# 662100501270
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662005219193
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 2919176620 from 25032020the implementation of the regional state construction supervision to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "Construction of a block gas boiler house in the city of Nizhnyaya Salda at 12a Frunze Street with a capacity of 24 MW" located at 12a Frunze Street, Sverdlovsk region, Nizhny Salda, as well as the results of such work specified in paragraph 1 of Part 5 of Article 49 of the Urban Planning Code of the Russian Federation to the requirements of the design documentation, including the design documentation that takes into account the changes made in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 662004500794
Unscheduled inspection
Start date: 2020-08-26, end date: 2020-09-22, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2919176620 dated 20200325 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility Construction of a block gas boiler house in the city of Nizhnyaya Salda at 12a Frunze Street with a capacity of 24 MW located at the address Sverdlovsk region Nizhnyaya Salda 12a Frunze Street the results of such work with the requirements of the approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code. the Code of the Russian Federation