Found 67 inspections:

# 162100362682
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162100362503
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction, reconstruction of an object of capital construction of building materials, the results of such works with the requirements of project documentation, including requirements of energy efficiency and requirements of equipment of objects of capital construction with devices of accounting of the used energy resources; verification of availability of the building permit, fulfillment of requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04/14/2021, case no. PP1-15-04-2021/0009 ; prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility.


# 162100237013
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 162004408301
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 04022020 case 150420190027 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161903830604
Unscheduled inspection
Start date: 2019-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 161903256880
Unscheduled inspection
Start date: 2019-09-11, end date: 2019-09-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 24072019 case 131120180041the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities. legal acts


# 161903511360
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 161903246836
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration:
Authority:
Purpose of inspection:


# 161902929143
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for used energy resources verification of the construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29072019 case 150420190027 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility


# 631902934894
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-08-13, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631902934876
Unscheduled inspection
Start date: 2019-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 161903003487
Unscheduled inspection
Start date: 2019-08-28, end date: 2019-09-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19042019 case 121120190048the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 631902872729
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-31, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Implementation of the previously issued regulation 01050801441 dated 28022019


# 631902816744
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 161902887232
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-07-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19042019 case 121120190048the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902887192
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-07-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of compliance with the instruction dated 27062019 1212066401, the deadline for which expired on 15072019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentationthe subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies, supervision bodies of municipal control


# 161902773046
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 24052019 case 150420190001 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility


# 161902811619
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902741615
Unscheduled inspection
Start date: 2019-05-31, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902689324
Unscheduled inspection
Start date: 2019-05-14, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902680081
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 161902642090
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for used energy resources verification of the construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 16.012019 case 150420190001 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility


# 161902675186
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 16042019 3158 11042019 3029 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation dated 01042019 1212029101 01042019 1212029102 to 26042019


# 161902545762
Unscheduled inspection
Start date: 2019-03-05, end date: —, duration:
Authority:
Purpose of inspection:


# 161902598508
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 741902586997
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of external power supply networks during the work, Commissioning after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 161902499312
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility


# 161902515122
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 631902519934
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 161902481373
Unscheduled inspection
Start date: 2019-02-06, end date: 2019-02-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of capital construction facilities with metering devices for energy resources used checking the availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation prevention as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 161902475968
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of the design documentation of other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of the notice received by the Inspectorate dated 24.012019 513 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time period established by the regulation from 03/122018 1219119702 to 28.012019


# 741902465856
Unscheduled inspection
Start date: 2019-01-31, end date: 2019-02-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of underground metal structures during the work Installation of aboveground metal structures during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 161902438373
Unscheduled inspection
Start date: 2019-01-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902447204
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-01-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of capital construction facilities with metering devices for energy resources used checking the availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation prevention as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 741802328935
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of the operator's room with the completed stage of work on the installation of a canopy on the installation of engineering networks on the installation of shockproof bumpers on the interior decoration of premises on the installation of technological equipment, pipeline tanks on the installation of security devices and fire alarm devices on the installation of engineering systems inside the operator's room on the installation of a boiler room on landscaping and landscaping on the installation of fire-fighting sanitary and epidemiological measures to ensure access for persons with disabilities upon completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation


# 631802162205
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-14, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 161802204044
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the performed works used in the process of construction reconstruction of an object of capital construction of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used determination of compliance of eliminated violations with the requirements of technical regulations of project documentation of other normative acts as well as drawing up an act on elimination of violations prevention and also, the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 161802200792
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 27112018 9168 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 01112018 1219107401 to 30112018 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer or the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The subject of this audit is to select the necessary compliance with the requirements of state control bodies, supervision bodies, municipal control bodies


# 161802382219
Unscheduled inspection
Start date: 2018-12-28, end date: 2018-12-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the performed works used in the process of construction reconstruction of an object of capital construction of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used determination of compliance of eliminated violations with the requirements of technical regulations of project documentation of other normative acts as well as drawing up an act on elimination of violations prevention and also, the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 161802188925
Unscheduled inspection
Start date: 2018-12-06, end date: 2018-12-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 23112018 case 18112018003 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. according to municipal legal acts, the performance of works and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used to meet the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 g 190FZ


# 161802218739
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 14092018 case 131120180041 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 741802298599
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation dated 16/12/2018, due on 301/12018, 2 Availability of a building permit, 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 161802138833
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741802130861
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 161802169441
Unscheduled inspection
Start date: 2018-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 161802175395
Unscheduled inspection
Start date: 2018-11-30, end date: 2018-12-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 26112018 9054 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 25102018 1219103401 to 26112018


# 741802078437
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 161801998044
Unscheduled inspection
Start date: 2018-10-23, end date: —, duration:
Authority:
Purpose of inspection:


# 161801732299
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161802008214
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-10-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of capital construction facilities with metering devices for energy resources used checking the availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation prevention as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 161800485975
Unscheduled inspection
Start date: 2018-10-31, end date: 2018-11-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21082018 case 121120180084 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility by the developer, customer, or person carrying out reconstruction on the basis of a contract with the developer or customer. 7 The subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts


# 161801903175
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 14092018 case 131120180041, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 741801928200
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-10-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the foundations of reservoirs upon completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 161801564333
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used; determination of the compliance of eliminated violations with the requirements of the technical regulations of the project documentation and other regulatory acts; and also, the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the compliance of works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts


# 161801004333
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-09-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 21082018 case 121120180084, the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility by the developer, customer, or person carrying out reconstruction on the basis of a contract with the developer or customer. 7 The subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts


# 161800635407
Unscheduled inspection
Start date: 2018-08-17, end date: —, duration:
Authority:
Purpose of inspection:


# 161800587569
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Establishment of compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction reconstruction of a capital construction facility dated 23072018 5107 compliance with mandatory requirements or requirements established by municipal legal acts prevention as well as detection and suppression of violations committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer construction of a capital construction facility works according to the requirements of technical regulations, other regulatory legal acts and project documentation


# 161800523417
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 12042018 case 121120180029, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts


# 631800424036
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-22, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800443490
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-18, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Implementation of the previously issued regulation 01050803191 of 20042018


# 631800449630
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-06-22, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 161800354187
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of capital construction facilities with metering devices for energy resources used checking the availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation prevention as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 161800335518
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-05-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 12042018 case 121120180029, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts


# 631800238209
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-20, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800194234
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 631800194296
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 16160701247901
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used, based on the notice received by the Inspection dated 09/122016 11193 on the completion dates that are subject to verification at the capital construction facility, the objectives of this audit are to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.