Found 2 inspections:

# 661902682207
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program dated 11022019 2917013419 the task is to carry out regional state construction supervision the subject is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility with the results of such work, project documentation, including energy efficiency requirements with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources , as well as the availability of a building permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902617274
Unscheduled inspection
Start date: 2019-04-02, end date: 2019-04-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is being carried out in order to implement the inspection program dated February 11, 2019 2917013419 the objectives of this inspection are to carry out regional state construction supervision 7 The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Buildings and structures of the production base building of the production workshop II on ROM interlocked with the building office building I according to ROM and the block of the spraying and painting section of products the building of the gas boiler house 6 according to ROM the pavilion of the pumping station above the Artesian wells 3 according to ROM the block distribution substation 7 according to ROM fire fighting tanks 4 according to ROM local sewage treatment plants 8 according to ROM the cesspool 5 according to ROM" located at the address Sverdlovsk region Yekaterinburg Oktyabrsky district passage Kungursky the results of such work, project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.