Found 1 inspection:

# 741902543402
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation installation of metal structures installation of a roof made of profiled sheet installation of internal partitions GKL installation of windows finishing work Verification of compliance with sanitary and epidemiological requirements and fire safety finishing work landscaping of the adjacent territory accessibility for MGN of the building materials used during the construction of the capital construction facility as well as the results of such work project documentation 2 Availability of a construction permit 3 Execution requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.