# 742005214859
Unscheduled inspection
Start date: 2020-11-10, end date: 2020-12-07, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the Ru12mPa high-pressure gas pipeline from the installation site to the installation of PGB132VU1 and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802129660
Unscheduled inspection
Start date: 2018-11-21, end date: 2018-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the backfilling restoration of asphalt concrete pavement and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801876842
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the gas pipeline pipe and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801652209
Unscheduled inspection
Start date: 2018-09-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800630009
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-09-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800571962
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the underground gas pipeline Dn 225 160 mm along Severnaya St. from 1PK0+100 to 1PK5+250 of the gas pipeline Dn 63 mm Lesnaya St. from 1PK0+715 to 3PK2+685 earthworks laying of polyethylene pipe backfilling and the construction materials used during the construction of the capital construction facility, as well as the results of such work requirements technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800496299
Unscheduled inspection
Start date: 2018-07-05, end date: 2018-07-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying the gas pipeline along Severnaya Street 11PK011PK0+8460 on May 1 3PK0 9PK0 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 Art 52 of the Urban Planning Code of the Russian Federation
# 741800492158
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the underground gas pipeline DN 108 89 63 mm along Lenin Street from 7PK4+190 to 7PK0 even side of the underground gas pipeline DN 89 63 mm from 8PK3+240 to 1PK10+835 odd side earthworks laying of polyethylene pipe backfilling and the construction materials used during the construction of the capital construction facility as well as the results of such works to the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800471686
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-06-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the laying and backfilling of the gas pipeline along Pushkin Street Molodezhnaya Traktovaya Lane and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of paragraphs 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 741800417076
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the laying and backfilling of the gas pipeline along Gvardeyskaya Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170802911808
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an external underground-above-ground high-pressure gas distribution pipeline, the installation and strapping of PHB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802875000
Unscheduled inspection
Start date: 2017-11-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802825303
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802656629
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-11-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802326539
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of an underground high-pressure gas pipeline, the installation and strapping of the GRP and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802597188
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802567852
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the construction of a low-pressure gas pipeline, the installation of a GRPB, the purging of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701883275
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the construction site, the construction of a high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701805189
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the gas pipeline along Lugovaya Lenin St. Blucher St. from house 1 to house 21 Sovetskaya Dorozhnikov St. Komarov Blucher from house 39 1PK13+48 to 1PK16+81 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 The Urban Planning Code of the Russian Federation
# 74160701051018
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration: —
Authority: —