Found 10 inspections:

# 741902939937
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the heating system wiring warehouse and the construction materials used during the construction of the capital construction facility, as well as the results of project documentation2 Availability of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902573092
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 741902476837
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of translucent structures with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation


# 741802303428
Unscheduled inspection
Start date: 2018-12-19, end date: —, duration:
Authority:
Purpose of inspection:


# 741802095945
Unscheduled inspection
Start date: 2018-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 741801119742
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation, landscaping and landscaping of the territory and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741800583965
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-08-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a rough floor with full readiness and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800484606
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74160700865076
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of metal structures warehouse during installation installation of the second floor floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601717052
Unscheduled inspection
Start date: 2016-07-26, end date: 2016-08-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the brickwork of the walls of the 2nd floor, the installation of the floor covering of the second floor during the installation of the floor covering and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.