# 002000285521
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-01-25, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of: carrying out state construction supervision on the basis of the inspection program dated 04/14/2021.
The objectives of this audit are: prevention, detection and suppression of violations of urban planning legislation, including technical regulations, and design documentation during the construction of a capital construction facility, committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer.: "Construction of the water pipeline d630 mm with a length of 3.1 km", located at the address: Russian Federation, Tyumen region, Tyumen city district, Tyumen city.