# 74170802925599
Unscheduled inspection
Start date: 2017-12-06, end date: 2017-12-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of site preparation work, trench construction, pipeline installation, backfilling, preparation of tie-in sites during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation