Found 139 inspections:

# 142101396301
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v svyazi s postupivshim v Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya) izvescheniem № 7 ot 15 noyabrya 2021 goda (vh.№ 8821 ot 16 noyabrya 2021 goda): a) sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; b) ustraneniya zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, vyyavlennyh pri provedenii stroitelnogo kontrolya i osuschestvlenii gosudarstvennogo stroitelnogo nadzora vseh narushenii sootvetstviya vypolnennyh rabot trebovaniyam normativnyh pravovyh aktov i proektnoi dokumentacii; v) oformleniya ispolnitelnoi dokumentacii, svyazannoi s vypolneniem vseh rabot po stroitelstvu, a takzhe primeneniem stroitelnyh materialov (izdelii);


# 142101367372
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 142101367470
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-13, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 26 marta 2021 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami


# 142101418849
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 9
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: 1) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2) availability of a construction permit; 3) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation. According to the inspection program


# 142100771297
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration:
Authority: Ministerstvo stroitelstva Respubliki Saha (YAkutiya)
Purpose of inspection:


# 142100859608
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-12, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 05 marta 2021 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami


# 142100859469
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 142100727645
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-10-05, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 03 marta 2021 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva;, zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii., soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami; sootvetstvie svedenii, soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti, obyazatelnym trebovaniyam; sootvetstvie svedenii, soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa, specialnogo razresheniya (licenzii) na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya (soglasovaniya) na osuschestvlenie inyh yuridicheski znachimyh deistvii, esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica, individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa, specialnogo razresheniya (licenzii), vydachi razresheniya (soglasovaniya) obyazatelnym trebovaniyam, a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah, soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic, edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah; vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya; provedenie meropriyatii: po predotvrascheniyu prichineniya vreda zhizni, zdorovyu grazhdan, vreda zhivotnym, rasteniyam, okruzhayuschei srede, obektam kulturnogo naslediya (pamyatnikam istorii i kultury) narodov Rossiiskoi Federacii, muzeinym predmetam i muzeinym kollekciyam, vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii, osobo cennym, v tom chisle unikalnym, dokumentam Arhivnogo fonda Rossiiskoi Federacii, dokumentam, imeyuschim osoboe istoricheskoe, nauchnoe, kulturnoe znachenie, vhodyaschim v sostav nacionalnogo bibliotechnogo fonda; po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; po obespecheniyu bezopasnosti gosudarstva; po likvidacii posledstvii prichineniya takogo vreda.


# 142100358767
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 142100319620
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: 3
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: 1) compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2) availability of a construction permit; 3) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 142100355924
Unscheduled inspection
Start date: 2021-07-20, end date: 2021-08-02, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 03 marta 2021 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva.., preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii;, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami;


# 142100296316
Unscheduled inspection
Start date: 2021-06-16, end date: —, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: 1) compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2) availability of a construction permit; 3) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 142100296397
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: 1) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2) availability of a construction permit; 3) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation. According to the inspection program


# 142100214945
Unscheduled inspection
Start date: 2021-05-19, end date: 2021-06-01, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: : proverki v svyazi s postupivshim v Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya) izvescheniem №6 ot 30 aprelya 2021 goda (vh.№2954 ot 30.04.2021g.) fakticheskogo ustraneniya pri stroitelstve obekta kapitalnogo stroitelstva vyyavlennyh ranee narushenii, predpisannyh k ustraneniyu predpisaniem № 04-08-1116-20 ot 17 dekabrya 2020 goda; , preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii., vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya;


# 142100190448
Unscheduled inspection
Start date: 2021-05-13, end date: 2021-05-26, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 23 dekabrya 2020 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii., soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami


# 142100190334
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: 1) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2) availability of a construction permit; 3) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation. According to the inspection program


# 142100190377
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration:
Authority:
Purpose of inspection:


# 142100242052
Unscheduled inspection
Start date: 2021-05-28, end date: 2021-06-25, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v svyazi s postupivshim v Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya) izvescheniem №7 ot 24 maya 2021 goda (vh.№3457 ot 24.05.2021g.): a) sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; b) ustraneniya zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, vyyavlennyh pri provedenii stroitelnogo kontrolya i osuschestvlenii gosudarstvennogo stroitelnogo nadzora vseh narushenii sootvetstviya vypolnennyh rabot trebovaniyam normativnyh pravovyh aktov i proektnoi dokumentacii; v) oformleniya ispolnitelnoi dokumentacii, svyazannoi s vypolneniem vseh rabot po stroitelstvu, a takzhe primeneniem stroitelnyh materialov (izdelii);, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami;


# 142100081517
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-31, duration: 5
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: Cel: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 08 aprelya 2019 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva; Zadachi: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii; Predmet: soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami


# 142100061881
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 142105311456
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-02-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu: proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya), 24 noyabrya 2020 g., soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov (izdelii), ustanovlennogo poryadka stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva;


# 142005265389
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: Predmet proverki nastoyaschaya proverka provoditsya s celyu proverki v sootvetstvii s programmoi proverok utverzhdennoi rukovoditelem Upravleniya gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya 08 aprelya 2019 g soblyudeniya pri stroitelstve obekta kapitalnogo stroitelstva zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo obyazatelnyh trebovanii v oblasti stroitelstva i primenyaemyh stroitelnyh materialov izdelii ustanovlennogo poryadka stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva 1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa Rossiiskoi Federacii proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa Rossiiskoi Federacii i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa Rossiiskoi Federacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 nalichie razresheniya na stroitelstvo 3 vypolnenie trebovanii ustanovlennyh chastyami 2 3 31 stati 52 Gradostroitelnogo Kodeksa Rossiiskoi Federacii


# 142005258142
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority:
Purpose of inspection:


# 142005254789
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration:
Authority:
Purpose of inspection:


# 142005257058
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 nalichie razresheniya na stroitelstvo3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF nalichie svidetelstva o dopuske k rabotam po stroitelstvu rekonstrukcii kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstva v tom chisle svidetelstva o dopuske k rabotam po organizacii stroitelstvo v sluchae privlecheniya zastroischikom ili tehnicheskim zakazchikom na osnovanii dogovora fizicheskogo ili yuridicheskogo lica


# 142005234698
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 142004664696
Unscheduled inspection
Start date: 2020-08-26, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 142004498729
Unscheduled inspection
Start date: 2020-08-21, end date: 2020-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 nalichie razresheniya na stroitelstvo3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF nalichie svidetelstva o dopuske k rabotam po stroitelstvu rekonstrukcii kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstva v tom chisle svidetelstva o dopuske k rabotam po organizacii stroitelstvo v sluchae privlecheniya zastroischikom ili tehnicheskim zakazchikom na osnovanii dogovora fizicheskogo ili yuridicheskogo lica


# 142004485640
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 nalichie razresheniya na stroitelstvo3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF nalichie svidetelstva o dopuske k rabotam po stroitelstvu rekonstrukcii kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstva v tom chisle svidetelstva o dopuske k rabotam po organizacii stroitelstvo v sluchae privlecheniya zastroischikom ili tehnicheskim zakazchikom na osnovanii dogovora fizicheskogo ili yuridicheskogo lica


# 142004512280
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration:
Authority:
Purpose of inspection:


# 142004457281
Unscheduled inspection
Start date: 2020-07-28, end date: 2020-08-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 142004425416
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-07-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including among the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 142004429148
Unscheduled inspection
Start date: 2020-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 142004427786
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-06-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 142004322371
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141904080790
Unscheduled inspection
Start date: 2019-12-11, end date: 2020-01-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141904102566
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 141903935530
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141904028569
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 141903955766
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya Po programme proverok 1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 nalichie razresheniya na stroitelstvo 3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF


# 141903299226
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-09-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141903553908
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-10-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141903553903
Unscheduled inspection
Start date: 2019-09-18, end date: —, duration:
Authority:
Purpose of inspection:


