Found 46 inspections:

# 362101329951
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 362100693924
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to prevent, identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer. The objectives of this audit are compliance with mandatory requirements or requirements established by municipal legal acts, compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements


# 362100289412
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: 11
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to prevent, identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer. The objectives of this audit are compliance with mandatory requirements or requirements established by municipal legal acts, compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements


# 362100210973
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: 12
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to prevent, identify and suppress violations of the legislation on urban development, including the requirements of the project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of a contract with the developer or the technical customer. The objectives of this audit are to comply with mandatory requirements or requirements established by municipal legal acts, and to ensure that the information contained in the notification of the commencement of certain types of business activities meets the mandatory requirements.


# 362100210907
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration: 14
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to prevent, identify and suppress violations of the legislation on urban development, including the requirements of the project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of a contract with the developer or the technical customer. The objectives of this audit are to comply with mandatory requirements or requirements established by municipal legal acts, and to ensure that the information contained in the notification of the commencement of certain types of business activities meets the mandatory requirements.


# 362105316306
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-02-15, duration:
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: monitoring of the employer's compliance with the instruction issued by the Federal Labor Inspectorate on the elimination of identified violations of the requirements of labor legislation and other regulatory legal acts containing labor law norms No. 36/5-1186-20- PV/12-10230-I/04-226 dated 07/27/2020


# 362005181885
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-23, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 362005182129
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-23, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 362004478988
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration:
Authority:
Purpose of inspection:


# 362004443570
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-27, duration:
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in accordance with Rostrud's Order No. 07022020 29 issued on the basis of instructions from Deputy Prime Minister of the Russian Federation Tatyana Golikova dated December 27, 2019 TG 1211486 with amendments to Rostrud's order No. 05062020 122 dated 11062020 126


# 362004371335
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-05-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 362004370857
Unscheduled inspection
Start date: 2020-05-14, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:


# 361903402783
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:


# 361903403886
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 361902853941
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-07-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts


# 361902787921
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts


# 361902673091
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 361902780215
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is conducted in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer on urban planning activities, including the requirements of project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 361902607490
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 361902605686
Unscheduled inspection
Start date: 2019-04-05, end date: 2019-04-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 361902666496
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-05-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 361902580526
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of this audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 361902580847
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 361902447966
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to verify the fulfillment of a previously issued instruction on the elimination of identified violations. The objectives of this audit are to prevent, identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of an agreement with the developer or the technical customer, including the requirements of project documentation. The subject of this audit is the fulfillment of the instructions of state control bodies supervision of municipal control bodies


# 361802213847
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the construction of the capital construction facility, the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts.


# 361802137754
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 361802056506
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-11-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 361801239444
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts.


# 361802056627
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-11-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 361800353668
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out on the basis of a notice on the completion dates of works subject to inspection during the construction of a capital construction facility from VMU2 LLC dated 27042018 6810774 The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 361800228892
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts.


# 361800333941
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: The purpose is to verify the compliance of VMU2 LLC's statements for the fourth quarter of 2017, vx 6810510 dated 30032018, on activities related to attracting funds from equity construction participants for the construction of apartment buildings and or other real estate objects, with accounting statements, including annual ones, prepared in accordance with the requirements of the legislation of the Russian Federation and or the project declaration with the mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and or other real estate objects memo dated 16042018 6812379 The main objectives of the audit are to prevent identify and suppress violations of the legislation of the Russian Federation in the field of shared-equity construction protect the rights and legitimate interests of participants in shared-equity construction The subject of the audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 361800204883
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 361800063140
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 36170802838481
Unscheduled inspection
Start date: 2017-11-17, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:


# 36170802447998
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is compliance with mandatory requirements or requirements established by municipal legal acts


# 36170802448328
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is compliance with mandatory requirements or requirements established by municipal legal acts


# 36170701846248
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is compliance with mandatory requirements or requirements established by municipal legal acts


# 36170701814774
Unscheduled inspection
Start date: 2017-07-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:


# 36170701722160
Unscheduled inspection
Start date: 2017-06-15, end date: —, duration:
Authority:
Purpose of inspection:


# 36170701428641
Unscheduled inspection
Start date: 2017-04-04, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:


# 36170701428375
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Article 54 of the Urban Planning Code of the Russian Federationfederal Law No. 294 FZ dated 26122008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control, Supervision and Municipal Control"Decree of the Government of the Russian Federation No. 54 dated 0102200 "On State Construction Supervision in the Russian Federation"Order No. 1129 of the Federal Service for Environmental, Technological and Nuclear Supervision dated December 26, 2006 "On Approval and Enactment of the Procedure for Conducting Inspections during State Construction Supervision and Issuing Conclusions on the Compliance of Constructed Reconstructed Repaired Capital Construction Facilities with the Requirements of Technical Regulations, Norms and Rules of Other Regulatory Legal Acts of Project Documentation"This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 36170701428417
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Article 54 of the Urban Planning Code of the Russian Federationfederal Law No. 294 FZ dated 26122008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control, Supervision and Municipal Control"Decree of the Government of the Russian Federation No. 54 dated 0102200 "On State Construction Supervision in the Russian Federation"Order No. 1129 of the Federal Service for Environmental, Technological and Nuclear Supervision dated December 26, 2006 "On Approval and Enactment of the Procedure for Conducting Inspections during State Construction Supervision and Issuing Conclusions on the Compliance of Constructed Reconstructed Repaired Capital Construction Facilities with the Requirements of Technical Regulations, Norms and Rules of Other Regulatory Legal Acts of Project Documentation"This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 36170701325159
Unscheduled inspection
Start date: 2017-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 36160701234635
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: the real test is conducted to review the treatment 7478716ОБ from 291116г When establishing goals of testing indicate the following information in the event of a scheduled review, a link to the approved annual plan of scheduled of proverok in case of unscheduled exit inspection of the details of the previously issued check to the face of orders to eliminate violations of the period of time for performance has expired details of complaints and applications of citizens of legal entities and individual entrepreneurs entered the bodies of state control of the oversight bodies of municipal control the details of the order the order of the head of the state control body oversight issued in accordance with the instructions of the President of the Russian Federation government of the Russian Federation, the details of requirements of the Prosecutor to conduct an unscheduled inspection under supervision the execution of the laws and the details attached to the demand of materials and obrasheniya in the case of an unscheduled on-site inspection which is subject to the approval authorities of the Prosecutor's office for the adoption of urgent measures must be carried out promptly in connection with injury or violation check the requirements if such harm, or violation of the requirements discovered immediately at the time of the Commission of the details of the attached copy of the report of the report and the other presented to the officer detected the breach objectives of this review are to ensure respect for and protection of labor rights and freedoms of citizens, including the right to safe working conditions and the implementation of supervision and control over the observance by the employees of the legislation of the Russian Federation on work occupational health and ensuring employer compliance with labor laws and other regulatory legal acts containing norms of labor law


# 36160601789670
Unscheduled inspection
Start date: 2016-09-21, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.