Found 2 inspections:

# 522100002855
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-16, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out in order to: verify compliance with the requirements of Regulation No. 17.09.2020 519-03/01-04/77 issued to the person carrying out the construction – LLC IC Agrospectech-NN, as well as on the basis of an approved inspection program for the capital construction facility, in order to assess the compliance of the work and the construction materials used during the construction process, as well as the results of such work meet the requirements of approved design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code Of the Russian Federation, including when performing the construction phase (structures above the ed.0.000). The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.


# 521800304180
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the approved inspection program for the capital construction facility and also in order to verify compliance with the requirements of the instruction from 07032018 5190303040408 issued to the person carrying out the construction of LLC IC Agrospectechnn to assess the compliance of work and construction materials used in the construction process with the requirements of technical regulations norms and rules and design documentation, including during the construction phase of the aboveground structure parts 14 floors The task of verification is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.