# 141903607760
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki soblyudeniya licami osuschestvlyayuschimi privlechenie denezhnyh sredstv grazhdan dlya stroitelstva mnogokvartirnogo zhilogo doma «Mnogokvartirnye zhilye doma s ofisnymi pomescheniyami po ul Avtodorozhnaya v kvartale 68 g YAkutska poz 7A 7B 7V» obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom ob uchastii v dolevom stroitelstve na osnovanii obrascheniya ot 04092019 vh 3380 Ministerstva stroitelstva i zhilischnokommunalnogo hozyaistva Rossiiskoi FederaciiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikami licami osuschestvlyayuschimi privlechenie denezhnyh sredstv uchastnikov dolevogo stroitelstva dlya stroitelstva mnogokvartirnyh domov i ili inyh obektov nedvizhimosti narushenii trebovanii ustanovlennyh zakonodatelstvom ob uchastii v dolevom stroitelstvePredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie licami privlekayuschimi denezhnye sredstva grazhdan dlya stroitelstva mnogokvartirnyh domov i inyh obektov nedvizhimosti obyazatelnyh trebovanii ustanovlennyh Federalnym zakonom ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» i prinyatymi v sootvetstvii s nim inymi normativnymi pravovymi aktami Rossiiskoi Federacii v tom chisle provedenie meropriyatii po kontrolyu za soblyudeniem zastroischikom stati 3 Federalnogo zakona ot 27062019 153FZ O priznanii utrativshimi silu otdelnyh polozhenii stati 25 Federalnogo zakona O publichnopravovoi kompanii po zaschite prav grazhdan uchastnikov dolevogo stroitelstva pri nesostoyatelnosti bankrotstve zastroischikov i o vnesenii izmenenii v otdelnye zakonodatelnye akty Rossiiskoi Federacii i vnesenii izmeneniya v statyu 62 Federalnogo zakona O gosudarstvennoi registracii nedvizhimosti


# 141903610301
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141903005587
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-09-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141902933479
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141902933455
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 141902942480
Unscheduled inspection
Start date: 2019-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 141904112556
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-09-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: Nastoyaschaya vneplanovaya dokumentarnaya proverka provedena v otnoshenii yuridicheskogo lica OOO «Prometei» osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva obekta «Mnogokvartirnye zhilye doma s ofisnymi pomescheniyami po ul Avtodorozhnaya v kvartale 68 g YAkutska poz 7A 7B 7V» na predmet ispolneniya ranee vydannogo predpisaniya ot 17072019 050426 ob ustranenii narushenii vyyavlennyh v hode proverki ot 17072019 050426 Akt proverki provedennoi na osnovanii prikaza Upravleniya ot 17062019 011036


# 141903709837
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-09-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki fakticheskogo ustraneniya narushenii vyyavlennyh v processe provedeniya vneplanovoi dokumentarnoi proverki Akt proverki ot 17072019 050426 na osnovanii prikaza ot 17062019 011036 predpisannyh k ustraneniyu predpisaniem ot 17072019 050426 po obektu «Mnogokvartirnye zhilye doma s ofisnymi pomescheniyami po ul Avtodorozhnaya v kvartale 68 g YAkutska poz 7A7B7V»Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikami licami osuschestvlyayuschimi privlechenie denezhnyh sredstv uchastnikov dolevogo stroitelstva dlya stroitelstva mnogokvartirnyh domov i ili inyh obektov nedvizhimosti narushenii trebovanii ustanovlennyh zakonodatelstvom ob uchastii v dolevom stroitelstvePredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie licami privlekayuschimi denezhnye sredstva grazhdan dlya stroitelstva mnogokvartirnyh domov i inyh obektov nedvizhimosti obyazatelnyh trebovanii ustanovlennyh Federalnym zakonom ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» i prinyatymi v sootvetstvii s nim inymi normativnymi pravovymi aktami Rossiiskoi Federacii


# 141903014220
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-09-06, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya Po programme proverok 1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 nalichie razresheniya na stroitelstvo 3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF


# 141902863940
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya Po programme proverok 1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 nalichie razresheniya na stroitelstvo 3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF


