# 142100110956
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-20, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in connection with Notification No. b/n dated 03/01/2021 (ex. No. 1243 dated 03/01/2021) received by the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), prevention, identification and suppression of violations committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as contractor), violations of legislation on urban planning activities, including project documentation., compliance with mandatory requirements and (or) requirements established by municipal legal acts; compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements; compliance of information contained in the application and documents of a legal entity or individual entrepreneur on granting legal status, special permission (license) for the right to carry out certain types of activities, or permission (approval) for other legally significant actions, if an appropriate unscheduled inspection of a legal entity or individual entrepreneur is provided for by the rules for granting legal status, special permission (license), or granting permission (approval) to mandatory requirements, as well as information about these legal entities and individual entrepreneurs contained in the unified state register of legal entities, the unified State register of individual entrepreneurs and other federal information resources; compliance with the instructions of state control (supervision) bodies, municipal control bodies; holding events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, and cultural significance, which are part of the national library fund; to prevent the occurrence of natural and man-made emergencies; to ensure the security of the State; and to eliminate the consequences of causing such harm.
# 142100052087
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-20, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in connection with Notification No. b/n dated 03/01/2021 (ex. No. 1243 dated 03/01/2021) received by the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), prevention, identification and suppression of violations committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as contractor), violations of legislation on urban planning activities, including project documentation., compliance with mandatory requirements and (or) requirements established by municipal legal acts; compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements; compliance of information contained in the application and documents of a legal entity or individual entrepreneur on granting legal status, special permission (license) for the right to carry out certain types of activities, or permission (approval) for other legally significant actions, if an appropriate unscheduled inspection of a legal entity or individual entrepreneur is provided for by the rules for granting legal status, special permission (license), or granting permission (approval) to mandatory requirements, as well as information about these legal entities and individual entrepreneurs contained in the unified state register of legal entities, the unified State register of individual entrepreneurs and other federal information resources; compliance with the instructions of state control (supervision) bodies, municipal control bodies; holding events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, and cultural significance, which are part of the national library fund; to prevent the occurrence of natural and man-made emergencies; to ensure the security of the State; and to eliminate the consequences of causing such harm.
# 142005284699
Unscheduled inspection
Start date: 2020-12-25, end date: 2020-12-31, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: to review the documents submitted by the developer, the technical customer, the person carrying out the construction for the inspection, related to the performance of the work, including individual works, building structures, sections of engineering support networks, as well as the use of building materials, products, conduct a visual inspection of the work performed, including individual works, building structures, sections of engineering support networks and the use of building materials, products, based on the results of the inspection, prepare an inspection report and submit it to the management of the Department in within 24 hours of its signing, if sufficient data is found during verification indicating the presence of an administrative offense event, immediately draw up a protocol on an administrative offense in the field of construction in accordance with the requirements of Articles 282 285 of the Code of Administrative Offenses of the Russian Federation.
# 142005251294
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 142004426888
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141903998502
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141903823503
Unscheduled inspection
Start date: 2019-10-11, end date: 2019-10-18, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141903454123
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141903454099
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-23, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation For the verification program 1 compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such works meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code Of the Russian Federation, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 141903613209
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-10-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation For the verification program 1 compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such works meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code Of the Russian Federation, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 141902913191
Unscheduled inspection
Start date: 2019-08-02, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902892880
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-07-29, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation For the verification program 1 compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such works meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code Of the Russian Federation, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 141902899124
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: This audit is conducted in order to verify compliance by persons engaged in attracting citizens' funds for the construction of multi-apartment residential buildings "Multi-apartment residential building in the 65th district of Yakutsk" "Multi-apartment residential buildings with warm parking lots in the 68th district of Yakutsk" with the mandatory requirements established by the legislation on participation in shared-equity construction based on the appeal dated 01072019 bx 6043 of the Public Law Company "Foundation for the Protection of the Rights of Citizens participating in Shared-equity Construction"The objectives of this audit are to prevent identify and suppress violations of the requirements established by the legislation on participation in shared-equity building7 committed by developers and persons engaged in attracting funds from participants in shared-equity construction for the construction of apartment buildings and or other real estate objects. The subject of this audit is to note the necessary compliance by persons attracting citizens' funds for the construction of apartment buildings and other real estate objects with the mandatory requirements established by the Federal Law on Shared-equity construction. the Law of 30122004 214FZ "On Participation in the Shared-equity Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and other regulatory legal acts of the Russian Federation adopted in accordance with it, including measures to monitor compliance by the developer with the procedure for disclosure of information and documents provided for in Part 2 of Article 31 of the Federal Federal Law No. 214FZ dated 30122004 in the Unified Housing Construction Information System specified in Part 4 of Article 233 of Federal Law No. 214FZ hereinafter referred to as UISWS
# 141904426868
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902772043
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-13, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141902772036
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902644688
Unscheduled inspection
Start date: 2019-05-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902586621
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141802327981
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-27, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is the actual elimination of violations prescribed by regulation 0408110518 of November 14, 2018 1 compliance with the performance of work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation
# 141802031474
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-11-14, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is the actual elimination of violations prescribed by Regulation 040864318 of August 03, 2018 1 compliance with the performance of work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation
# 141802031443
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141800579742
Unscheduled inspection
Start date: 2018-07-27, end date: 2018-08-03, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is According to the verification program 1 compliance of the work and the construction materials used during the construction of the reconstruction of the capital facility construction as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation
# 14170803003758
Unscheduled inspection
Start date: 2017-12-21, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 14170803003736
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-27, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity 4 as prescribed
# 14170802791478
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-12-01, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 14170701675933
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-19, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the inspection program
# 14170701460553
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-21, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the order
# 14170701380025
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 14160701261287
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-29, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the order
# 14160701058084
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 14160701057938
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-03, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the order
# 14160700091917
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 14160700091907
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 14160601708442
Unscheduled inspection
Start date: 2016-07-20, end date: —, duration: —
Authority: —
Purpose of inspection: