Found 67 inspections:

# 00170701654594
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 142101363225
Unscheduled inspection
Start date: 2021-11-26, end date: 2021-12-10, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on March 22, 2021, compliance with the construction of a capital construction facility by the developer, technical customer, construction contractor, mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction, reconstruction of the facility capital construction;., prevention, detection and suppression of violations of legislation on urban planning activities, including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor).


# 142101333106
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-26, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: in connection with Notification No. 1 dated November 08, 2021 (order No. 8534 dated November 08, 2021) received by the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia): a) compliance of the constructed capital construction facility with the requirements of the design documentation, including energy efficiency requirements and equipment requirements for the capital construction facility accounting for the energy resources used; b) elimination by the developer, the technical customer, the person carrying out the construction, identified during construction control and state construction supervision of all violations of compliance of the work performed with the requirements of regulatory legal acts and project documentation; c) execution of executive documentation related to the performance of all construction work, as well as the use of building materials (products);, prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor), compliance with mandatory requirements and (or) requirements established by municipal legal acts. acts;


# 142100907826
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-10-08, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), dated June 15, 2020, compliance with the mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction and reconstruction during the construction of a capital construction facility by the developer, technical customer, and the person carrying out the construction capital construction facility;, prevention, detection and suppression of violations of legislation on urban development activities, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor), compliance with mandatory requirements and (or) requirements established by municipal legal acts. acts;


# 142100495745
Unscheduled inspection
Start date: 2021-08-24, end date: 2021-09-07, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on December 23, 2020, compliance with the construction of a capital construction facility by the developer, technical customer, construction contractor, mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction, reconstruction of the facility capital construction;, prevention, detection and suppression of violations of legislation on urban planning activities, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor);, compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 142100348647
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), dated 06/15/2020, compliance with mandatory requirements in the field of construction and applied building materials (products) during the construction of a capital construction facility by the developer, technical customer, and the person carrying out the construction, the established procedure for the construction and reconstruction of a capital construction facility construction; The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor).


# 142100177323
Unscheduled inspection
Start date: 2021-04-20, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha (YAkutiya)
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms.


# 142100111732
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-22, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on March 22, 2021, compliance with the construction of a capital construction facility by the developer, technical customer, construction contractor, mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction, reconstruction of the facility The objectives of this audit are: prevention, detection and suppression of violations of legislation on urban development, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor), compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 142100052354
Unscheduled inspection
Start date: 2021-02-25, end date: 2021-03-04, duration: 6
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia) dated 06/15/2020, compliance with the construction of the capital construction facility by the developer, the technical customer, the person carrying out the construction, mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction, reconstruction of the capital construction facility;, prevention, detection and suppression of violations of legislation on urban planning activities, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor), compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 142005222366
Unscheduled inspection
Start date: 2020-11-18, end date: 2020-11-27, duration: 8
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity


# 142004446363
Unscheduled inspection
Start date: 2020-07-08, end date: 2020-07-31, duration: 18
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity


# 142004430222
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-07-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity


# 142004322386
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141903971844
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141903969427
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 141903643757
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-10-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on December 03, 2018. compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for the construction and reconstruction of the capital construction facility during the construction of the developer, the technical customer, the person carrying out the construction, the established procedure for the construction and reconstruction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 141902960382
Unscheduled inspection
Start date: 2019-08-16, end date: —, duration:
Authority:
Purpose of inspection:


# 141902929430
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: This inspection is carried out in order to verify in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on December 12, 2018, compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for construction and reconstruction of the capital construction facility during construction by the developer, the technical customer, and the person carrying out the construction. the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code. The Code of the Russian Federation


# 141902776623
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 141902793131
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity


