# 282101476452
Unscheduled inspection
Start date: 2021-12-20, end date: 2021-12-31, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, based on the notice of completion of the facility (vx. No. 2375 dated 12/14/2021)., prevention, identification and suppression of by the developer, the technical customer, the person carrying out the construction of violations of the compliance of the work performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used., verification of the compliance of the work and the construction materials used during the construction of the capital construction facility construction, as well as the results of such work in project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources.;
# 282101443607
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-27, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 03/05/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources;, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101331298
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282100676498
Unscheduled inspection
Start date: 2021-09-14, end date: 2021-09-27, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 04/13/2020. The objectives of this inspection are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100813881
Unscheduled inspection
Start date: 2021-09-24, end date: 2021-10-07, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: to implement the inspection program approved on 03/05/2021, the objectives of this inspection are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and equipment requirements of the capital construction facility The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.;
# 282100284098
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-28, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: - execution of the inspection program approved on 04/13/2020, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources.
# 282100305995
Unscheduled inspection
Start date: 2021-06-24, end date: 2021-07-07, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved on 03/05/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources., verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100146862
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-04-16, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the goal:
- execution of the inspection program approved on 03/05/2021
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources.
# 282100143118
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-04-20, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 04/13/2020
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100008898
Unscheduled inspection
Start date: 2021-02-17, end date: 2021-03-18, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program.
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282005246097
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-24, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the verification program The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282004486490
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-09-11, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 07102019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004430401
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-07-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 07102019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004421016
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the verification program The tasks of this audit are the prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility as well as the results of such work meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004415854
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent identify and suppress violations of compliance by the developer, technical customer, and the person carrying out the construction of the as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, The purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements for energy efficiency and equipment capital construction facility with metering devices for used energy resources
# 282004281610
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-03-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 18/122018the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004234878
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281904042856
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 07102019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance with the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281904100368
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v Amurskoi oblasti
Purpose of inspection: This audit is carried out with the aim of implementing federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms consideration of the appeal dated 29112019 g 287322119 on violations of labor legislation requirements including labor protection requirements that entailed the threat of harm to the life and health of employees not conducting a special assessment of working conditions as well as on the facts of evasion from The objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 281903880573
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-11-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose based on the receipt of the notification of the start of construction 27092019 of the execution of the inspection program approved on 07102019the tasks of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 281903855229
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 18/122018the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281903888066
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-11-13, duration: —
Authority: Gosudarstvennaya inspekciya truda v Amurskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms in connection with the consideration of appeals No. 287272619OB dated 15102019 on violation by the employer of the labor rights of employees in terms of dismissal and delay in issuing a work record and final settlement upon dismissal. The purpose of this audit is to ensure compliance with and protection of labor rights. citizens' rights and freedoms, including the right to safe working conditions, The subject of this audit is to comply with mandatory requirements and or requirements established by municipal legal acts
# 281902987773
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-09-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent identify and suppress violations of compliance by the developer, technical customer, and the person carrying out the construction of the as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, The purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements for energy efficiency and equipment capital construction facility with metering devices for used energy resources
# 281902876838
Unscheduled inspection
Start date: 2019-07-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902893607
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 15/122017the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902817065
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent, identify and suppress violations of compliance by the developer, the technical customer, the person carrying out the construction, and as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources
# 281902731117
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-06-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 15/122017the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902633143
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902604579
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 13042018 is to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281902485439
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-03-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 15122017 is to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 281802331291
Unscheduled inspection
Start date: 2018-12-24, end date: 2019-01-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 18/12/2018 is to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281802002805
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-11-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281801669987
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 15122017 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800537008
Unscheduled inspection
Start date: 2018-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281800560486
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 13042018 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800469713
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent identify and suppress violations of compliance by the developer, the technical customer, and the person carrying out the construction The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 281800409470
Unscheduled inspection
Start date: 2018-05-30, end date: 2018-06-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 06062016 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281800409102
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 06062016 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281800301894
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of receiving a notice of the start of construction, the execution of the inspection program approved on 13042018, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281800244456
Unscheduled inspection
Start date: 2018-03-29, end date: 2018-04-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 06062016 is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of the audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281800079881
Unscheduled inspection
Start date: 2018-02-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281800011032
Unscheduled inspection
Start date: 2018-01-24, end date: 2018-02-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved by 06062016
# 28170803019432
Unscheduled inspection
Start date: 2017-12-20, end date: 2018-01-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: receipt of the notification of the start of construction, execution of the inspection program approved on 15/122017
# 28170803019014
Unscheduled inspection
Start date: 2017-12-20, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya po ohrane obektov kulturnogo naslediya Amurskoi oblasti
Purpose of inspection:
# 28170802920528
Unscheduled inspection
Start date: 2017-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 28170802596188
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 06062016