Found 9 inspections:

# 662100643238
Unscheduled inspection
Start date: 2021-09-14, end date: 2021-10-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-18-01/204-19 dated 2020-07-10; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Reconstruction of the water pipeline along Mechanizatorov St., located at the address: Kamyshlov, Sverdlovsk region, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662004488733
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 662004459268
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 661903877569
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements from 26082019 291807259 P The task is to carry out regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements from 26082019 291807259 P


# 661903465615
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 661902908286
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29180120419 dated July 05, 2019. The task is to carry out regional state construction supervision. The subject is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Reconstruction of the water pipeline along Mechanizatorov St." located at the address Kamyshlov St. Mechanizatorov, Sverdlovsk region, Russian Federation. The results of such work with the requirements of the design documentation


# 741802008186
Unscheduled inspection
Start date: 2018-11-05, end date: —, duration:
Authority:
Purpose of inspection:


# 741801557892
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the ordinance dated 07092018 with a deadline of 28092018 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801913967
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.