# 662101171346
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100592608
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662100240246
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662105300821
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-16, duration: 28
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-01/132-19 dated 11/06/2020; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Residential buildings (No. 2.1, 2.2 according to ROM) combined with a stylobate with a parking lot and built-in public facilities (No. 2.3 according to ROM), an integrated transformer substation (TP2 nov) located at the address: Sverdlovsk region, Yekaterinburg, Azina St., the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, including the requirements for energy efficiency (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; the availability of a construction permit; compliance with the requirements set out in parts 2, 3 and 3.1 of the Article 52 of the Urban Planning Code of the Russian Federation.
# 662004496159
Unscheduled inspection
Start date: 2020-08-21, end date: 2020-09-11, duration: 16
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29160150418 dated 20181130 Tasks implementation of regional state construction supervision Subject to verification of compliance with the performance of work and applicable building materials during the construction of a capital construction facility Multi-storey residential building on stylobate 1 on ROM with integrated commercial premises on the 1st and 1st floors and 12-level underground parking manege type in stylobate 1 stage of construction located on the address Sverdlovsk region Yekaterinburg, Omskaya Street, results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used. construction of meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 662004477500
Unscheduled inspection
Start date: 2020-07-29, end date: 2020-08-28, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor compliance with labor legislation and other acts containing labor law norms in respect of employees of Developmentinvest LLC in accordance with the instructions of Deputy Prime Minister of the Russian Federation TA Golikova dated 27122019 TG 12 instructions from the Head of the Federal Service for Labor and Employment Rostrud Ivankov of the Ministry of Justice dated 24012020 3P on conducting unscheduled inspections of compliance with the requirements labor legislation and other regulatory legal acts containing labor law norms
# 662004450205
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-08-07, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 291601206171 dated 2018/1203 Tasks implementation of regional state construction supervision Subject to verification of compliance of work and applicable building materials during the construction of a capital construction facility 1st stage of construction of a multifunctional residential complex multi-apartment 3-sectional apartment building with built-in public facilities on the 1st floor 11 according to ROM multi-apartment 3-sectional apartment building with built-in public facilities on the 1st floor 12 is a multi-family 3-section residential building with built-in public facilities on the 1st floor 13 is a built-in underground parking lot 14 is a ROM located at the address Sverdlovsk region Yekaterinburg Azina street site 11 of the results of such work according to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662004451700
Unscheduled inspection
Start date: 2020-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004318611
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004361651
Unscheduled inspection
Start date: 2020-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004342485
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-27, duration: 13
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29160153818 dated 2018/1221 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility A five-section variable-storey residential building with built-in non-residential premises 1 on ROM located at the address Sverdlovsk region Yekaterinburg within the boundaries of Kraulya Rabochy Krasnye Zor Lotsmanov streets the results of such work with the requirements of the approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code. the Code of the Russian Federation
# 662004354307
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-04-03, duration: 14
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29160150418 dated 20181130 Tasks implementation of regional state construction supervision Subject to verification of compliance with the performance of work and applicable building materials during the construction of a capital construction facility Multi-storey residential building on stylobate 1 on ROM with integrated commercial premises on the 1st and 1st floors and 12-level underground parking manege type in stylobate 1 stage of construction located on the address Sverdlovsk region Yekaterinburg, Omskaya Street, results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used. construction of meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 662004259641
Unscheduled inspection
Start date: 2020-02-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004226621
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661904033609
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program 29160150418 dated November 30, 2018. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Multi-storey residential building on stylobate 1 on ROM with integrated commercial premises on the 1st and 1st floors and manege-type 1-level underground parking in a stylobate 1st stage of construction" located at Omskaya St., Yekaterinburg, Sverdlovsk Region, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code Of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661903972169
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661903956053
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29160113219 dated May 20, 2019. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the conformity of work performed and building materials used during the construction of the capital construction facility "Residential buildings 21 22 on ROM combined with a stylobate with parking and built-in public facilities 23 on ROM integrated transformer substation TP2 nov" as well as the results of such work to the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in the event that the formation and maintenance of information The models are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, having a construction permit, meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation.
# 661903815697
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-01, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607634P1 dated August 16, 2019. The objectives of this audit are to carry out regional state construction supervision.7 The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607634P1 dated August 16, 2019
# 661903089345
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-18, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307147P dated July 05, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291307147P dated July 05, 2019.
# 661903313378
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902983135
Unscheduled inspection
Start date: 2019-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902912808
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-23, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307111 P dated June 07, 2019. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291307111 P dated June 07, 2019
# 661902826904
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902816245
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902831554
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607342P1 dated May 16, 2019. The objectives of this audit are to carry out regional state construction supervision.7 The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607342P1 dated May 16, 2019
# 661902857469
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902751515
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902802915
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902816231
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate identified violations of mandatory requirements 291607119P dated March 19, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate identified violations of mandatory requirements 291607119P dated March 19, 2019.
# 661902749307
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902717009
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902716959
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-05-31, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29130732 P dated April 02, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 29130732 P dated April 02, 2019.
# 661902717180
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program dated 21122018 29160153818. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of a capital construction facility "Five-section variable-storey residential building with built-in non-residential premises 1 on ROM" located at the address Sverdlovsk region Yekaterinburg within the boundaries of streets Kraulya Workers Krasny Zor Pilotmanov's results of such work, project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902687609
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29130720 P dated April 03, 2019. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29130720 P dated April 03, 2019 during the construction of a capital construction facility "Multi-storey Residential a house of variable storeys with built-in public facilities 1 on ROM with underground Parking 11 on ROM transformer substation 3 on ROM 1st stage of construction" located at the address Sverdlovsk region Yekaterinburg Akademika Postovskiy St.
# 661902637355
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-05-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: In order to implement the inspection program 291601206171 dated December 03, 2018, the objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "1st stage of construction of a multifunctional residential complex multi-apartment 3-section residential building with built-in public facilities on the 1st floor 11 ROM multi-apartment 3-section apartment building with built-in public facilities on the 1st floor 12 according to ROM multi-apartment 3-section apartment building with built-in public facilities on the 1st floor 13 according to ROM built-in underground Parking lot 14 according to ROM" located at the address Sverdlovsk region Yekaterinburg Azina St. site 11 of the results of such work requirements of the project documentation including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902653136
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the execution of a previously issued order to eliminate a detected violation of mandatory requirements 2917071P1 dated 08022019 Task is to carry out state construction supervision Subject to the fulfillment of a previously issued order to eliminate a detected violation of mandatory requirements 2917071P1 dated 08022019
# 661902597750
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program dated September 24, 2018 29160141318. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Stage 1, three sections of a residential building with variable storeys with built-in public premises, DDOU premises in sections 1B 1B 1A 1B 1B according to ROM from the Four-section residential building with built-in public facilities and underground parking" located at the address Sverdlovsk region Yekaterinburg Strelochnikov St. per Exit of the results of such work in the project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of facility equipment capital construction with metering devices for used energy resources , as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902679596
Unscheduled inspection
Start date: 2019-04-29, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902568642
Unscheduled inspection
Start date: 2019-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902584868
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902482573
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902523628
Unscheduled inspection
Start date: 2019-02-20, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902506119
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Implementation of the inspection program 291601318182 dated December 27, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "Three-section residential building with variable storeys with public facilities on the 1st floor 7 according to ROM 2 stage 2 construction phase" located at at the address Yekaterinburg, Sverdlovsk Region, in the area of the intersection of the Yekaterinburg Koltsovo Airport highway and the projected Slavyanskaya Street, the results of such work, project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and the implementation of requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902506024
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Implementation of the inspection program 291601221182 dated December 27, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Two-section residential building with variable storeys with public facilities on the 1st floor 6 according to ROM transformer substation 19 according to ROM 1 stage 2 construction queue" located at Yekaterinburg, Sverdlovsk region, near the intersection of the Yekaterinburg Koltsovo Airport highway and the projected Slavyanskaya Street, the results of such work, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of building permits and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902427496
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902432619
Unscheduled inspection
Start date: 2019-01-16, end date: 2019-01-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607861P1 dated December 03, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607861P1 dated December 03, 2018.
