Found 5 inspections:

# 00170802734399
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by UralkopringInvest LLC of paragraph 6 of the previously issued instruction on the elimination of identified violations from 30032016 Cb1386rp, the deadline for which expired 15072017


# 662004464097
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program from 23012020 2917151020 Tasks implementation of regional state construction supervision Subject verification of compliance with the performance of works and applicable building materials during the construction of a capital construction facility Engineering center with a roof gas boiler 1 according to ROM 3 stage of construction located at Yekaterinburg the land plot is located in the northeastern part of the cadastral quarter bounded by landmarks st Medik2 public lands The Southern industrial zone along the red line of St. Energetikov st Yuzhny the results of such work meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources. building permits to comply with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004272089
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-03-06, duration: 19
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 2917151020 from 20200123 Tasks implementation of regional state construction supervision Subject verification of compliance with the performance of works and applicable building materials during the construction of a capital construction facility Engineering center with a roof gas boiler room 1 according to ROM 3 stage of construction located at Yekaterinburg the land plot is located in the northeastern part of the cadastral quarter limited by the landmarks of st Medik2 public land The Southern industrial zone along the red line of St. Energetikov st Yuzhny the results of such work meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used building permits to comply with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802734399
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by UralkopringInvest LLC of paragraph 6 of the previously issued instruction on the elimination of identified violations from 30032016 Cb1386rp, the deadline for which expired 15072017


# 00160601545267
Unscheduled inspection
Start date: 2016-03-24, end date: 2016-03-30, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state energy supervision on the basis of an appeal by a deputy of the Legislative Assembly of the Sverdlovsk Region Alshevsky AG in the interests of residents of an apartment building 1002 on Selkorovskaya Street in Yekaterinburg received from the Prosecutor's Office of the Sverdlovsk Region vh O134 of 16022016 on improper operation of a temporary power supply line that poses a threat to the life and health of citizens justification for the need for an unscheduled on-site inspection by the state inspector of the interregional Department of energy supervision Gracheva LB


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.