# 72170802745979
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Proverka ustraneniya narushenii po predpisaniyu ot 18092017 114317c na osnovanii izvescheniya ot 03102017 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaPreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii pri stroitelstve obekta kapitalnogo stroitelstva «Mnogoetazhnye zhilye doma po adresu g Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite 2 korpus 1 stroenie 1 2 4 5 6 7 8 9 1 ochered stroitelstva 3 etap ZHiloi dom po GP7 so vstroennym sockultbytom» raspolozhennogo po adresu Tyumenskaya oblast gorod Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite dom 2 korpus 1 stroenie 1 2 4 5 6 7 8 9
# 72170802746014
Unscheduled inspection
Start date: 2017-10-11, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 72170802212190
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-18, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notification dated 04082017 on the completion dates of works subject to verification during the construction reconstruction of a capital construction facility inspection program dated 14082017 Prevention of detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer capital construction "Multi-storey residential buildings at Tyumen Melnikaite street 2 building 1 Melnikaite street 2 building 1 building 1 2 4 5 6 7 8 9 1st stage of construction stage 4 Residential building according to GP8 with built-in social and cultural center with built-in parking lots GP81 GP82 transformer substation GP24" located at Tyumen region Tyumen city Melnikaite street 2 building 1 Melnikaite street house 2 building 1 building 1 2 4 5 6 7 8 9
# 72170802210268
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 72160701091503
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-12-07, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Osuschestvlenie gosudarstvennogo stroitelnogo nadzora na osnovanii izvescheniya o srokah zaversheniya rabot podlezhaschih proverke pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva ot 26102016Proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov pri stroitelstve obekta kapitalnogo stroitelstva «Mnogoetazhnye zhilye doma po adresu gTyumen ul Melnikaite 2 korpus 1 ul Melnikaite 2 korpus 1 stroenie 1 2 4 5 6 7 8 9» 1 ochered stroitelstva 5 etap ZHiloi dom GP10 s vstroenopristroennoi podzemnoi avtostoyankoi GP101» raspolozhennogo po adresu Tyumenskaya oblast g Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite dom 2 korpus 1 stroenie 1 2 4 5 6 7 8 9
# 72160701091413
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-12-07, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice on the completion dates of works subject to verification during construction reconstruction of a capital construction facility dated 26102016 Verification of compliance of the work and the construction materials used during construction as well as the results of such work with the requirements of technical regulations other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices used energy resources during the construction of the capital construction facility "Multi-storey residential buildings at the address Tyumen Melnikaite str. 2 building 1 Melnikaite str. 2 building 1 building 1 2 4 5 6 7 8 9" 1 Stage 1 of construction is a residential building with a built-in GP11 social and cultural center with a GP20 gas boiler house, two GP21 GP22 transformer substations and utility networks." at the address Tyumen region Tyumen Melnikaite street 2 building 1 Melnikaite street house 2 building 1 building 1 2 4 5 6 7 8 9
# 72160701091592
Unscheduled inspection
Start date: 2016-11-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 72160700950858
Unscheduled inspection
Start date: 2016-10-06, end date: 2016-10-13, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Proverka ustraneniya narushenii po predpisaniyu ot 09092016 101316c pri stroitelstve obekta kapitalnogo stroitelstvaProverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov pri stroitelstve obekta kapitalnogo stroitelstva «Mnogoetazhnye zhilye doma po adresu g Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite 2 korpus 1 stroenie 1 2 4 5 6 7 8 9» 1 ochered stroitelstva 2 etap ZHiloi dom po GP9» raspolozhennogo po adresu Tyumenskaya oblast g Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite dom 2 korpus 1 stroenie 1 2 4 5 6 7 8 9
# 72160700950819
Unscheduled inspection
Start date: 2016-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 72160601720051
Unscheduled inspection
Start date: 2016-08-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 72160700046454
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-09-19, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 28072016. Verification of compliance of work performed and building materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used in the construction of a capital construction facility "Multi-storey residential buildings houses at the address Tyumen Melnikaite St. 2 building 1 Melnikaite St. 2 building 1 building 1 2 4 5 6 7 8 9" 1 construction stage 5 Residential building on GP10 with a built-in underground parking lot GP101" located at the address Tyumen region Tyumen ul. Melnikaite 2 building 1 ul. Melnikaite house 2 building 1 building 1 2 4 5 6 7 8 9
# 72160601791638
Unscheduled inspection
Start date: 2016-08-12, end date: 2016-08-18, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Osuschestvlenie gosudarstvennogo stroitelnogo nadzora na osnovanii izvescheniya o srokah zaversheniya rabot podlezhaschih proverke pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva ot 19072016Proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov pri stroitelstve obekta kapitalnogo stroitelstva «Mnogoetazhnye zhilye doma po adresu g Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite 2 korpus 1 stroenie 1 2 4 5 6 7 8 9» 1 ochered stroitelstva 5 etap ZHiloi dom po GP10 so vstroenopristroennoi podzemnoi avtostoyankoi GP101» raspolozhennogo po adresu Tyumenskaya oblast g Tyumen ul Melnikaite 2 korpus 1 ul Melnikaite dom 2 korpus 1 stroenie 1 2 4 5 6 7 8 9
# 72160601720067
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-09-09, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 23062016 Verification of compliance of the work and the construction materials used in the construction process, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Multi-storey residential houses at the address Tyumen Melnikaite street 2 building 1 Melnikaite street 2 building 1 building 1 2 4 5 6 7 8 9" 1 construction phase 2 Residential building according to GP9" located at Tyumen region, Tyumen, Melnikaite str. 2 building 1 Melnikaite str. house 2 building 1 building 1 2 4 5 6 7 8 9