# 141902891363
Unscheduled inspection
Start date: 2019-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 141902892809
Unscheduled inspection
Start date: 2019-06-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902811246
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: proverki v svyazi s postupivshim v Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya izvescheniem 3 ot 14 iyunya 2019 goda vh 5435 ot 14 iyunya 2019 goda fakticheskogo ustraneniya pri stroitelstve obekta kapitalnogo stroitelstva vyyavlennyh ranee narushenii predpisannyh k ustraneniyu predpisaniem 040822419 ot 15 maya 2019 goda zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 141902811257
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on April 16, 2019, compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for the construction and reconstruction of the capital construction facility during construction by the developer, the technical customer, the person carrying out the construction, the established procedure for the construction and reconstruction of the capital construction facility. The objectives of this inspection are to prevent, identify and prevent violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 141902861552
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902861203
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration:
Authority:
Purpose of inspection:


# 141902802719
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902738251
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141902644684
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya Po programme proverok 1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 nalichie razresheniya na stroitelstvo 3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF


# 141902701131
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902678474
Unscheduled inspection
Start date: 2019-04-26, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141902644695
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141902597309
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141902557478
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-04-01, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: proverka fakticheskogo ustraneniya narushenii predpisannyh k ustraneniyu ranee vydannogo predpisaniya kontroliruyuschego organa


# 141902504017
Unscheduled inspection
Start date: 2019-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 141802297335
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141802163511
Unscheduled inspection
Start date: 2018-11-30, end date: 2018-12-05, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141801980476
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141801980603
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141801905518
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141801899868
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141801379869
Unscheduled inspection
Start date: 2018-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 141801185905
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-09-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141801512991
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-10-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141800675088
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-08-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor 1 compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 the availability of a construction permit 3 the fulfillment of the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the prescription and notification of elimination


# 141800526202
Unscheduled inspection
Start date: 2018-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 141800683824
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 nalichiya razresheniya na stroitelstvo 3 vypolneniya trebovanii ustanovlennyh chastyami 2 3 31 6 stati 52 Gradostroitelnogo Kodeksa Rossiiskoi Federacii 4 po programme provedeniya proverok


# 141800560379
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 proverka fakticheskogo ustraneniya pri stroitelstve obekta kapitalnogo stroitelstva vyyavlennyh ranee narushenii predpisannyh k ustraneniyu predpisaniem N 040835018 ot 24 maya 2018 goda 2 sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 3 nalichiya razresheniya na stroitelstvo 4 vypolneniya trebovanii ustanovlennyh chastyami 2 3 31 6 stati 52 Gradostroitelnogo Kodeksa Rossiiskoi Federacii


# 141800502582
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 141800564964
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-08-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141800564941
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14180803166026
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vyyavleniya i ustraneniya narushenii obyazatelnyh trebovanii zhilischnogo zakonodatelstva po faktam izlozhennym v obraschenii vh8647 ot 18062018 na osnovanii predstavleniya ot 19062018 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii zhilischnogo zakonodatelstva Soblyudenie obyazatelnyh trebovanii k poryadku i usloviyam zaklyucheniya dogovorov upravleniya mnogokvartirnymi domami i inyh dogovorov obespechivayuschih upravlenie mnogokvartirnym domom v tom chisle soderzhanie i remont obschego imuschestva v mnogokvartirnom dome dogovorov soderzhaschih usloviya predostavleniya kommunalnyh uslug i dogovorov ob ispolzovanii obschego imuschestva sobstvennikov pomeschenii v mnogokvartirnom dome


# 141800487504
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The subject of the audit is checking the completed capital construction facility for a compliance of the constructed capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation b elimination by the developer by the technical customer by the person carrying out the construction of all violations of compliance of the completed works with the requirements of technical regulations norms and rules of other regulatory legal acts acts and project documentation in the execution of executive documentation related to the performance of all construction work as well as the use of building materials and products 4 Upon receipt of notification of completed construction dates


# 141800437973
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The subject of the audit is checking the completed capital construction facility for a compliance of the constructed capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation b elimination by the developer by the technical customer by the person carrying out the construction of all violations of compliance of the completed works with the requirements of technical regulations norms and rules of other regulatory legal acts acts and project documentation in the execution of executive documentation related to the performance of all construction work as well as the use of building materials and products 4 Upon receipt of notification of completed construction dates