# 141902704449
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-05-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: in order to verify, in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on December 03, 2018, compliance with the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for construction and reconstruction of the capital construction facility by the developer, technical customer, and the person carrying out the construction of the established procedure for construction and reconstruction of the capital construction facility is the prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 141902738283
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, Subject to verification 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902648682
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-12, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: Verification of the compliance of the information contained in the submitted application of JSC Yakutpromstroy with the licensing requirements application for granting a license of the VH URPN under RS Ya 1919 dated 14022019 The objectives of this audit are licensing control of compliance of the applicant for the license of JSC Yakutpromstroy with the licensing requirements when carrying out activities for the transportation of hazard class IV waste The subject of this audit is the compliance of the information contained in the application and documents of a legal entity or individual an entrepreneur's request for granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements for the condition of premises buildings structures technical facilities equipment and other facilities that are intended to be used by the license applicant or by the licensee in carrying out the licensed type of activity and the availability of employees necessary for carrying out the licensed type of activity in order to assess the compliance of such facilities and employees with the licensing requirements


# 141902637063
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-10, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: Verification of the information contained in the submitted application of JSC Yakutpromstroy to the licensing requirements application for granting a license of the VX URPN under RS Ya 1919 dated 14022019 The objectives of this audit are licensing control of compliance of the applicant for the license of JSC Yakutpromstroy with licensing requirements when carrying out activities for the transportation of hazard class IV waste The subject of this audit is compliance of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of approval approval to mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities individuals in the Unified State Register of Individual Entrepreneurs and other federal information resources


# 141902583941
Unscheduled inspection
Start date: 2019-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 141902497854
Unscheduled inspection
Start date: 2019-02-13, end date: 2019-02-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on December 03, 2018, compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for the construction and reconstruction of the capital construction facility during construction by the developer, the technical customer, the person carrying out the construction of the established procedure for the construction and reconstruction of the capital construction facility. the technical customer as well as the person carrying out the construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor violations of the legislation on urban development, including technical regulations and project documentation


# 141902511722
Unscheduled inspection
Start date: 2019-02-22, end date: —, duration:
Authority:
Purpose of inspection:


# 141802208846
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141802309175
Unscheduled inspection
Start date: 2018-12-19, end date: 2018-12-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, Subject to verification 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation


# 141802170838
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-11-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, Subject to verification verification of the actual elimination during the construction of the capital construction facility of previously identified violations prescribed for elimination by regulation 040843218 dated June 15, 2018 1 compliance performance of works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work to the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation


# 141802052602
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, Subject to verification verification of the actual elimination during the construction of the capital construction facility of previously identified violations prescribed for elimination by regulation 040843218 dated June 15, 2018 1 compliance performance of works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work to the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation


# 141801967080
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141801756542
Unscheduled inspection
Start date: 2018-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 141802045832
Unscheduled inspection
Start date: 2018-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 141801120329
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141801120279
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141801113845
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-09-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800597639
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141800557882
Unscheduled inspection
Start date: 2018-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 141800587176
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 141800478309
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141800548562
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 141800439461
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141800439416
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity 4 verification according to the instruction 04083918 dated 220118


# 141800183200
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 the fulfillment of the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates of admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity 4 according to the inspection program


# 141800190694
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-03, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt of a reasoned submission by an official about a violation of labor legislation


# 141800032440
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14180803052256
Unscheduled inspection
Start date: 2018-01-18, end date: —, duration:
Authority:
Purpose of inspection:


# 141800030342
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-01-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity 4 Verification of compliance with regulation 0408153617 of 12122017


# 14170802919501
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration:
Authority:
Purpose of inspection:


# 14170802818767
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802871191
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 14170802618864
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, and the person carrying out construction on the basis of a contract with the developer or customer, hereinafter referred to as the contractor. The subject of this audit is the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction work that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 according to the inspection program


# 14170701882087
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal person4 an order


# 14170701805455
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used2 availability of a construction permit3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal person4 as prescribed by


# 14170701770689
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701805524
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701761361
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701654594
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170701513418
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14170701439906
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14170701384538
Unscheduled inspection
Start date: 2017-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701319805
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-02-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14160701049783
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14160701049777
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to eliminate violations prescribed for elimination by Regulation 040886616 of August 02, 2016 1 compliance of the work and the applicable construction materials during the construction and reconstruction of the capital construction facility, as well as the results of such work, requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources,2 availability of a construction permit,3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, availability of a certificate of admission to construction and reconstruction work that have an impact for the safety of capital construction facilities, including certificates of admission to work on the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.


# 14160601773705
Unscheduled inspection
Start date: 2016-08-05, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14160601739980
Unscheduled inspection
Start date: 2016-07-28, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.