# 00160601796496
Unscheduled inspection
Start date: 2016-08-17, end date: 2016-08-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and equipment requirements for capital construction facilities with metering devices for energy resources used based on the notice received by the Inspectorate from 05082016 6619 on the completion dates that are subject to verification At the capital construction facility, the objectives of this audit are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The purpose of this audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 162100240541
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the Inspection notification dated 05/24/2021 No. 4992 on the elimination of violations during construction, reconstruction of the capital construction facility, which was ordered to eliminate within the period established by the regulation dated 05/21/2021 №12-12/0429-01, until 06/10/2021.
The objectives of this audit are:
prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.
The subject of this audit is (to select the appropriate one):
☑ compliance with the regulations of state control (supervision) bodies, municipal control bodies;
# 162100243914
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100197132
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the Inspection's notice dated 04/26/2021 No. 4031 on the completion of the construction of the capital construction facility.
The objectives of this audit are:
prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.
The subject of this audit is (to select the appropriate one):
☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 162100086258
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-23, duration: 15
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the notice received by the Inspectorate dated 03/19/2021 No. 2480 on the completion of the construction of the capital construction facility.
The objectives of this audit are:
prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.
The subject of this audit is (to select the appropriate one):
☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 162004426274
Unscheduled inspection
Start date: 2020-06-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004369151
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-03-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 13032020 2536 on the elimination of violations during the construction and reconstruction of a capital construction facility that were ordered to be eliminated within the time limit set by the regulation from 27022020 1712003801 to 27032020 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 162004352850
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004352817
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004305905
Unscheduled inspection
Start date: 2020-02-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004192120
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004232331
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 03/122019 case 171120170026 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004192141
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility dated 13122019 12974, the objectives of this audit are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 162004188194
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161904072390
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 02/122019 12301the objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of the work performed during the construction of the capital construction facility technical regulations, other regulatory legal acts and project documentationthe subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161904004670
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903936521
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903479473
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161903319853
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902906392
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902898579
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-01, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility dated 15072019 6002the objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161902773335
Unscheduled inspection
Start date: 2019-06-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902768656
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility dated 28052019 4333, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the work performed during the construction of the capital construction facility technical regulations, other regulatory legal acts and project documentation The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161902730748
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902613275
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902680554
Unscheduled inspection
Start date: 2019-04-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902443720
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-01-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: To establish that this inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation. In accordance with the inspection program dated 06072018 case 171120170026, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. requirements established by municipal legal acts
# 161802081710
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-11-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used during the construction of the capital construction facility and the results of such work comply with the requirements of the design documentation. The objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of the design documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161802081542
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection by notification dated 02112018 8380 on the completion of the construction of the capital construction facility, the prevention as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements and or requirements established by municipal legal acts. acts
# 161802056282
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-11-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received by notification dated 29102018 8160 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is to select necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161801948630
Unscheduled inspection
Start date: 2018-10-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161801607675
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-09-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 12092018 6605 The objectives of this inspection are to prevent, identify and suppress violations of compliance committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the capital construction facility The subject of this audit is to select the required compliance with the mandatory requirements and or requirements established by municipal legal acts.
# 161801585461
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-09-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 14092018 6667 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 29082018 1219082001 to 20092018 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to select the necessary compliance with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 161800669715
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-08-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 16082018 5794, the objectives of this inspection are to prevent, identify and suppress violations of compliance committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the capital construction facility The subject of this audit is to select the required compliance with the mandatory requirements and or requirements established by municipal legal acts.
# 161800638552
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program inspections dated 28062018 case 121120180057the objectives of this audit are to prevent, identify and prevent violations of compliance with regulatory legal acts and project documentation performed during the construction of a capital construction facility by the developer, customer, or person carrying out construction on the basis of a contract with the developer or customer. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800638474
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received by notification dated 07082018 5527 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or the requirements established by municipal legal acts
# 161800524967
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161800404453
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 21052018 case 121120170082, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800487163
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 05072017 case 171120170026, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. 7 The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800417542
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-05-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in accordance with with the notice of 18052018 3417 received by the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800355089
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in accordance with with the notice received by the Inspectorate dated 23042018 2750 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800394672
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in accordance with with the notice received by the Inspectorate dated 17052018 3387 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out the construction on the basis of a contract with the developer or the customer, violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. It is necessary to choose the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800272860
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 01/122017 case 121120170053, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this inspection is compliance with mandatory requirements and or requirements the requirements of technical regulations, other regulatory legal acts and project documentation established by municipal legal acts
# 161800069580
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 29/122017 1919039401, the deadline for which expired on 01022018, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 161800094829
Unscheduled inspection
Start date: 2018-02-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16180803061853
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16180803061792
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16180803037869
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the fact of execution of the order dated 19102017 1219119301, which expired in 20122017, and to draw up an act based on the results of the check.
# 161800012996
Unscheduled inspection
Start date: 2018-01-24, end date: 2018-01-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 12.012018 190 The objectives of this inspection are to prevent as well as identify and suppress violations of compliance committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170803036576
Unscheduled inspection
Start date: 2017-12-29, end date: 2017-12-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in accordance with with the notice received by the Inspectorate dated 22122017 10836 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170802803636
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170802633646
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the real test is conducted to determine compliance of the performed works applied building materials in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of objects of capital construction of metering devices of energy resources used during the completion phase, and with the aim of drawing up an inspection of the completed project in accordance with the received Inspection notice from 19092017 7484 about the completion of the reconstruction of the object of capital stroitelstva this check avaudioplayer as well as detection and suppression approved developer customer entity engaged in construction on the basis of an agreement with the developer or the customer breaches of compliance taken during construction of the facility works with the requirements of technical regulations of other regulatory legal acts and project documentlibraries of this review is to select the compliance with mandatory requirements and / or requirements of the municipal legal acts according to the information contained in the notice of initiation of certain types of entrepreneurial activities with the mandatory requirements of conformity of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special license permit authorization coordination mandatory requirements as well as data about the specified legal entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual
# 16170802754969
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of the fulfillment of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 11102017 8240
# 16170802725623
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out within the framework of the regional state construction supervision the registration number of the function in the federal state information system "Federal Register of State and Municipal Services of Functions" 1600000000160066730 Establish that this inspection is carried out in order to determine the compliance of the performed works of the applied building materials during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements of energy efficiency the effectiveness and requirements of equipping capital construction facilities with metering devices for used energy resources at the completion stage, as well as for the purpose of drawing up an inspection report on the completed construction of the facility in accordance with the Inspection notice dated 29092017 7892 on the completion of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent the construction carried out by the developer, the customer, and the person carrying out the construction on the basis of a contract with by the developer or the customer of violations of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170802719238
Unscheduled inspection
Start date: 2017-10-13, end date: 2017-10-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 05072017 case 171120170026, the tasks of this inspection are to prevent, identify and prevent violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, as well as mandatory requirements and or requirements established by municipal legal acts committed by the developer, the customer or the person carrying out construction on the basis of a contract with the developer or the customer
# 16170802781628
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-10-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the real test is conducted to determine whether execution of a precept from 25092017 1219110401 the deadline has expired 23102017 and act on the results of propertization of this review are prevention and detection and suppression approved developer customer entity engaged in construction on the basis of an agreement with the developer or the customer breaches of conformity in the process of construction of the facility works with the requirements of technical regulations of other regulatory legal acts and project documentlibraries of this review is to select the compliance with mandatory requirements and / or requirements of the municipal legal acts according to the information contained in the notice of initiation of certain types of entrepreneurial activities with the mandatory requirements of conformity of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval of the mandatory requirements as well as data about the specified legal entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual entrepreneurs and other Federal information resources the provisions of state control of the oversight bodies, municipal control activities for the prevention of harm to life, health of citizens of harm to animals to plants to the environment the cultural heritage monuments of history and culture of the peoples of the Russian Federation Museum objects and Museum collections included in the Museum Fund of the Russian Federation particularly valuable including the unique
# 16170802411455
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170801948324
Unscheduled inspection
Start date: 2017-09-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170801933119
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the real test is conducted to determine compliance of the performed works used in the process of construction, reconstruction of capital construction building materials of the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of objects of capital construction of metering devices of energy resources to the presence of the building permit requirements of parts 2 and 3 of article 52 of the town planning Code of the Russian Federation in accordance with the programme of inspections from 10082017 case 121120170089Задачами this check avaudioplayer as well as detection and suppression approved developer customer entity engaged in construction on the basis of an agreement with the developer or the customer breaches of conformity in the process of construction of object of capital construction work requirements technical regulations other regulations and design documentlibraries of this review is to select the compliance with mandatory requirements and / or requirements of the municipal legal acts according to the information contained in the notice of initiation of certain types of entrepreneurial activities with the mandatory requirements of conformity of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval of the mandatory requirements as well as data about the legal the entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual entrepreneurs and other Federal information resources containing
# 16170801931825
Unscheduled inspection
Start date: 2017-09-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170802489704
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the real test is conducted to determine compliance of the performed works used in the process of construction, reconstruction of capital construction building materials of the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of objects of capital construction of metering devices of energy resources to the presence of the building permit requirements of parts 2 and 3 of article 52 of the town planning Code of the Russian Federation in accordance with the programme of inspections from 10082017 case 121120170088Задачами this check avaudioplayer as well as detection and suppression approved developer customer entity engaged in construction on the basis of an agreement with the developer or the customer breaches of conformity in the process of construction of object of capital construction work requirements technical regulations other regulations and design documentlibraries of this review is to select the compliance with mandatory requirements and / or requirements of the municipal legal acts according to the information contained in the notice of initiation of certain types of entrepreneurial activities with the mandatory requirements of conformity of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval of the mandatory requirements as well as data about the legal the entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual entrepreneurs and other Federal information resources containing
# 16170801911660
Unscheduled inspection
Start date: 2017-08-18, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701905675
Unscheduled inspection
Start date: 2017-08-18, end date: 2017-08-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in in accordance with the Inspection notification dated 15082017 6448 on the completion of construction and reconstruction at the capital construction facility, the tasks of this inspection are to prevent, as well as identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this The purpose of the audit is to ensure compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170701905380
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: 5 the Real test is carried out in the framework of the Implementation of Federal state supervision over compliance with requirements aimed at implementing the rights of workers to receive coverage for compulsory social insurance against accidents at work and occupational diseases as well as the appointment procedure of calculation and payment of temporary disability benefits at the expense of employers 10001244859 the implementation of Federal state supervision over compliance with labor legislation and other regulatory legal acts containing norms of labor law 10001244260 the Implementation of Federal state supervision over observance of the established procedure of investigation and accounting of accidents on production 10001244349наименование kinds of types of state control of the supervision of the municipal rejestrowy control room functions in the Federal state information system Federal register of state and municipal services функций6 to Establish what the real test is conducted for the purpose of reviewing memos from 15082017 When establishing goals of testing indicate the following information in the event of a scheduled review, a link to the approved annual plan of scheduled inspections details of the test sheet checklist if the routine inspection should be used checklist a list of control voprosov in the case of an unscheduled inspection of the details of the previously issued check to the face of orders to eliminate violations of the period of time for performance has expired, the details of the application from a legal entity or an individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or permit approval on the exercise of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval details received by the authorities of the States
# 16170701850496
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility. in accordance with the notice received by the Inspectorate dated 27072017 5931 on the completion of construction and reconstruction at the capital construction facility, the tasks of this inspection are to prevent, as well as identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this The purpose of the audit is to select the required compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170701867247
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-08-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the real test is conducted to determine compliance of the performed works used in the process of construction, reconstruction of capital construction building materials of the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of objects of capital construction of metering devices of energy resources to the presence of the building permit requirements of parts 2 and 3 of article 52 of the town planning Code of the Russian Federation in accordance with the programme of inspections from 05042016 case 121120150040Задачами this check avaudioplayer as well as detection and suppression approved developer customer entity engaged in construction on the basis of an agreement with the developer or the customer breaches of conformity in the process of construction of object of capital construction work requirements technical regulations other regulations and design documentlibraries of this review is to select the compliance with mandatory requirements and / or requirements of the municipal legal acts according to the information contained in the notice of initiation of certain types of entrepreneurial activities with the mandatory requirements of conformity of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval of the mandatory requirements as well as data about the legal the entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual entrepreneurs and other Federal information resources containing