# 661902432560
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902452599
Unscheduled inspection
Start date: 2019-01-25, end date: 2019-02-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the 940085 inspection program dated January 22, 2018. The task is to carry out state construction supervision. The subject is to verify the conformity of work performed and building materials used in the construction of a capital construction facility "Multi-level parking with a multifunctional complex multi-storey residential building with built-in non-residential premises on the 1st floor 1 according to ROM 3-sectional residential building with variable storeys with built-in non-residential premises on 1st floor 2 according to ROM, a built-in two-level above-ground parking lot of a boxless type 3 according to ROM, a transformer substation 4 according to ROM" located at Novgorodtseva St., Yekaterinburg, Sverdlovsk region, the results of such work comply with building codes and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities
# 661902453793
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607659P2 dated October 01, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607659P2 dated October 01, 2018.
# 661802288192
Unscheduled inspection
Start date: 2018-12-13, end date: 2019-01-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this inspection is carried out on the basis of the notice of completion of the capital construction facility bx 52648 dated 05122018 in accordance with the inspection program, subparagraph "a" of paragraph 2 of part 5 of Article 54 of the Urban Planning Code of the Russian Federation, the objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the facility capital construction "Stage 2 construction of one section of an apartment building with built-in public facilities 1G on ROM and built-in underground parking 2A 2B on ROM from the Four-section residential building with built-in public facilities and underground parking" located at Yekaterinburg Strelochnikov St. per Exit of the results of such work to the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661801288206
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307376 dated July 20, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307376 dated July 20, 2018.
# 661800634745
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 2916012917 dated February 14, 2017. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "Four-section residential building 1A 1B 1B 1G on a variable-storey ROM with a built-in underground parking 2A 2B on ROM transformer substation 3 according to ROM 1 stage of construction three sections 1A 1B 1B according to ROM of a residential building of variable storeys with built-in public premises DDOU premises in sections 1B 1B and built-in underground parking in axes 4213AJ 2A according to ROM transformer substation 3 according to ROM 2 stage of construction one section of an apartment building with built-in public premises 1G according to ROM and built-in underground Parking in axes 141AE 2B on ROM" located at Yekaterinburg Strelochnikov St. per Exit of the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation
# 661800533886
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800517438
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800453554
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-07-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to review the received application from 24052018 bx 290101121051. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Four-section residential building 1A 1B 1B 1G on a variable-storey ROM with integrated underground parking 2A 2B on a transformer substation 3 according to ROM 1 stage of construction three sections 1A 1B 1B according to ROM of a residential building of variable storeys with built-in public premises DDOU premises in sections 1B 1B and built-in underground parking in axes 4213A 2A according to ROM transformer substation 3 according to ROM 2 stage of construction one section of an apartment building with built-in public premises 1G according to ROM and built-in underground Parking in axes 141AE 2B according to ROM" located at the address Sverdlovsk region Yekaterinburg Strelochnikov St. Exit of the results of such work to the requirements of technical regulations, sanitary and epidemiological rules and regulations, safety rules and state standards of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of permits for construction and fulfillment of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800168955
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-04-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 2916012917 dated February 14, 2017. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Four-section residential building 1A 1B 1B 1G on a variable-storey ROM with a built-in underground parking 2A 2B on ROM transformer substation 3 according to ROM 1 stage of construction three sections 1A 1B 1B according to ROM of a residential building of variable storeys with built-in public premises DDOU premises in sections 1B 1B and built-in underground parking in axes 4213A 2A according to ROM transformer substation 3 according to ROM 2 stage of construction one section of an apartment building with built-in public premises 1G according to ROM and built-in underground Parking in axes 141AE 2B on ROM" located at Yekaterinburg Strelochnikov St. per Exit of the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation
# 661800101515
Unscheduled inspection
Start date: 2018-02-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800013572
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605765P2 dated November 10, 2017. The objectives of this audit are the implementation of regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605765P2 dated November 10, 2017
# 66170802962250
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802161783
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605506P2 dated July 17, 2017. The objectives of this inspection are the implementation of regional state construction supervision
# 66170701810443
Unscheduled inspection
Start date: 2017-07-19, end date: —, duration: —
Authority: —
Purpose of inspection: