Found 6 inspections:

# 742100467336
Unscheduled inspection
Start date: 2021-08-19, end date: 2021-09-15, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction facility - Reconstruction of the production building: 1st stage - installation site of attachments. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100084960
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the internal and external sewerage system, water supply, electricity, internal ventilation system of the production building, compliance with fire and sanitary-epidemiological measures and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of the article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (except for with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742005282180
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on the installation of enclosing structures of walls, windows, gates, stained glass windows and building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005237372
Unscheduled inspection
Start date: 2020-11-26, end date: 2020-12-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of roof enclosing structures with compliance with fire and sanitary epidemiological measures and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with Parts 38 and 39 article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 The implementation of requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005179889
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001800094025
Unscheduled inspection
Start date: 2018-02-14, end date: 2018-02-15, duration:
Authority: Uralskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Assessment of the compliance of the activities carried out with the mandatory requirements of 102FZ dated 26062008 184FZ dated 27122002g in the execution of the instructions of the First Deputy Chairman of the Government of the Russian Federation ILYA Shuvalov dated 18122017 ISHP98445 verification of compliance with mandatory requirements in the field of state regulation of ensuring the uniformity of measurements for measurements units of quantities standard samples measuring instruments assessment of product compliance with the requirements of TR CU 0182011


Information about inspections