-01-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 15082019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the requirements of the capital construction facility. works and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281904086733
Unscheduled inspection
Start date: 2019-12-12, end date: 2020-01-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 16102019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the requirements of the capital construction facility. the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903935075
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-12-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the inspection is to verify the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this inspection are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, the person carrying out the construction, and as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, The purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for the equipment of the capital construction facility construction of metering devices for used energy resources
# 281903929458
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281903880606
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 10082018the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.7 The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903871064
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program approved by 06032019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903811712
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-11-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved 03092018the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903901162
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program approved by 26092019the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903597422
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-10-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 15082019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the requirements of the capital construction facility. works and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903291115
Unscheduled inspection
Start date: 2019-09-04, end date: 2019-09-06, duration: —
Authority: Ministerstvo stroitelstva i arhitektury Amurskoi oblasti
Purpose of inspection: verification of the implementation of legislation on shared-equity construction
# 281903594090
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-10-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 06032019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used7 The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281903000408
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, the person carrying out the construction, and as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for the equipment of the facility capital construction accounting devices for used energy resources
# 281902925502
Unscheduled inspection
Start date: 2019-08-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902881531
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v Amurskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out federal state supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms. consideration of the appeal dated 01072019 No. 287133319 on violation by the employer of the employee's labor rights in terms of not issuing documents to the employee related to his work. The objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts, which contain labor law standards to ensure compliance with and protection of citizens' labor rights and freedoms, including the right to safe working conditions.
# 281902849913
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification according to the inspection program approved on December 29, 2018, the objectives of this audit are to prevent, identify and prevent violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902880882
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-08-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 06032019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used7 The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281902844165
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 10082018the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902813780
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved 03092018the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902796291
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902762737
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the verification task program is to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902694782
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-06-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 10082018 is to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902711798
Unscheduled inspection
Start date: 2019-05-08, end date: 2019-05-31, duration: —
Authority: Gosudarstvennaya inspekciya truda v Amurskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out federal state supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms consideration of the appeal dated 06052019 g 28793119OB on violation by the employer of the employee's labor rights in terms of payment of wages below the minimum wage The objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms rights ensuring the observance and protection of citizens' labor rights and freedoms, including the right to safe working conditions, The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 281902668922
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-06-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose execution of the inspection program approved on 13072018 Tasks prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility The subject of accounting for the energy resources used is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with energy resources accounting devices. building permits verification of compliance with the requirements for the performance of work by persons who are members of self-regulatory organizations
# 281902587668
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification according to the inspection program approved on December 29, 2018, the objectives of this audit are to prevent, identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902518669
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902443092
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 10082018 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The subject of this audit The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281902440692
Unscheduled inspection
Start date: 2019-01-22, end date: 2019-02-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the inspection according to the notice of the beginning of construction dated 24/12/2018 bx 1730, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281802129637
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281802055557
Unscheduled inspection
Start date: 2018-11-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281802094094
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 23112017 is to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281801974106
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-11-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed facility and the issue of issuing an opinion on the compliance of the constructed facility with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the objectives of this audit are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, the person carrying out the construction, performed during the construction of the capital construction facility, as well as The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of the equipment of the capital construction facility. metering devices for used energy resources
# 281801478049
Unscheduled inspection
Start date: 2018-09-13, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Amurskoi oblasti
Purpose of inspection:
# 281801478252
Unscheduled inspection
Start date: 2018-09-14, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Amurskoi oblasti
Purpose of inspection:
# 281800893065
Unscheduled inspection
Start date: 2018-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281801565935
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281800669778
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281800536859
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-08-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 23112017 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800531883
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-08-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 06072017the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800664934
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v Amurskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms in connection with the consideration of the appeal dated 22062018 7123718 ON violation by the employer of the employee's labor rights in terms of remuneration. The objectives of this audit are supervision and control over compliance with labor legislation and other normative legal acts containing norms of labor law ensuring observance and protection of labor rights and freedoms of citizens including the right to safe working conditions ensuring compliance by employers with labor legislation and other normative legal acts containing norms of labor law The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 281800416410
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-06-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used based on the notice of completion of the facility bx 531 dated 21052018 The task is to prevent identify and suppress by the developer, the technical customer, the person carrying out the construction of violations of compliance of the works performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. The subject is verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281800349464
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-06-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 06072017the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800399662
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800399656
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 26062017 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The subject of this inspection The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800298868
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used construction materials in the process of construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 281800319252
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 23112017 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800290295
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-04-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program approved by 26062017. The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800165781
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-04-02, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program approved on 16012017. The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800058719
Unscheduled inspection
Start date: 2018-02-09, end date: 2018-03-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program approved on 23112017. The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800058688
Unscheduled inspection
Start date: 2018-02-09, end date: 2018-03-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program approved by 06032017. The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 28170802921249
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program
# 28170802921232
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: receipt of the notification of the start of construction execution of the inspection program approved 23112017
# 28170802784945
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-11-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 16012017
# 28170802776568
Unscheduled inspection
Start date: 2017-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 28170802396557
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-10-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 26062017
# 28170802396207
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 06072017
# 28170802316766
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-10-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 06032017
# 28170701876272
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the notification of the start of construction
# 28170701871397
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-08-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: upon notification of completion of construction
# 00170701719129
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-20, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Chairman of the Government of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating Tower cranes from 2017 to 2019"The objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts.7 The subject of this audit is compliance with by a legal entity in the course of carrying out activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings, facilities, equipment and materials used, as well as requirements for machinery and equipment and related requirements for these products operation and disposal processes
# 28160701137933
Unscheduled inspection
Start date: 2016-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160601585488
Unscheduled inspection
Start date: 2016-04-19, end date: 2016-04-19, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of paragraphs 2 and 3 of the issued order dated March 23, 2016 PA721011