# 742004475185
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of the building frame, external and internal enclosing structures during the production process and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The presence of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902885087
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-09-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation dated June 07, 20192 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902692228
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701820420
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-08-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Execution of the order of the Deputy Governor of the Chelyabinsk region, Shal SV, adopted on 13072017 at a joint meeting of the working group on monitoring the situation in the field of housing construction, carried out with the involvement of funds from shareholders to verify compliance with urban planning legislation during the construction of the capital construction facility "Complex of residential buildings with built-in public facilities and underground parking Residential buildings 32 33" project code 089001323332520 including the execution of project documentation and SNIP 12032001 "Occupational safety in construction Part 1 General requirements" minutes of the meeting dated 13072017 memo dated 13072017 2 Identification and suppression of violations of urban planning legislation3 Compliance with mandatory requirements or requirements established by municipal legal acts4 To prevent harm to the life and health of citizens, harm to animals, plants, the environment