Found 7 inspections:

# 742004344650
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of enclosing structures of the entrance group of the roof fence, the stylobate and the high-rise part after the actual completion of work installation of elevator equipment landscaping compliance with fire and sanitary epidemiological measures requirements for energy efficiency of enclosing structures measures to ensure access for low-mobility groups of the population after the actual completion of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including the requirements energy efficiency, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903623416
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of enclosing structures of the first and second stages of construction after the actual completion of work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800850133
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the cladding of exterior walls with a frame made of thermal profiles in HPL panels, the cladding of the parapet of the roof of outbuildings with granite according to the HILTI aluminum subsystem, the internal cladding of the enclosing structures during the work and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 The implementation of requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800616481
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 741800513111
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the translucent SCHUKO system Stained glass window B8 axis 912 row A from the 3rd to the 17th floors during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741800408519
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of water supply and sanitation systems, electricity supply, work on the interior cladding of enclosing structures during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800291133
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of heating and ventilation systems for the interior cladding of enclosing structures during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.