# 16170701802006
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701778825
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701754473
Unscheduled inspection
Start date: 2017-07-05, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701819514
Unscheduled inspection
Start date: 2017-07-21, end date: 2017-07-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of the fulfillment of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the reconstruction of the capital construction facility dated 13072017 5571
# 16170701813773
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. according to the inspection program dated 26062017 case 121120170009
# 16170701648916
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program from 05042016 case 121120150040the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements
# 16170701739891
Unscheduled inspection
Start date: 2017-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701640384
Unscheduled inspection
Start date: 2017-06-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701736202
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-06-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. according to the inspection program from 05052017 case 121120170053
# 16170701736156
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701656794
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701612395
Unscheduled inspection
Start date: 2017-05-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701602693
Unscheduled inspection
Start date: 2017-05-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701596828
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 28042017 3265 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 26.012017 121900-5301 to 27042017
# 16170701580938
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction from 03022017 1919000501, the deadline for which expires 30042017, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, as well as to identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory legal acts performed during the construction of a capital construction facility. acts and project documentation
# 16170701570981
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 16022017 1719002201, the deadline for which expired 28042017, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, as well as identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory legal acts performed during the construction of a capital construction facility. acts and project documentation6 The subject of this audit is the fulfillment of Inspection regulations
# 16170701462809
Unscheduled inspection
Start date: 2017-03-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701344969
Unscheduled inspection
Start date: 2017-02-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701418413
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-02-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: prevention, as well as detection and suppression of violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer
# 16170701349582
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-02-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: compliance with mandatory requirements prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility
# 16170701343366
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701330346
Unscheduled inspection
Start date: 2017-01-26, end date: 2017-01-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the reconstruction of the capital construction facility dated 16012017 268the objectives of this inspection are to prevent as well as identify and suppress violations of conformity committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the facility capital construction works according to the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this audit is compliance with mandatory requirements
# 16170701318411
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-01-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements
# 16170701316362
Unscheduled inspection
Start date: 2017-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160701230653
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the reconstruction of the capital construction facility from 30112016 10763 warning, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance violations performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements, compliance with Inspection regulations, measures to prevent harm to the life and health of citizens, harm to animal plants, the environment, measures to prevent natural and man-made emergencies, measures to ensure state security, measures to eliminate the consequences of harm to the life and health of citizens, harm to animal plants compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements
# 16160701156272
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an inspection report on the completed construction of the facility. in accordance with the notice received by the Inspectorate dated 18112016 10276 on the completion of construction reconstruction at the capital construction facility
# 16160701232457
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility. in accordance with the notice received by the Inspectorate dated 07/122016 11047 on the completion of construction reconstruction at the capital construction facility, the prevention as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements
# 16160701222578
Unscheduled inspection
Start date: 2016-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160701195586
Unscheduled inspection
Start date: 2016-12-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16160701222524
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility. in accordance with the notice received by the Inspectorate dated 02/122016 10881 on the completion of construction and reconstruction at the capital construction facility, the prevention as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements
# 16160701222574
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used, based on the notice received by the Inspectorate dated 29112016 10698 on the completion dates that are subject to verification at the capital construction facility, prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation and compliance with mandatory requirements
# 16160701242314
Unscheduled inspection
Start date: 2016-12-27, end date: 2016-12-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the reconstruction of the capital construction facility from 30112016 10766 warning, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance violations performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentationcompliance with mandatory requirements
# 16160701157272
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in in accordance with the notice received by the Inspectorate dated 18112016 10272 on the completion of construction reconstruction at the capital construction facility, the prevention as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility is to select necessary compliance with mandatory requirements, compliance with Inspection regulations, measures to prevent harm to the life and health of citizens, harm to animal plants, the environment, measures to prevent natural and man-made emergencies, measures to ensure state security, measures to eliminate the consequences of harm to the life and health of citizens, harm to animal plants, the environment, compliance with the information contained in the notification of the start implementation of certain types of business activities required by the requirements
# 16160701152300
Unscheduled inspection
Start date: 2016-12-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: