Found 10 inspections:

# 662100282510
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to protect the rights and interests of employees (in connection with the consideration of appeals , the objectives of this audit are: supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms. compliance with mandatory requirements or requirements established by municipal legal acts;


# 662004369011
Unscheduled inspection
Start date: 2020-03-18, end date: —, duration:
Authority:
Purpose of inspection:


# 662004258954
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the notice of completion of construction of BX 3210 dated 22012020 in accordance with the provisions of subparagraph "a" of paragraph 2 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Construction of a block modular boiler capacity 42 MW with supply networks for the heat supply system of the industrial site of ZAO Rejevsky Cable Plant located at the address Sverdlovsk region, Rezh Pereulok Pionersky, the results of such work meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian FederationThe deadline for conducting an inspection is 20 working days. The inspection will begin on February 03, 2020. The inspection will be completed no later than March 02, 2020


# 662004266710
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 661904061962
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-30, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Sverdlovskoi oblasti
Purpose of inspection: The purpose is to prevent threats to the health and life of citizens from environmental pollution. Tasks are to conduct inspections with tests for compliance with the requirements of sanitary legislation. Subject to the requirements of state control and supervision bodies


# 661903999146
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Sverdlovskoi oblasti
Purpose of inspection: The purpose is to prevent threats to the health and life of citizens from environmental pollution. Tasks are to conduct inspections with tests for compliance with the requirements of sanitary legislation. Subject to the requirements of state control and supervision bodies


# 661902880879
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-08-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees


# 661902660378
Unscheduled inspection
Start date: 2019-04-18, end date: —, duration:
Authority:
Purpose of inspection:


# 661802085206
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-12-10, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the developer's notification on the start of construction of the capital construction facility bx 36091 dated 28082018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Construction of a 42 MW block modular boiler house with supply networks for the heat supply system of the industrial site of ZAO Rejevskaya Kabelny the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800627341
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.