# 772201545685
Unscheduled inspection
Start date: 2022-01-20, end date: —, duration: 10
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: izvescheniya ob okonchanii stroitelstva ot 29-12-2021 № P001-9099470875-53515448
# 772101164017
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: 4
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Ispolneniya Izveschenie ob ustranenii narushenii № P001-9099470875-50039120 ot 22-09-2021 v ramkah Predpisanie ob ustranenii narushenii № 03-46-097400-5-06 ot 10.08.2020. ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentaciina obekte Rekonstrukciya chasti torgovoi galerei torgovo-razvlekatelnogo centra MEGA i chasti magazina IKEA po adresu: Moskovskaya obl., g. Himki, mikroraion IKEA, korp. 1, 2po adresu: Moskovskaya obl., g. Himki, mikroraion IKEA, korp. 1, 2
# 772100139605
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-11, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the facts stated in the notice of completion of construction No. P001-4992151502-44228159 dated 04/05/2021.
# 362005241221
Unscheduled inspection
Start date: 2020-11-26, end date: 2020-12-09, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 772004214719
Unscheduled inspection
Start date: 2020-01-21, end date: 2020-01-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771904115378
Unscheduled inspection
Start date: 2019-12-18, end date: 2020-01-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771903800377
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 501902612023
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-12, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya ot 12032019 0824020400501 so srokom ispolneniya do 29032019
# 661801745504
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri rekonstrukcii obekta kapitalnogo stroitelstva rezultatov takih rabot proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 661801745494
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri rekonstrukcii obekta kapitalnogo stroitelstva rezultatov takih rabot proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 661801745484
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801644667
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661801611000
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501801656016
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-01, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya ot 03072018 0342000300508 napravleno izveschenie ob ustranenii narushenii ot 14092018 R001384608901416224765
# 661800544775
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800572973
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-08-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Predmet proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri rekonstrukcii obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 661800572835
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800572745
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803172680
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 661800369098
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291307125 P2 ot 02 aprelya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii ot 02 aprelya 2018 goda 291307125 P2
# 661800368745
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291307124 P2 ot 02 aprelya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii ot 02 aprelya 2018 goda 291307124 P2
# 77180803123494
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 661800179343
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: s celyu realizacii programmy provedeniya proverok 2917012818 ot 31 yanvarya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri rekonstrukcii obekta kapitalnogo stroitelstva «6 etap v urovne molla na otm +5700 v osyah «1a2»«GM» «1a1b»«JM» «2 1a»«L» rezultatov takih rabot trebovaniyam tehnicheskih reglamentov trebovaniyam pozharnoi bezopasnosti pravilam bezopasnosti i gosudarstvennym standartam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 661800179287
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803107902
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-03-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 661800090905
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: s celyu realizacii programmy provedeniya proverok 2917012418 ot 31 yanvarya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenimyh stroitelnyh materialov pri rekonstrukcii obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam tehnicheskih reglamentov trebovaniyam pozharnoi bezopasnosti pravilam bezopasnosti i gosudarstvennym standartam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov a takzhe nalichiya razresheniya na stroitelstvo i vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 77180803059057
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802995539
Unscheduled inspection
Start date: 2017-12-15, end date: 2018-01-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802758766
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-11-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802590674
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802547238
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170801930264
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-09-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 50170801916304
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-31, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu proverki ustraneniya narushenii izveschenie ob ustranenii narushenii ot 16082017 P00175344031517836671 v ramkah predpisaniya ot 05072017 0536000300502 so srokom vypolneniya do 16082017 zadachami nastoyaschei proverki yavlyayutsya ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva TorgovoRazvlekatelnyi Centr po adresu Moskovskaya oblast Pushkinskii rn peresechenie YAroslavseogo i Krasnoarmeiskogo shosse Predmetom nastoyaschei proverki yavlyaetsya proverka ispolneniya predpisaniya ot ot 05072017 0536000300502 so srokom vypolneniya do 16082017
# 77170801929596
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-09-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701532939
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701400473
Unscheduled inspection
Start date: 2017-02-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701135727
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160700352887
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-09-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 733416 ot 13072016
# 77160601778586
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 493716 ot 31052016
# 77160601700480
Unscheduled inspection
Start date: 2016-07-07, end date: —, duration: —
Authority: —
Purpose of inspection: