Found 4 inspections:

# 001902903915
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-08, duration: 10
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" on the basis of instructions from Deputy Prime Minister of the Russian Federation AG Khloponin dated 08022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019"the objectives of this inspection are prevention, detection and suppression violations of mandatory requirements established by federal laws and other normative acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of federal laws and other normative legal acts compliance with Federal laws and other normative legal acts of the Russian Federation as well as normative technical documents in the field of in the field of industrial safety in the operation of hazardous production facilities 7 The subject of this audit is compliance by a legal entity in the course of carrying out activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices lifting mechanisms used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials as well as the same requirements for machinery and equipment and related requirements for these products of the processes of operation and disposal


# 241801920952
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-11-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 174 dated 04102018 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with the works and construction materials used during the construction of an investment facility, as well as the results of such work, are subject to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping an investment facility with metering devices for used energy resources. All acts prescriptions notices on the elimination of violations and deficiencies identified during implementation of regional state construction supervision 72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a building permit


# 24170802681867
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 23082017 3605L on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13102017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701886943
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the notification received from 07082017 vx 179 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and design documentation, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used, Verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.