# 721802099993
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721802099406
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 721801938309
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721801938263
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 72170701863967
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 28062017 Prevention of detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of the section of the heating main 2 along Permyakova Street from 2C9 to 2P5A in PU insulation DN800 mm L=153 m in two-tube calculation" located at the address Tyumen region, Tyumen, Permyakova street tp2
# 72170701862141
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-08-14, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 02062017 Prevention of detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of the section of the heating main 9 along Shirotnaya Street from 2C30 to 9P3A in PU insulation 2Du1020 Lk =246 m in two-tube calculation" located at the address Tyumen region, Tyumen, Shirotnayatp2 street
# 72170701754677
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-07-13, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 19052017, prevention of detection and suppression of violations of legislation on urban planning, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of the section of the heating main 3 on Dzerzhinsky Street from 3K14 to 5K27 in PU insulation Du500mm L=515 m in two-tube calculation" located at the address Tyumen region, Tyumen, Dzerzhinsk str. 1
# 74160700125106
Unscheduled inspection
Start date: 2016-09-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 72160700067343
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-16, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 01082016 819pl during the construction of the reconstruction of the capital construction facility, Verification of compliance of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the reconstruction of the capital construction facility "Reconstruction of the tm 1 section along Odesskaya Street from the 1P2 chamber with an increase in the diameter of 2Du=700 mm by 2Du=1000 mm L=900 m" located at Tyumen region, Tyumen, Energetikov TP2 Street