# 141800372620
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141800301112
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-04-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141800297117
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141800227581
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141800227819
Unscheduled inspection
Start date: 2018-03-28, end date: 2018-04-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14180803051986
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya1 proverka fakticheskogo ustraneniya pri stroitelstve obekta kapitalnogo stroitelstva vyyavlennyh ranee narushenii predpisannyh k ustraneniyu predpisaniem N 0408149317 ot 06 dekabrya 2017 goda2 sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov3 nalichiya razresheniya na stroitelstvo4 vypolneniya trebovanii ustanovlennyh chastyami 2 3 31 6 stati 52 Gradostroitelnogo Kodeksa Rossiiskoi Federacii


# 14170802924546
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802921953
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802978626
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170802906090
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170802698583
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802775447
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-10-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802618706
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170802741108
Unscheduled inspection
Start date: 2017-10-13, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170802698427
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802698373
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802698471
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701837809
Unscheduled inspection
Start date: 2017-08-11, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701852624
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701816785
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701787018
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701787003
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701852657
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701852653
Unscheduled inspection
Start date: 2017-07-25, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701727629
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-07-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 Verification of the completed construction of the object


# 14170701686511
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-06-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701622511
Unscheduled inspection
Start date: 2017-05-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701626897
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: chast 5 stati 54 Gradostroitelnogo kodeksa RF statya 10 Federalnogo zakona ot 26122008 294FZ «O zaschite prav yuridicheskih lic i individualnyh predprinimatelei pri osuschestvlenii gosudarstvennogo kontrolya nadzora i municipalnogo kontrolya» punkt 11 Polozheniya ob osuschestvlenii gosudarstvennogo stroitelnogo nadzora v Rossiiskoi Federacii utverzhdennogo Postanovleniem Pravitelstva RF ot 01022006 g 54 punkt 3 Prikaza Rostehnadzora ot 26122006 1129 «Ob utverzhdenii i vvedenii v deistvie Poryadka provedeniya proverok pri osuschestvlenii gosudarstvennogo stroitelnogo nadzora i vydachi zaklyuchenii o sootvetstvii postroennyh rekonstruirovannyh otremontirovannyh obektov kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov norm i pravil inyh normativnyh pravovyh aktov proektnoi dokumentacii» RD11042006zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii


# 14170701660017
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701629179
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the inspection program


# 14170701478976
Unscheduled inspection
Start date: 2017-03-28, end date: 2017-03-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the order


# 14170701389903
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-03-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701403392
Unscheduled inspection
Start date: 2017-02-27, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701293762
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, and the person carrying out construction on the basis of a contract with the developer or customer, hereinafter referred to as the contractor. The subject of this audit is the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the inspection program


# 14160701221524
Unscheduled inspection
Start date: 2016-11-10, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14160701221488
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160701221600
Unscheduled inspection
Start date: 2016-11-09, end date: 2016-11-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160701221598
Unscheduled inspection
Start date: 2016-11-09, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14160701221572
Unscheduled inspection
Start date: 2016-11-09, end date: 2016-11-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160701221548
Unscheduled inspection
Start date: 2016-11-09, end date: —, duration:
Authority:
Purpose of inspection:


# 14160701069310
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160700816101
Unscheduled inspection
Start date: 2016-09-23, end date: 2016-09-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160700816100
Unscheduled inspection
Start date: 2016-09-23, end date: 2016-09-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160700091739
Unscheduled inspection
Start date: 2016-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 14160700091737
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160700408648
Unscheduled inspection
Start date: 2016-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 14160601746444
Unscheduled inspection
Start date: 2016-08-05, end date: —, duration:
Authority:
Purpose of inspection:


# 14160601730116
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-08-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160601730115
Unscheduled inspection
Start date: 2016-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 14160601717275
Unscheduled inspection
Start date: 2016-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 14160601717338
Unscheduled inspection
Start date: 2016-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 14160601705227
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.